Exhibit C - Upright Headstone Realignment Diagrams.pdf

PDF 187 KB Posted

Attached to
Y1PZ--863-NSP26-003 National Shrine Project at Mound City National Cemetery
Solicitation number
36C78626B0016
Issued by

About this file

This document is an exhibit containing technical diagrams for upright headstone realignment procedures in burial sections.

Figure 2 presents a plan view of burial section realignment, illustrating the systematic placement of keystones and headstones using string lines and alignment grids. The diagram shows an initial keystone positioned centrally, with subsequent keystones established to create a realignment grid. String lines are used to align both transverse and row directions, with rows required to be parallel to columns. The diagram indicates that in sloping terrain, additional keystones may be necessary to provide smooth transitions. Intermediate headstones are positioned after keystones are established, with the annotation specifying that subsequent keystones should be set onto the realignment grid.

Figure 3 provides elevation views of burial section realignment in both flat and sloped sections. The flat section diagram shows headstone placement relative to existing undisturbed soil surface and mean or average top soil surface levels, with realigned headstones positioned on a solid line and original headstone locations marked with a dashed line. The sloped section diagram illustrates projected vertical alignment relative to average top soil level using an imaginary string line, demonstrating how headstones should be repositioned on slopes while maintaining consistent vertical alignment relative to the existing terrain and original locations.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT ‘C’

UPRIGHT HEADSTONE REALIGNMENT DIAGRAMS

cemGaussM Callout Initial Keystone cemGaussM Callout Subsequent Keystones (To be set onto the realignment grid) cemGaussM Callout Intermediate headstones are set after keystones are established cemGaussM Text Box In sloping terrain additional keystones may need to be set to provide a smooth transition

File details come from the government source that posted it. Updated .