- Solicitation number
- 36C78626B0014
About this file
This is an Invitation for Bid (IFB) Cost Estimate Worksheet for a construction project at Alton National Cemetery. The worksheet is a lump sum cost estimation template designed for Solicitation Number 36C78626B0014, Project Number 800-NSP26-001, titled the National Shrine Project at Alton National Cemetery located at 600 Pearl Street, Alton, Illinois 62002. The project is being administered by the Department of Veterans Affairs National Cemetery Administration.
The cost estimate worksheet requires contractors to provide lump sum bids for each applicable construction division. The divisions included are: Special Sections; General Requirements (Division 01); Existing Conditions (Division 02); Concrete (Division 03); Masonry (Division 04); Metals (Division 05); Wood, Plastic, and Composites (Division 06); Thermal and Moisture Protection (Division 07); Openings (Division 08); Finishes (Division 09); Specialties (Division 10); Equipment (Division 11); Furnishings (Division 12); Special Construction (Division 13); Fire Suppression (Division 14); Plumbing (Division 22); HVAC (Division 23); Integrated Automation (Division 25); Electrical (Division 26); Communications (Division 27); Electronic Safety and Security (Division 28); Earthwork (Division 31); Exterior Improvements (Division 32); and Utilities (Division 33). Contractors must mark divisions not being used as "N/A" and may add additional line items as deemed appropriate. The worksheet includes separate rows for bonds, overhead, profit, and grand totals to arrive at the final contract price.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78626B0014 |
| Project Nunber | 800-NSP26-001 |
| Project Name | National Shrine Project at Alton National Cemetery |
| Division | Unit | CLIN 001 | Total |
| Division 0 | |||
| Special Sections | |||
| Division 01 | |||
| General Requirements | |||
| Division 02 | |||
| Existing Conditions | |||
| Division 03 | |||
| Concrete | |||
| Division 04 | |||
| Masonry | |||
| Division 05 | |||
| Metals | |||
| Division 06 | |||
| Wood, Plastic, and Composites | |||
| Division 07 | |||
| Thermal and Moisture Protection | |||
| Division 08 | |||
| Openings (Doors, Windows, etc...) | |||
| Division 09 | |||
| Finishes | |||
| Division 10 | |||
| Specialties | |||
| Division 11 | |||
| Equipment | |||
| Division 12 | |||
| Furnishings | |||
| Division 13 | |||
| Special Construction | |||
| Division 14 | |||
| Fire Suppression | |||
| Division 22 | |||
| Plumbing | |||
| Division 23 | |||
| Heat, Ventilating, and Air Conditioning | |||
| Division 25 | |||
| Integrated Automation | |||
| Division 26 | |||
| Electrical | |||
| Division 27 | |||
| Communications | |||
| Division 28 | |||
| Electronic Safety and Security | |||
| Division 31 | |||
| Earthwork | |||
| Division 32 | |||
| Exterior Improvements | |||
| Division 33 | |||
| Utilities | |||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $