Attachment 1 - Work Summary Progress Report Uprights.pdf

PDF 253 KB Posted

Attached to
Y1PZ--800-NSP26-001 National Shrine Project at Alton National Cemetery
Solicitation number
36C78626B0014
Issued by

About this file

This is a Work Summary & Progress Report form for tracking contractor performance on upright headstone raise and realignment services at National Shrine cemetery locations.

The form documents completion of six primary work categories: (1) selection and installation of section keystones with licensed surveyor verification and COR approval; (2) excavation of upright headstone sockets with 3-inch minimum clearance on all sides and proper crushed stone base preparation; (3) installation of upright headstones at uniform heights (25 inches above ground, or 20 inches for older/smaller headstones) with horizontal and vertical plumb tolerances of 1/8 inch transversely/laterally and one degree vertically, verified through COR random sampling; (4) firm setting of headstones in all soil and terrain conditions to eliminate movement or play, confirmed through COR random checks; (5) achievement of neat overall appearance with uniform vertical, lateral, and transverse alignment creating smooth transitions within sections and adjoining sections; and (6) cleaning of headstones per contract requirements. The contractor and Cemetery Director/Contracting Officer's Representative (COR) must sign the form confirming completion and receipt of the progress report. The form includes fields for recording period covered, cemetery location, contractor information, contract number, quantity of work completed, section numbers, and dates completed for each work item. Space is provided to document circumstances affecting work progress such as weather, strikes, or government delays. The form explicitly states it is not to be used as an invoice and may be duplicated as necessary for ongoing progress reporting.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

WORK SUMMARY & PROGRESS REPORT

UPRIGHT HEADSTONE RAISE & REALIGNMENT

WORK SUMMARY & PROGRESS

REPORT

Period Covered:

From: To:

Contractor Information: Cemetery Location:

Project Title:

National Shrine Project Upright Headstone Raise and Re-alignment

Contract No:

Inspection / Acceptance: The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price.

The Government shall exercise its post-acceptance rights:

1. Within a reasonable time after the defect was discovered or should have been discovered; and

2. Before any substantial change occurs in the condition of the item unless the change is due to the defect in the item.

WORK COMPLETED & SUBMITTED FOR ACCEPTANCE

(This form is not to be used as an Invoice)

1.

Section keystones have been properly chosen with the approval of the COR in order to achieve a smooth, flowing transition between the rows and columns. Keystones have been set in accordance with the requirements using a licensed surveyor.

No. of Keystones & Section #’s:

Date Completed:

2.

Upright headstone sockets are dug with a 3-inch minimum clearance on all four sides and the bottom of the headstone to meet the height and alignment requirements. Sockets are clean and free of loose dirt and debris. The crushed stone base material has been added to the correct level and fully compacted.

Quantity & Section #’s:

Date Completed:

3.

Upright headstones in burial sections are uniform in height (25") above ground (20" for older/smaller headstones), horizontally and vertically plumb, with inscriptions visible, and installed to ensure a pleasing top line while compensating for irregular terrain (sloping and uneven ground). Transverse and lateral alignment is within the maximum allowable tolerance of 1/8" and vertical alignment is within one degree of fully vertical when measured on front and sides using a digital level. COR has randomly sampled the headstones to verify height and alignment.

Quantity & Section #’s:

Date Completed:

4.

Completed raised and realigned headstones in all soil and terrain conditions are firmly set in place so that the headstones are rigid with no give or play. COR has randomly checked to assure headstones are firmly set in place.

Section Numbers:

Date Completed:

5.

Headstones otherwise present a neat overall appearance in a line vertically, laterally & transversely and provide a uniformly flowing transition throughout the Section and with adjoining Sections.

Section Numbers:

Date Completed:

6. Headstones have been cleaned in accordance with the contract requirements.

Quantity & Section #’s:

Date Completed:

Report below any circumstances which may have adversely affected work progress such as weather, strikes, delays by the Government, etc.

Signature of Contractor: Date Signed

Signature of Cemetery Director / COR Date Signed

Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.

Duplicate Form as Necessary