Exhibit C - Upright Headstone Realignment Diagrams.pdf

PDF 187 KB Posted

Attached to
Y1PZ--800-NSP26-001 National Shrine Project at Alton National Cemetery
Solicitation number
36C78626B0014
Issued by

About this file

This document is an exhibit containing technical diagrams for upright headstone realignment procedures in burial sections.

The exhibit presents two technical figures illustrating the realignment methodology. Figure 2 depicts a plan view (overhead perspective) of burial section realignment, showing the systematic placement of keystones as reference points for establishing proper alignment grids. The diagram indicates that an initial keystone is positioned first, followed by subsequent keystones placed onto the realignment grid. String lines are used to align both transverse and row directions. The diagram notes that in sloping terrain, additional keystones may be required to provide smooth transitions, and intermediate headstones are set after keystones are established with rows positioned parallel to one another and columns parallel to alignment guidelines.

Figure 3 provides elevation views illustrating vertical alignment methods for both flat and sloped burial sections. The flat section diagram shows headstones realigned to a solid line reference with original headstone locations marked by dashed lines, accounting for existing uneven top soil surfaces. The sloped section diagram depicts a projected vertical alignment relative to average top soil level, using an imaginary string line to establish proper positioning on terrain with grade variations. Both elevation views demonstrate how headstones are repositioned from their original locations while maintaining proper vertical and horizontal alignment according to the realignment procedure specifications.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT ‘C’

UPRIGHT HEADSTONE REALIGNMENT DIAGRAMS

cemGaussM Callout Initial Keystone cemGaussM Callout Subsequent Keystones (To be set onto the realignment grid) cemGaussM Callout Intermediate headstones are set after keystones are established cemGaussM Text Box In sloping terrain additional keystones may need to be set to provide a smooth transition

File details come from the government source that posted it. Updated .