Attachment 9 - Contractors Daily Log of Construction.pdf

PDF 165 KB Posted

Attached to
Y1PZ--800-NSP26-001 National Shrine Project at Alton National Cemetery
Solicitation number
36C78626B0014
Issued by

About this file

This is a template for a Contractor's Daily Log of Construction Inspector Quality Assurance Report (Q.A.R.), used to document construction project activities and progress on a daily basis. The form is designed for federal construction contracts and serves as an official record of on-site activities, workforce allocation, and project status.

The template captures essential project identification information including contract number, project title, location, contractor details, and key personnel contacts (Contracting Officer, COR, Site Manager, and Midwest District Project Managers). It documents daily weather conditions (temperature, precipitation, visibility, and wind speed) and identifies weather-related delays affecting 50% or more of the critical path. The form tracks workforce composition across various trades and management positions, records equipment and materials on-site, and documents visitors. It includes sections for project comments, identified deficiencies, potential delay causes, and tests/observations conducted. The work accomplished section is organized by MasterFormat divisions: Division 1 (General Conditions, including shop drawings and testing laboratory services), Division 2 (Existing Conditions, including site surveying), Division 31 (Earthwork), and Division 32 (Exterior Improvements, including headstone setting, alignment, backfilling, and turf renovation). The form requires Site Manager signature and Supervisors' initials with corresponding dates, includes space for weekly progress meeting notes, and provides an area for project photographs. This template does not specify products, services, response dates, or pricing terms.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

CONTRACTOR’S DAILY LOG OF CONSTRUCTION

INSPECTOR QUALITY

ASSURANCE REPORT (Q.A.R.)

DAILY LOG OF CONSTRUCTION

REPORT NUMBER: 01

Project Completion at 00 %

DATE:

CONTRACT NUMBER:

Project Title:

Location:

Contractor:

Name:

Address:

Phone:

Contractor’s Site Manager:

Name:

Address:

Phone:

Contracting Officer:

COR:

Midwest District Project Managers:

WEATHER CONDITIONS:

Temperature:

Max: ° Min: °

Precipitation:

(24hour total)

Visibility:

Miles:

Wind Speed:

mph

WEATHER RELATED DELAYS:

(Affected 50% or more of critical path?)

YES OR NO

OFFICIAL WEATHER DELAY DATES:

WORK FORCE-CONTRACTORS & SUB-CONTRACTORS:

TRADE: # TRADE: # TRADE: #

Project Manager Site Manager QC manager PM assistant Field Admin- Misc. Laborers Field Engineer Construction Mgr.

VISITORS: COMPANY:

EQUIPMENT ON SITE:

1.

2.

3.

4.

5.

6.

MATERIALS DELIVERED TO JOB SITE:

PROJECT COMMENTS:

DEFICIENCIES:

POTENTIAL CAUSES FOR DELAY:

TESTS AND OBSERVATION:

WORK ACCOMPLISHED / PREP. MEETINGS CONDUCTED TODAY:

DIVISION 1: GENERAL CONDITIONS

01 33 23 - Shop Drawings, Product Data, and Samples

01 45 29 - Testing Laboratory Services

DIVISION 2: EXISTING CONDITIONS

02 21 00 – Site Surveying

DIVISION 31: EARTHWORK

31 00 00 - Earthwork

DIVISION 32: EXTERIOR

IMPROVEMENTS

32 39 20 - Flat Marker Support System, Headstone Setting, Alignment, Backfilling, and Headstone Cleaning

32 92 24 – Turf Renovation

WEEKLY PROGRESS MEETINGS:

Site Manager’s Signature: Date Supervisors Initials: Date

PHOTOS: