IFB Attachment 4 - PCRA_534-24-706_Upgrade Data Center for EHRM_100625.pdf

PDF 554 KB Posted

Attached to
Y1DA--534-24-706 EHRM Data Center Upgrades Construction - Charleston
Solicitation number
36C77626B0027
Issued by

About this file

This is a Pre-Construction Risk Assessment (PCRA) Permit for a federal construction project. The permit documents an infrastructure upgrade project at a Department of Defense facility (Building 200) identified as Project 534-24-706 "Upgrade Data Center for EHRM." The project involves reconfiguring the main computer room to maximize space efficiencies, incorporating redundant power distribution, installing UPS and computer room cooling systems, replacing aged equipment, and adding fire protection, grounding, bonding, cable management, and fiber optic infrastructure. The project manager is Jason Richards (COR), with a contract phone number of (850) 428-3398. The project timeline extends from October 1, 2026 through December 31, 2027, with the permit expiring on December 31, 2027. The contractor will be selected through a competitive process and is listed as "TBD."

The permit identifies the project as both small-scale and large-scale in activity classification. Control measures include immediate replacement of ceiling tiles and access panels upon work completion, weekly site visits by a multi-disciplinary team documented on standardized checklists, and contractor-provided site-specific safety plans and hazard analyses. For large-scale activities, multiple control measures are checked as applicable, including dust control plans, pollution prevention plans, and hazard analysis documents. The PCRA meeting conducted on August 19, 2025 addressed hot work, ceiling permits, infection control, NEPA compliance, asbestos handling, interim life safety measures, activity hazard analysis, and drilling and noise control. An Infection Control Risk Assessment (ICRA) permit is required for this activity. The document was signed by Infection Prevention and Control, the Project Manager, Safety Officer, and Construction Safety Committee Chair on October 2, 2025.

View the file

Other files

File Type Posted
Special Notice Issuance of Bid Abstract 36C77626B0027.pdf PDF
36C77626B0027 Bid Abstract 9-14-2026.pdf PDF
36C77626B0027 Amendment 0005.pdf PDF
Spec 28 05 28.33 - Conduits and Backboxes for Electronic Safety and Security.pdf PDF
Tech Questions Tracker - EHRM Charleston Final.pdf PDF
ACM Survey_Data Center_AEWLA23075 VAMC Charleston SC EHRM Upgrades Pre-Construction ACM Survey-12-25.pdf PDF
Fire Calculations and Fire Water Flow Testing Documentations.pdf PDF
Specification 02 08 13.19 - Asbestos Floor Tile and Mastic Abatement.pdf PDF
36C77626B0027 Amendment 0004.pdf PDF
Specification 07 51 00 - Built-Up Bituminous Roofing.pdf PDF
36C77626B0027 Amendment 0003.pdf PDF
Site Visit Sign In Sheet Charleston EHRM.pdf PDF
36C77626B0027 Amendment 0002.pdf PDF
36C77626B0027 Amendment 0001.pdf PDF
Updated IFB 36C77626B0027.pdf PDF
IFB Attachment 5 - NEPA_PCRA_534-24-706_Signed.pdf PDF
IFB Attachment 9 - DBA Rates - Charleston - 5-18-26.pdf PDF
IFB 36C77626B0027.pdf PDF
IFB Attachment 7 - Site Visit - Charleston.pdf PDF
IFB Attachment 1 - FINAL SPECS_534-24-706.pdf PDF
IFB Attachment 2 - ORIGINAL DWG_534-24-706.pdf PDF
IFB Attachment 3 - ICRA_534-24-706_Upgrade Data Center for EHRM.pdf PDF
IFB Attachment 6 - VAMC Charleston SC EHRM Upgrades ACM Survey-12-25.pdf PDF
IFB Attachment 8 - Limitations on Subcontracting.docx DOCX document
IFB Attachment 10 - Brand Name Justification - Charleston EHRM Data Center.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .