IFB Attachment 3 - ICRA_534-24-706_Upgrade Data Center for EHRM.pdf

PDF 265 KB Posted

Attached to
Y1DA--534-24-706 EHRM Data Center Upgrades Construction - Charleston
Solicitation number
36C77626B0027
Issued by

About this file

This is an Infection Prevention and Control Construction/Renovation/Maintenance Permit for a data center upgrade project. The permit is issued for the B200 Upgrade Data Center for EHRM located at an unspecified facility, with a unique permit number of 534-24-706. The project is managed by Jason Richards (contact: 850-428-3398) with a start date of October 1, 2026, and completion date of December 31, 2026. The permit is classified as Activity Category C with a patient risk designation of HIGHEST, requiring Level IV Infection Prevention and Control Precautions.

The Level IV requirements mandate hard barriers unless temporary to install final barriers, containment with an anteroom for equipment staging and worker decontamination, and removal or cleaning of worker clothing and PPE before leaving the work area. Workers must wear shoe covers that are removed prior to exiting the anteroom to occupied spaces. The permit additionally incorporates all control measures from Levels I, II, and III, including dust control mechanisms, HVAC system modifications, negative pressurization maintenance at .01 inches water gauge with continuous 24/7 HEPA exhaust systems directed outdoors, differential pressure monitoring devices, hand-cleaning equipment availability, NFPA 241-compliant critical barriers extending to ceiling or deck, sealed penetrations with approved firestop materials, and daily cleaning protocols. The permit was signed by Infection Preventionist Carla Dyke-Forbes on October 10, 2025.

View the file

Other files

File Type Posted
Special Notice Issuance of Bid Abstract 36C77626B0027.pdf PDF
36C77626B0027 Bid Abstract 9-14-2026.pdf PDF
36C77626B0027 Amendment 0005.pdf PDF
Specification 02 08 13.19 - Asbestos Floor Tile and Mastic Abatement.pdf PDF
Tech Questions Tracker - EHRM Charleston Final.pdf PDF
ACM Survey_Data Center_AEWLA23075 VAMC Charleston SC EHRM Upgrades Pre-Construction ACM Survey-12-25.pdf PDF
Fire Calculations and Fire Water Flow Testing Documentations.pdf PDF
Spec 28 05 28.33 - Conduits and Backboxes for Electronic Safety and Security.pdf PDF
36C77626B0027 Amendment 0004.pdf PDF
Specification 07 51 00 - Built-Up Bituminous Roofing.pdf PDF
36C77626B0027 Amendment 0003.pdf PDF
36C77626B0027 Amendment 0002.pdf PDF
Site Visit Sign In Sheet Charleston EHRM.pdf PDF
Updated IFB 36C77626B0027.pdf PDF
36C77626B0027 Amendment 0001.pdf PDF
IFB Attachment 1 - FINAL SPECS_534-24-706.pdf PDF
IFB 36C77626B0027.pdf PDF
IFB Attachment 7 - Site Visit - Charleston.pdf PDF
IFB Attachment 4 - PCRA_534-24-706_Upgrade Data Center for EHRM_100625.pdf PDF
IFB Attachment 5 - NEPA_PCRA_534-24-706_Signed.pdf PDF
IFB Attachment 9 - DBA Rates - Charleston - 5-18-26.pdf PDF
IFB Attachment 2 - ORIGINAL DWG_534-24-706.pdf PDF
IFB Attachment 6 - VAMC Charleston SC EHRM Upgrades ACM Survey-12-25.pdf PDF
IFB Attachment 8 - Limitations on Subcontracting.docx DOCX document
IFB Attachment 10 - Brand Name Justification - Charleston EHRM Data Center.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Infection Prevention and Control Construction/Renovation/Maintenance Permit

This page must be posted at the entrance to the project area for Level III and Level IV activities.

Unique permit number: 534-24-706

Location of construction/renovation/maintenance

B200 Upgrade Data Center for EHRM

Project manager Jason Richards Project start date 10/1/2026

Contact phone number 850-428-3398 Completion date 12/31/2026

Contractor Permit expiration date 12/31/2026

Activity Category (A, B, C, or D)

C Overall Patient Risk Category (Low, Medium, High, or Highest)

HIGHEST

Level of Infection Prevention and Control Precautions (I, II, III, or IV)

IV

Level of Precautions

Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)

Level I

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

Level II

All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system

5. Seal doors, to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

Level III

All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands.

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop i f applicable for barrier type).

5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outline in Appendix A of the VHA ICRA template. These control measures must be maintained continuously 24/7 for the duration of the project. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.

Check box to indicate exhaust method: Exterior ☐ Alternative Interior Method ☐

6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Level IV

All control measures in Levels I, II and III and the following:

1. Barriers must be hard barriers unless temporary to install final barrier.

2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

Additional requirements:

Project Manager signature Date

Infection Preventionist signature Date CARLA DYKE-FORBES Digitally signed by CARLA DYKE-FORBES Date: 2025.10.10 09:33:27 -04'00'