1508-M2R3.pdf

PDF 2 MB Posted

Attached to
ID07180031-Cannon/Holloman AFB Fence to Fence
Solicitation number
ID07180031
Issued by

About this file

1508-M2R3

View the file

Other files

File Type Posted
TierII_MAFR_Report_1Jan-31Dec2017_Signed.pdf PDF
HAFB_RCRA_Permit_NM6572124422-2.pdf PDF
TierII_CAFB_Report_1Jan-31Dec2017_Signed.pdf PDF
HAFB_Hazardous_Waste_Management_Plan_2018.pdf PDF
CAFB_ISWMP_QRP_dtd_31_May_17.pdf PDF
P105R3_17_Mar_2017.pdf PDF
2014-10-01_Final_GW_Monitoring_Field_Sampling_Plan.pdf PDF
MonitoringWellGuidelinesFINAL-March2011[1].pdf PDF
Certified_Form_R_(Lead_CAFB_Range)2017.pdf PDF
DP-873_Permit_Application_with_Attachments_1_Jul_13.pdf PDF
Final_Standardized_ICRMP_Appendix_-_Data_Tables.xlsx XLSX spreadsheet
Final_Standardized_ICRMP_Template.docx DOCX document
Final_Holloman_AFB_ISWM_Plan_with_QRP_BP_Appendix_PDF_Draft_Apr2018.pdf PDF
NPDES_and_SPCC_Requirements_for_CAFB_HAFB.docx DOCX document
HAFB_1-5-2015_Approval_Closure_Haz_Waste_CSU.pdf PDF
RY17_Cannon_RCRA_Info_Biennial.pdf PDF
ID07180031-RFQ_NOTICE_-READ_ME_FIRST_-revised_11.13.18.pdf PDF
ID07180031-Appendix_D_Past_Performance-revised_11.13.18.docx DOCX document
ID07180031-Appendix_B_Instruction_to_Offerors-revised_11.13.18.pdf PDF
Cert_Form_R_(Lead_CAFB)2017.pdf PDF
Certified_Form_R_(Lead_MAFR)2017.pdf PDF
CAFB_NSR_1517M5R1_13Jun14.pdf PDF
AMOP_April_2015.pdf PDF
Holloman_AFB_2017_Hazardous_Waste_Biennial_Report_Background_Documentation_033018.pdf PDF
Final_Holloman_AFB_CMA_PDF_Full_Draft_Apr2018.pdf PDF
1997-02-03-HAFB-RCRA-Permit-for-Open-Detonation-Treatment-Unit.pdf PDF
Asbestos_Management_and_Operations_Plan.pdf PDF
Admin_Letter_(1508M2R5).pdf PDF
ID07180031-Revised_PWS_Cannon_Holloman_8a_F2F_11.13.18.pdf PDF
HWMP_Template_-_CONUS_Final_20180117.docx DOCX document
ID07180031-Government_Responses_to_Q&A_dated_13_Nov_2018.pdf PDF
Final_Standardized_ISWMP_Template.docx DOCX document
27_SOW_Hazardous_Waste_Management_Plan_-_May-17.pdf PDF
Final_Standardized_QRP_BP_Template.docx DOCX document
ID07180031-Appendix_E_Pricing_Spreadsheet_dated_13_Nov_2018.xlsx XLSX spreadsheet
Holloman_ICRMP_3_May_17.pdf PDF
Cannon_ICRMP_August_24_2017_Offical_Final.pdf PDF
ID07180031-Appendix_A_Evaluation_Criteria-revised_11.13.18.pdf PDF
CAFB_Final_Perm_as_modified_2-2006.pdf PDF
Final_Standardized_ISWMP_Data_Tables.xlsx XLSX spreadsheet
RCRA_Info_Holloman_Biennial.pdf PDF
ID07180031-Appendix_C_Past_Experience_Information_Sheet-revised_11.13.18.docx DOCX document
Final_Standardized_INRMP_Template.docx DOCX document
Final_Permit_(P119R1M3).pdf PDF
HAFB_Permit_1508C-M2R4_3Apr14.pdf PDF
Cannon_AFB_2017_Hazardous_Waste_Biennial_Report_Background_Documentation_033018.pdf PDF
2017FormRHolloman_LEAD_small_arms_range_TRI-DDS.PDF PDF
Certified_Form_R_(Lead_CAFB_Range)2017.pdf PDF
2017FormRHolloman_NAPHTHALENE_aircraft_hush_house_related_air_emissions.pdf PDF
ID07180031_Appendix_C_Past_Experience_Information_Sheet_dated_29_Oct_2018.docx DOCX document
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Air Force - Holloman AFB Holloman Air Force Base, NOI No. 1508-M2R2 Page 2 of 2 June 24, 2013

Unit ID * Make Model Serial No. 20.2.72.202.B.3 Notification Description submitted on 10 Jun 2013 HP 19349 ONAN QSB7-G3 NR3 73126531 Replacement emergency generator at building 302 GCS #1, 125 kilowatts 250 19350 ONAN QSB7-G3 NR3 73125859 Replacement emergency generator at building 302 GCS #2, 125 kilowatts 250 19351 ONAN QSB7-G3 NR3 73125877 Replacement emergency generator at building 302 GCS #3, 125 kilowatts 250 19347 ONAN QSB5-G3 NR3 73267122 Replacement emergency generator at building 1093, 35 kilowatts 145 19348 ONAN QSL9-G2 NR3 73274391 Replacement emergency generator at building 871, 200 kilowatts 364 19343 CUMMINS QSB7-G5 NR3 73329352 Replacement emergency generator at building 864, 125 kilowatts 250 19353 ONAN QSB5-G3 NR3 73327623 Replacement emergency generator at building 826, 60 kilowatts 145 19357 CUMMINS D1703 CE1421 Replacement emergency generator at building 689, 6.7 kilowatts 27.1 19355 CUMMINS D1703 CE1264 Replacement emergency generator at building 685, 6.7 kilowatts 27.1 19356 CUMMINS D1703 CE1323 Replacement emergency generator at building 688, 6.7 kilowatts 27.1 19354 CUMMINS D1703 CE1482 Replacement emergency generator at building 684, 6.7 kilowatts 27.1 19600

WISCONSIN V-465 D

6208480

Replacement emergency barrier rewind engines located at the end of each runway, twelve spark ignition engines, 65 horsepower each

19601 6188029 65 19602 6196608 65 19603 00060117 65

19604 CEMLB06 65

19605 5791755 65 19606 5989251 65 19607 6196570 65 19608 6178318 65 19609 6167753 65 19610 6138719 65 19611 6196881 65

19352 KOHLER 404JHF285 PE4045L0

89467 New emergency generator at building 13662, 100 kilowatts 178

19358 ONAN D1703 8W1033 New emergency generator at building 310, 6.7 kilowatts 27.1 19359 ONAN D1703 8W0900 New emergency generator at building 1086, 6.7 kilowatts 27.1 19360 ONAN D1703 8G1143 New emergency generator at building 878, 15 kilowatts 27.1 19361 ONAN D1703 8L1117 New emergency generator at building 1081, 15 kilowatts 27.1

* Emission Unit ID from Title V Permit Significant Modification Application for Permit No. P105-R2

BILL RICHARDSON

Governor

DlA."'[ DEl'I'ISH Lieutenant Governor

New Mexico

ENVIRONMENTDEPARTMENT

Air Quality Bureau 1301 Siler Road, Building B Santa Fe, NM 87507-3113

Phone (505) 476-4300

Fax (505) 476-4375 www.nmenv.s/a/e.nm.us

RON CURRY

S<aewy

JON GOLDSTElN DepUty S=etary

CERTIFIED MAIL NO. 7004 0750 0001 33102070

RETURN RECEIPT REQUESTED

Permittee:

RECTI NOV 25 2008

Holloman Air Force Base 49 CES/CEV, 550 Tahosa A"e, Holloman AFB, NM 88330-8458

Company Official:

Brent Hunt Air Quality Program Manager

1)J, a, LU~~ MaryUhl Bureau Chief Air Quality Bureau

NSR Air Quality Permit No. 1508-M2 Holloman AFB - Jet Engine Test Facility TEMPO No. 942 - PRN 20080002 AIRS No. 35-035-0013

Agency Contact: Sam Speaker

NOV 19 1008

Date of Issuance

Air Quality Permit No. 1508-M2 is issued by the Air Quality Bureau of the New Mexico Environment Department (Department) to Holloman Air Force Base (permittee) pur.;uant to the Air Quality Control Act (Act) and regulations adopted pursuant to the Act including Title 20, Cbapter2, Part 72 ofthe New Mexico Administrative Code (NMAC), (20.2.72 NMAC), Construction Permits and is enforceable pursuant to the Act and the air quality control regulations applicable to this source.

1bis permit authorizes the modification and operation ofthe Jet Engine Test Facility. The function ofthe Facility is to test and evaluate air craftjet engines at avariety ofloads. This Facility is located in Township 17 south, Range 8 east, Section 14, on HAFB, Otero County, New Mexico.

NSR Permit No. 1508-M2 Page 2 of20

This modification consists ofchanging the hourly emission rate based on historical records, changing the annual emission rate based on historical records plus asafety factor, and allowing the retirement of one air craft and allowing a n=w aircraft to be tested.

This permit supersedes all portions ofAir Quality Permit No. 1508-Ml, issued March 12, 1999 and its associated revisions, except the portion requiring compliance tests. Compliance test conditions from previous permits are still in effect, in addition to compliance test requirements contained in this permit.

The Department bas reviewed the permit application for the proposed modification and has determined that the provisions ofthe Act and ambient air quality standards will be met. Conditions have been imposed in this permit to assure continued compliance. 20.2.72.210.D. NMAC, states that any term or condition imposed by the Department on a permit is enforceable to the same extent as a regulation of the Environmental Improvement Board.

------Pursuant to 20.2.75.11 NMAC, the Department will assess an annual fee for this Facility. This ) regulation set the fee amount at $1,500 through 2004 and requires it to be adjusted annually for the Consumer Price Index on January 1. The h cUlT.eJ:!! fee amount is available by contacting the pepartment or can be found on the Department's website. The AQB wiJl invoice the Permitt~:f,?r .

the annual fee amount at the "oeginning of each calendar year. This fee does not apply to sources which are assessed an annual fee in accordance with 20.2.71 NMAC. For sources that satisfY the definition of "small business" in 20.2.75.7.F NMAC, this amiual fee will be divided hy two.

All fees shall be remitted in the form of a corporate check, certified check, or money order made payable to the «NM Environment Department, AQB" mailed to the address shown aD the invoice and shall be accompanied by the remittance slip attached to the invoice.

TOTAL EMISSIONS

The total potential emissions from this Facility, excluding exempted activities, are shown in the following table. The emissions limitations for individual units are shown in Specific Condition 2.

Template Rev 8-25-08

NSR Permit No. 1508-M2 Page 3 of20

Total Potential Criteria Pollutant Emissions from Entire Facility (for information only, not an enforceable condition):

Pollutant Emissions (tons per year) Nitrogen Oxides (NOx) 32

Carbon Monoxide (CO) 75

Volatile Organic Compounds (YOC) 9

Sulfur Dioxide (S02) 17

Particulate Matter - total suspended (TSP) 4

Particulate Matter less than 10 microns (PM IO) 4

Particulate Matter less than 10 microns (pM2.5) 4

Total PotentialllAPS that exceed 0.5 ton per year (for information only, not an enforceable condition):

Pollutant

Acetaldehyde

Benzene

Carbon Tetrachloride.. ; .' .__ ~ ._,- -" Methylene Cbloride

Formaldehyde

Toluene Xylenes

Total HAPs - Facility Wide (All Permits)

Emissions (tons per year)

2.5

3.8

<24.9

SE:CTION I: SPE:CIFIC CONDITIONS

Pursuant to 20.2.72 NNIAC. and the specific regulatory citations in parenthesis, the Facility is subject to the following Specific Conllitions.

1. Construction / Modification I Revision and Operation

(20.2.72 NMAC)

a. All of the process equipment authorized for this Facility is listed in Table l.a. shown below (eririssioll units that were identified as exemptions, and equipment not regulated pursuant to the Act are not included).

Table La:Re~atedEquipment List I Unit I Qty

Template Rev S~25-0S

Model

NSR Pennit No. 1508-M2 Page 4 of20

No.

20001 1 T-IO Hush House 20003 2 AlF32S-18 Sound SUDDressors 20006 I T-IO Hush House 20007 2 T-4 Test Cells 20009 I T-IO Hush House

b. In accordance with 20.2.72.202 NMAC, Attachment A contains a list ofExempted Equipment and is included for information only as an aid during Facility inspections.

AIl exempted equipment is so designated in accordance with 20.2.72.202 NMAC.

c. The Jet Engine Test Facility is authorized to operate at any time of day or night on any day of the year. The actual hours of operation are limited by the 12-month rolling total emission rate in Specific Condition 2.

d. This Facility is subject to all applicable requirements including, but not limited to, the following regulations listed in Table I.b:

RTable l.b: Applicable e uirements Citation Title

202.3NMAC A.riJ.bient Air Qualiry Standards

202)NMAc Excess Emissions

202.61 NMAC Smoke and Visible Emissions

202.70NMAC Operating Permits

20.2.71 NMAC Operating Permit Fees

20.2.72 NMAC Construction Permits

20.2.73 NMAC NOI & Emissions Inventory Requirements

20.2.75 NMAC Construction Penmt Fees

Note The facility as a whole and other portions ofthe AFB may be subiect to additional reauirements

e. The Facility shall be constructed and operated in accordance with all representations in the permit application dated July 9, 2008 and received July 31, 2008, unless modified by conditions of this permit.

f. This facility is being permitted as a "Jet Engine Testing Facility" and does not specifically restrict the types aircraft/jet engine being tested as long as the facility can demonstrate compliance within the structure of this permit

g. The Department. relied upon emission factors that were published by the Air Force Institute for Environment, Safety, and Occupational Health Risk Analysis (!ERA) (or an equivalent organization) and in the case of the Panavia Tornado aircraft, the emission factors were obtained from the German Air Force Support

Template Rev 8-25.Q8

NSR Penni! No. 1508-M2 Page 5 of20

Command (or an equivalent organization). The emission factors may be updated without undergoing a permit revision as long as the source ofthe emission factors remains as stated above and the facility continues to meet the emission limit of this pennit.

Alternatively, the permittee may change the source of their emission factors by submitting a "Technical Review of an Existing Penni!" (20.2.75.6.G) to the Department £)}" approval. The new emission factors shall not be used by the permittee until the Department provides written approval. This review is subject to fees in accord1Ilce with 20.2.75.

2. Emission Limits (20.2.72.210 NMAC, paragraphs A and B.I)

a. The maximum allowable emission limits for this Facility are listed in Table 2.1 and were relied upon by the Department to determine compliance with applicable regulations and ambient air quality standards.

Table 2 I "Allowable emissions..

,. ,. TSP, PMIO, &.

tJnit NOx co VOC S02 PM2.5 rEach)

No. Doh tnv DDh tnv DDh tnv DDh tnv Doh tnv 20001 20003 20006 462.4 31:9 684.4 74.7 98.6 8.7 198.6 16.2 39.8 3.4 20007 20009

b. The emissions from the Jet Engine Test Facility shall be calculated using the method .

described in Specific Conditions 4. These calculated emissions shall be used to determine compliance with the Total Allowed Emissions of Specific Condition 2.

c. The total HAP from the entire Air Force Base shall not exceed 9.9 tons per year of any single HAP or24.9 to per year ofall total HAPs combined as defined.in the Title V Permit PI05RI Condition 3.5.1. The Department relied upon this infonnation to make permitting decisions.

d. The Fuel Sulfur Content shall not exceed 0.2 weight percent.

3. Monitoring

(20.2.72.210.C NMAC)

a. For each jet engine that is operated during a test, the permittee shall monitor:

1. the date of the test, .

NSR Pennit No. 1508-Ml Page 6 of20

11. the full name ofthe person making the record, lll. which aircraft is being tested (F-22, T-38, F1l7, Tornado, or ... ), IV. which facility is doing the testing (20001, 20003, 20006, 20007,or 20009),

v. the mode (idle, intermediate, military, or afterburner), and

VI. the corresponding duration (in minutes) for each mode.

A test is a series of one or more runs of ajet engine during an evaluation effort.

4. Recordkeeping

(20.2.72.21O.E NMAC)

a. For eacbjet engine that is operated during a test, the permittee shall keep records of:

1. the date of the test,

11. the full name of the person making the record,

111. which aircraft is being tested (F-22, T-38, Fl17, Tornado, or ... ), IV. which facility is doing the testing (20001, 20003, 20006, 20007,or 20009),

v. the mode (idle,.intermedi8;W, milj~, or aft¢rbJ.m;ler), and

VI. the corresponding duration (in minutes) for each mode.

. . _. b. - Within 30.;,days of the end of each calendar month, the permittee shall calculate, for the previous calendar month,:

1. for each jet engine test facility, for each hour an engine(s) is operated at that specific: site - the total hourly emission rate for NOx, CO, VOC, and TSPIPMIOIPMl.5.

11. the total monthly emission rate for NOx, CO, VOC, and TSPIPMI OIPM2.5 from all of the jet engine test facilities combined.

111. the monthly l2-montb rolling emission rate for NOx, CO, VOC, and TSPIPMI 01PMl.5 from all of the jet engine test facilities combined.

c. The emissions (E) for a particular engine aod NOx, CO, YOC, aod TSPIPMIOIPM2.5 shall be calculated as:

E = Sum (Time Mi X EF M;)

Where E = the emission rate for a particular engine and pollutant Time Mi = The time an engine ran in Mode i

EF Mi = The emission factor for Mode i

NSR Pennit No. 1508-M2 Page 7 of20

Mode i = Idle. Intermediate, Military, or Afterburner Mode

d. The total emissions from the all ofthe jet engine test facilities shall be calculated by summing all of the emissions frOIn engines for each pollutant.

e. Compliance with the S02 emissions limit in Specific Condition 2 shall be based on the average monthly sulfur content ofthe fuel delivered to Holloman. Alternatively, the permittee could show the sulfur content of the fuel through contractual agreements at a frequency that is supported by the contract.

f. The permittee shall keep records ofeach fuel delivery showing the sulfur content of the fuel. Altematively, the permittee shall keep a copy of the contract with the fuel supplier showing the maximmn sulfur content ofthe fuel will meet the requirements of this permit.

g. As long as this facility remains a PSD major source, all records pertaining to actual emissions or that could be used to calculate actual emissions shall be retained for 10 years frOJ!l tp.~ date of generation.

5. Reporting ....: . - , (20.:1.72 NMA.CA"ctipDlilJOand 212) a The permittee shall generate a report each calendar month that shows:

·1." ··-the maximumh€lllrly-emission-rate-for each-site and·for each pollutant listed in Table 2.1, exceptfor SO,.

11. the monthly 12-month rolling total for each pollutant from all of the jet engine test facilities combined.

HI. The sulfur content of the fuel.

This report shaU be made available to the Department upon request.

b. Prior to updating the emission factors, the permittee shall submit a report to the Department. The report shall include:

1. The new emission factors

ll. The source of the emission factors (e.g. lERA or the German Air Force Support Command)

w. A projection of the actual emission based. the emission factors and the run time from the highest emitting l2-month period over the past ten years or less if ten years ofdata does not exist.

Template Rev 8·25·08

NSR Permit No. 1508-M2 Page 8 of20

IV. A statement from the facility that they understand that they must continue to meet all of the requirements of this permit.

A copy of the report that was submitted to the Departmeot shall be kept on file.

c. Prior to testing an aircraft/jet engine at this facility for the first time, the permittee shall submit a report to the Department. The report shall include:

I. A description of the new aircraft/jet engine (eg T-38 - engine type J85-GE 5H) u.

w.

IV.

V.

The source of the emission factors (e.g. IERA or the German Air Force Support Command)

A projection of the hourly and annual emission based the emission factors and the projected run time.

A statement from the facility that says the new aircraft/jet engine is functionally equivalent to those originally allowed under this permit and the actual emissions are calculated in the same way.

A statement from the facility that says they understand that they must continue to meet all afthe requirements of this permit.

A copy ofthe report that was submitted to the Department sball be kept on file. This report is not required for those aircraftljet engines that were included in the 1508-M2

..._ -"Pplication.. _ _ _ . . __ _ __

6. Compliance Testing (20.2.72 NMAC Sections 210.C and 213)

a. No initial compliance testing is required as a result ifPermit No. 1508-M2.

Enclosure: Industry/Consl~tant Feedback Questionnaire with envelope

Template Rev 8·25-08

NSR Pennit No. 1508-M2

SECTION II: GENERAL CONDmONS

I. Reporting (20.2.72 NMAC Sections 210 and 212)

Page 90f20

The Permittee shall notify the Department in writing of, or provide the Department with:

a the anticipated date of initial startup of each new or modified source not less than thirty (30) days prior to the date;

b. the equipment serial number and the actual date of initial startup of each new or modified source within fifteen (15) days aftet the startup date;

c. the date when each new or modified emission source reaches the maximum production rate at which it will operate within fifteen (15) days after that date;

d. any change ofoperators within fifteen (15) days of such change;

e. any necessary update or correction no more than sixty (60) days after the operator knows or should have known ofthe condition necessitating the update or correction of-the-pennit.

2. Records Retention

Except as provided in the Specific Conditions, records shall be maintained on-site for a minimum of two (2) years from the time of recording and shall be made available to Department personnel upon request. Sources subject to 20.2.70 NMAC "Operating Pennits" shall maintain records on-site for a minimum of five (5) years from the time ofrecording.

3. PostingIRetention of the Permit

The Permittee shall post a copy of this permit in plain view at the Facility at all times. [fit is not possible to post a copy of the permit because the Facility is unmanned, a copy of this permit shall be kept at the nearest business office and the Permittee shall post a notice in a conspicuous place at the Facility. The notice must state the Facility name and ownership, the air quality permit number, address and phone number of the office where the permit is located, and the Air Quality Bureau address and phone number in Santa Fe_ A copy of this permit shall be made available to Department personnel for inspection upon request.

NSR Permit No. 1508-M2

4. Right to Access Property and Review Records (NMSA 1978, Section 74-2-13)

Page 10 of20

The Department shall be given the right to enter the Facility at all reasonable times to verify the terms and conditions ofthis permit. The company. upon either a verbal or written request from an authorized representative of the Department, shall produce any records or information necessary to establish that the terms and conditions oftrus permit are being met.

5. Contents ofPerrnit Application

(20.2.72.21 O.A NMAC)

Pursuant to 20.2.72.210 A NMAC, the contents ofapermit application specifically identified by the Department sh:111 become the terms and conditions of the permit or permit revision.

Unless modified by conditions oftms pennit, the Permittee shall construct or modify and operate the Facility in accordance with all representations of the application and supplemental submittals that the Department relied upon to determine compliance with applicable regulations and ambient air quality standards. If the Department relied on air quality modeling to issue this pennit, any change in the parameters used for this modeling shall be submitted to the Department-for review. Upon the Department's request, the Permittee shall submit additional modeling for review by the Department Results, of that review may require a per:mit modification.

6. Asbestos Demolition

Before any asbestos demolition or renovation work, the Permittee shall determine whether 40 CFR 61 Subpart M, National Emissions Standards for Asbestos applies. If required, the Permittee shall notify the Department using forms furnished by the Department.

7. Revisions and Modifications (20.2.72 NMAC Sections 200.A.2 and E, and 21O.B.4)

a. Any future physical changes or changes in the method ofoperation may constitute a modification as defined by 20.2.72 NMAC, Construction Permits. Unless the source or activity is exempt under 20.2.72.202 NMAC, no modification shall begin prior to issuance of a permit.

b. Changes in plans, specifications, and other representations stated in the application documents shall not be made if they cause a change in the method of control of emissions or in the character of emissions, or will increase the discharge of emissions. Any such proposed changes shall be submitted as a revision or modification.

NSR Penni! No. l508-M2 Page II of20

c. Modifications or revisions to this permit shall be processed in accordance with

20.2.72 NMAC.

8. Notification to Subsequent Owners (20.2.72 NMAC Sections 7.P.l and 2l2.C)

a. The permit and conditions apply in the event ofany change in control or ownership of the Facility. No pennit modification is required in such case. However, in the event of any such change in control or ownership, the Permittee shall notify the succeeding owner ofthe permit and conditions and shall notify the Department ofthe change in ownership within fifteen (15) days of that change.

b. Any new owner or operator shall notify the Department, within thirty (30) days of assuming ownership, of the new owner's or operator's name and address.

9. Permit Cancellations

(20.2.72 NMAC)

8. Th~D~part;ment:shallauto~aticaUycancel any permit for any source which ceases ...oper~4Q}l"fo.r ~:v.e (S),ye~, pr.more, or permanently~_E.~_activation oJany source after the five{5) year period -shall require a new permit.

b. The Department may cancel a permit if the construction or modification is not commenced 'within two (2) years from the date of issuance or if, during the construction or modificatio~work is suspended for a total of one (1) year.

10. Emissions Limit Averaging Times and Energy Input Limits

Emissions lintits associated with the energy input ofa Unit, i.e.lblMMBtu, shall apply at all times unless stated othenvise in a Specific Condition ofthis permit. The averaging time for each emissions limit, including those based on energy input ofa Unit (i.e.lbl!vUvffitu) is one

(1) hour unless stated otherwise in a Specific Condition of this permit or in the applicable requirement that establishes the limit

11. Testing and Records for Engines and Turbines Equipped with Emissions Controls

For engines or turbines equipped with catalytic converters and/or air-fuel ratio (AFR) controllers, or similar device which performs the same function ofmaintaining appropriate all and fuel ratios, records shall be made and maintained ofthe following requirements. The Permittee shall retain these records for a period of at least two (2) years from the date of generation and the records shall be made available to Department personnel upon request.

NSR Permit No. l508-M2 Page 12 of20 c.

a. For each AFR controlling type device, demonstrate that the manufacturer's or supplier's recommended maintenance is performed, including replacement ofoxygen sensor as necessary for oxygen-based controllers. Verification ofproper operation of the controller shall be demonstrated at least quarterly by measuring and recording exhaust oxygen or NQo; concentrations with aproperly calibrated portable analyzer as specified in the most current version oftbe SOP for "Use afPoctable Analyzers in Performance Tests".

b. For any engine equipped with a non-selective catalytic converter, demonstrate the maintenance ofllie NOx and CO reduction efficiency across the catalyst bed. This test shall be performed within ninety (90) days following initial startup and on a quarterly basis thereafter, unless an alternative testing schedule is specified by the Department. Properly calibrated portable analyzers are acceptable for this demonstration. The test shall be conducted at ninety percent (90%) or greater offull load and sball include the exhaust volume flow rate (dsc!) and the NOx and CO emission rate (lbihr). (20.2.72 NMAC, Section 210.B(4)).

For any engine equipped with a selective catalytic converter, demonstrate the maintenance oillie CO reduction efficiency across the catalyst bed. This test shall be

. penoriqed witlJin ninety (90) days following initial startup and on a quarterliliasis .... ' ; ': .the~~afte.r, unkss an altemabve· testing schedule is specified by the Dep~e·nt ..

Properly calibrated portable analyzers are acceptable for this demonstration. The test shall be conducted at ninety percent (90%) or greater of full load and shall include .the exhaust volume flow.rate.(dscl) and the NOx and the CO emission rate (lbihr).

(20.2.72 NMAC, Section 210.B(4))

12. Operation ofEngines Equipped with Catalytic Converters

a. For engines equipped with catalytic converters, the engine shall not be operated without the catalytic converter, specifically including catalyst maintenance periods.

During periods ofcatalyst maintenance, the Permittee shall either (I) shut down the engine(s); or (2) replace the catalyst with a functionally equivalent spare to allow the engine to remain in operation.

b. Any engine equipped with a catalytic converter shall also have an AFR controlling device, or similar device that performs the same function of maintaining an appropriate air-fuel ratio. Engines equipped with oxidation catalysts are not required to operate with an AFR

13. Flares

a. Flares used as control devices to comply with any NSPS (40 CFR Part 60) or NESHAP (40 CFR Part 61) requirement shall be tested in accordance with the

NSR Permit No. 1508-M2 Page 13 of20 requirements contained in 40 CFR 60, Subpart A, General Provisions, paragraph 60.8 (performance tests) and 60.18 (general control device requirements). Flares used as control devices to comply with any MACT requirement (40 CFR Part 63) shall be tested in accordance with the requirements contained in 40 CFR 63, Subpart A, General Provisions, Section 63.7 (performance tests) and 63.11 (general control device requirements).

b. Any flares that are operated at this Facility are authorized to have emissions resulting only from the pilot flame, unless otherwise approved by Specific Conditions ofthis permit.

14. Compliance Testing Procedures

If this permit requires any compliance testing, the Pennittee shall notify the Department at least thirty (30) days before the test date and allow a representative of the Department to be present at the test. The Permittee shall submit a testing protocol to the Department at least thirty (30) days before the test date and shall observe the following testing procedures:

a. The test protocol and compliance test report shall C:OnfOIDl to the standard format spec~ed by the Department. The most current version bf.the format may be obtained from the Enforcement and Compliance -Section of tl1e-:Air Quality Bureau.

b. All compliance tests required by this permit, unless otherwise specified by Specific Conditions ofthis permit, shall be conducted in accordance with the requirements of CFR Title 40, Part 60, Subpart A, Geueral Provisious, and the following EPA Reference Methods as specified by CFR Title 40, Part 60, Appendix A:

1. Methods 1 through 4 for stack gas flov.rrate

11. Method 5 for TSP lll. Method 7E for NOX (test results shall be expressed as nitrogen dioxide (N02) using amolecular weight of46lb/lb-mol in all calculations (each ppm ofNOIN02 is equivaleut to 1.194 x 10-7Ib/SCF)

IV. Method 9 for opacity

v. Method 10 for CO

VI. Method 6C for S02 Vll. Method 29 for metals

VUl. Method 201 for filterable PM10 IX. Method 202 for condensable PMI 0

x. Method 320 for organic Hazardous Air Pollutants (HAPs)

Xl. Method 25A for VOC reduction efficiency.

Alternative test methodes) IIlay be used if the Department approves the change.

NSR Permit No. 1508-M2 Page 14 of20

Emission limit test results for each pollutant (except opacity) shall be reported in pounds per hour (unless otherwise specified) and tons per year. Opacity shall be reported in percent. Test result numerical values shall not be truncated or rounded, and shall be recorded and reported to the number ofsignificant figures corresponding to the full accuracy inherent in the testing instrument or Method test used to obtain the data.

a. Method 19 maybe used in lieu ofMethods 1-4 for stack gas flowrate upon approval of the Department. A justification for this proposal must be provided along with a contemporaneous fuel gas analysis (preferably on the day ofthe test) and a recent fuel flow meter calibration certificate (within the most recent quarter).

b. Unless othern~se indicated by Specific Conditions or regulatory requirements, the default time period for each test run shall be 60 minutes and each performance test shall consist ofthree separate runs using the applicable test method. For the purpose ofdetermining compliance with an applicable emission limit, the arithmetic mean of results of the three runs shall apply. In the event that a sample is accidentally lost or conditions occur in which one of the three runs must be discontinued because of forced shutdown,-failure-of an-irreplaceable portion of the sample train" extreme meteorological conditions. or., qtber,circ'IJIm;tances, beyond the owner or operator's control, compliance: ID.'!Y"uP.9n .We··Depwtrnerit -approval, be determined using.the arithmetic mean of the results of the !\vo other runs.

c. Testipg of.f;rp.j?sjoAS s~@ 1:?~£9Qgl.!~te~ with.!4_~. ~@~s.~o~ unit operating at 90 t<;)

100 percent of the maximum operating rate allowed by the permit. If it is not possible to test at that rate, the source may test at a lower operating rate, subject to the approval of the Department.

1. Testing performed at less than 90 percent of permitted capacity will limit emission unit operation to 110 percent of the tested capacity until a new test is conducted.

11. Ifconditions change such that unit operation above 110 percent oftested capacity is possible.

the source must submit a protocol to the Department within 30 days of such change to conduct anew emissions test.

d. Pursuant to 20.2.72.21 O.C NMAC, for combustion sources with stacks, the Permittee shall also provide a one-quarter (1/4) inch stainless steel sampling line adjacent to the sampling ports and extending down to within four (4) feet above ground level to provide access for future audits. The line shall extend into the stack a distance of 1/4 the stack diameter. but not less than one inch from the stack wall. The sampling line shall be maintained clear of blockage at all times. This line shall be in place at the time ofany required compliance tests. For any source for which compliance tests are not required or for previously existing sources this line shall be installed no later than one hundred and eighty (180) days from the date of this permit.

NSR Permit No. 1508-M2 Page 15 of20

e. As an alternative, the Permittee may provide a portable sampling line that is readily available which allows the Department to safely obtain representative stack gas samples at the time of compliance audits or site inspections.

f. A physical configuration of the Facility that conforms to the emissions testing requirements of 20.2.72.210.C NMAC and of 40 CFR 60.8(e), which is imposed under the authority of20.2.72.210.CA NMAC.

15. Compliance Test Submittals

Unless otherwise spec.ified by a Specific Condition of this permit, all compliance test reports that are required by Specific Condition 6 Compliance Testing shall be submitted to the Department as follow".

a. Initial compliance test reports shall be submitted to the Department's Program Manager, Compliance and Enforcement within thirty (30) days from the test completion date. Additionally, a copy of each initial compliance test report that is submitted ·to the Department shall be retained by the Permittee as long as the

-- ---Permittee"owm;'and operates the tested unit.

'. b. --P-erioiiic-eompJ:jance -test reports shall be retained atthe Facility, or if the Facility is .. "-_

- .... _.- ._ ..... 1iD.iiianned;artl1e neatestousiness office closest to the Facility, for DO less than two

(2) years from the date that the periodic compliance test was completed. Periodic compliance test reports shall be made available to Department personnel upon request.

16. General Monitoring/Compliance Testing Requirements These requirements do not supersede or relax requirements of federal regulations.

a. The follovving monitoring andlor testing requirements shall be used to determine compliance with applicable requirements and emission limits. Any sampling, whether by portable analyzer or EPA reference method, that measures an emission rate over the applicable averaging period greater than an emission limit in this permit constitutes noncompliance with this permit. The Department may require, at· its discretion, additional tests pursuant to EPA Reference Methods at any time, including when sampling by portable analyzer measures an emission rate greater than an emission limit in this permit; but such requirement shall not be construed as a determination that the sampling by portable analyzer does not establish noncompliance with this permit and shall not stay enforcement of such noncompliance based on the sampling by portable analyzer.

b. If the emission unit is shutdown at the time when periodic monitoring is due to be accomplished, the Permittee is not required to restart the unit for the sale purpose of

NSR Pennit No. 1508-M2 Page 16 of20 performing the monitoring. Using electronic or written mail, the Permittee shall notify the Department's Enforcement Section ofa delay in emission tests prior to the deadline for accomplishing the tests. Upon recommencing operation. the Permittee shall submit any pertinent pre-test notification requirements set forth in the current version nf the Deparlment's Standard Operating Procedures For Use Of Portable Analyzers in Performance Test, and shall accomplish the monitoring.

c. The requirement for monitoring during any monitoring period is based on the percentage of rime that the unit bas operated as follows:

1. If the emission unit has operated for more than 25% ofa monitoring period, then the Permittee shall conduct monitoring during that period.

u. If the emission unit has operated for 25% or less of a monitoring period then the monitoring is not required. After two successive periods without monitoring, the Permittee shall conduct monitoring during the next period regardless of the time operated during that period, except that for any monitoring period in which a unit has operated for less than 10% of the monitoring period, the period will not be considered as ODe of the two successive periods.

~{;!.'f--:'::" _~'_.:"".:. "1l1. A minimwn of one of each type ofmonitoring activity shall be conducted, during any five-year period for sources not subject to 20.2.70 NMAC, Operating Pennits.

d.. _4 .-.For all periodic. monitoring events, excepLwhen a federal or state regulation is more stringent, three test runs shall be conducted at 90% or greater of the full nonnalload as stated in this permit, or in the permit application if not in the permit, and at additional loads when requested by the Deparlment. If the 90% load cannot be achieved, the monitoring will be conducted at the maximum achievable load under prevailing operating conditions except when a federal or state regulation requires more restrictive test conditions. The load and the parameters used to calculate it shall be recorded to document operating conditions and shall be included with the monitoring report that is required to be furnished to the Department.

e. When requested by the Department, the Permittee shall provide schedules oftesting and monitoring activities. Compliance tests from previous NSR and Title V permits may be re-imposed if it is deemed necessary by the Department to determine whether the source is in compliance with applicable regulations or permit conditions.

f. Monitoring shaU become effective 120 days after the date of permit issuance if the monitoring is new or in addition to monitoring imposed by an existing applicable requirement. Any pre-existing monitoring requirements incorporated in this permit shall continue to be in force from the date of permit issuance.

NSR Pennit No. 1508-M2 Page 17 of20

g. Startup. Shutdown and Malfunction Conditions: For operations and equipment subject to an NSPS standard pursuant to 40 CFR 60, excess emissions, or operations under startup, shutdo~ or malfunction shall be addressed in accordance with the requirements of40CFR60.7(c) or 40CFR60.8(c), as appropriate. A Facility subject to a NESHAP standard pursuant to 40 CFR 63 shall comply with the requirement for a Startup, Shutdown and Malfunction Plan (SSM) under 40 CFR 63.6(e)(3). This condition is pursuant to 20.2.72.210 NMAC.

17. Definitions

a. Natural gas is defined as a naturally occurring fluid mixture of hydrocarbons that contains 20.0 grains or less cftata! sulfur per 100 standard cubic feet (SCF) and is either composed ofat least 70% methane by volume or bas a gross calorific value of between 950 and 1100 Btu per standard cubic foot.

b. "Daylight" is defined as the time period between sunrise and sunset, as defined by the Astronomical.'\pplications Department ofthe U.S. Naval Observatory. (Data for one day or a table of sunrise/sunset foe an entire year can be obtained at bttp://aa.usno.navy.miV. Alternatively, these times can be obtained from a Farmers Almanac or from http://www.almanac.com/risel)..

SUBMITTALS TO THE DEPARTMENT

Applications for permit revisions and modifications shall be submitted to:

Program Manager, Permits Section New Mexico Environment Department Air Quality Bureau 1301 Siler Road, Building B Santa Fe, New Mexico 87507-3113

Compliance test protocols, regularly scheduled reports, a copy of test results, and excess emission reports, shall be submitted to:

Program Manager, Compliance and Enforcement Section New Mexico Environment Department Air Quality Bureau 1301 Siler Road, Building B Santa Fe, New Mexico 87507-3113

NSR Permit No. l508-Ml

REVOCATION

Page 18 of20

The Department may revoke this permit if the applicant or Permittee has knowingly and willfully misrepresented a material fact in the application for the permit. Revocation will be made in writing.

and an administrative appeal may be taken 10 the Secretary ofthe Depar1menl within thirty (30) days.

Appeals will be bandIed in accordance with the Departmenfs Rules Governing Appeals From Compliance Orders.

APPEAL PROCEDURES

20.2.72.207.F. NMAC provides thaI any person who participated in a permitting action before the Department and who is adversely affected by such permitting action, may file apetition for hearing before the Environmental Improvement Board. The petition shall be made in writing to the Environmental Improvement Board \Vithin thirty (30) days from the date notice is given of the Department's action and shall specify the portions of the permitting action to which the petitioner objects. certify that acopyoftbe petition has been mailed or hand-delivered and attach a copy ofthe permitting action for which review is soug!lt. Y]1le.ss a timely_request for hearing is made. the decision of the Department shall be finaL The petition shall be copied simultaneously to the Department upon receipt ~{th~ appeaI~otic~. lithe petitioner is n~t the applicant or Permittee, the

. petitioner shall mail or hand-deliver a coPY pf the petiti~n to the applicant or Permittee. The Department shall certify the administrativerecord to ilie board. Petitions for ahearing shall be ,sent· to:

Environmental Improvement Board 1190 St. Francis Drive, Runnels Bldg.

P.O. Box 26110 Santa Fe, New Mexico 87502

Template Rev 8-25~8

Attachment A: Exempted Equipment List (20.2.72.202.x(x) NMAC)

Page 19 of20

Source Descriotion CaDacity Construct/operate boilers at building 15 with model #60WBHE100A-TP, 1508-M1-R9

2390,000 BtuIbr; SN 0106117574 and SN 0106117575 Anril28,2006 Operate 3 electric generators located at bldg 29, 80 kw, bldg 1263, 1508-M1-R8

100k-w and bIde 892 2 each 150 kw February 28 2006 Adding three replacement heaters and an oven. The three beaters consist of two 180,000 BtuIbr and one 840,000 BtuIbr units, which will be 1508-M1-R7 located at buildings 325, 897, and 342 respectively. The oven at 175,000 October 15,2004

BtuIbr will be located at buildine 856 This modification is seeking to replace attachment A ofAir Quality Permit 1508-M1-R6 No 1508·MI with a new Table that contains more up to date emission September 15, factors and reQuire the use of low sulfur diesel fuel. 2004

This revision consists of exempted forty-one (41) fuel burning equipment units. The fuel burning equipment is used solely for beating l508-M1-RS buildings for personal comfort or for producing hot water for personal

March 17, 2003 use, and uses gaseous fuel and has a design rate less than or equal to five (5) million Btu per hour.

Cannot find permit. It ap]JCfu-s t!JlIt!h~ pennit was missed numbered and 1508-MI-R4 1508-M1-R4 was numbered as 1508-M1-R3 (dated Januarv 25,20021 . -

Holloman is submitting this lechnical revision application to obtain approval for the replacement of a single walled 1,000 gal gasoline storage tank with a double walled 1,000 gal gasoline storage tank. The double 1508-MI-R3 walled tank will provide additional spill protection. This tank has been January 25, 2002 identified as emissions unit number 22014R. (possibly missed numbered· should it be 1508-MI-R4?1 This revision consists of the activity in the Arts and Crafts Center that bas a potential emission rate ofno more than one-half (112) tons per year of any pollutant for which a Nalional or New Mexico Air quality Standard has been set on one-half (1/2) ton per year of any VOC, according to 20

1508-MI-3-R3

NMAC 2.72.202 B.S. This revision also consists of repositioning or

March 16, 2001 relocating the Arts and Crafts Center within the plant site and does not increase air emissions or the ambient impacts of such emissions, according to 20 NMAC 2.72.202.B.4. (possibly missed numbered;

should it be l508-MI-R3?1

Allows the process of applying radar absorbing materials (RAM) coating May 10,2000 1508-M1-R2

This revision consists of the installation of three 500 MBtuIhr diesel heaters, one 240 gallon diesel storage tank, one 500 gallon diesel storage 1508-MI-R1 tank., replacing a 25 kW diesel generator with a 60 kW diesel generator April 26, 1999 and reolacin. a 40 kW diesel eenerator with a 27 kW oronane eenerator.

Template Rev 8·25·08

·,,"o;.,~ ; _ .. "'-

Page 20 0[20

File details come from the government source that posted it.