This document contains earthwork quantities reports and related solicitation information for a federal highway project. The reports provide cut and fill volume calculations for various construction elements of the DOT 21(1) SH-21 Wildlife Overpass at Cervidae Peak project, including a diversion roadway, wildlife overpass trail, tunnel, and maintenance driveway. The attached solicitation from the Federal Highway Administration Western Federal Lands Highway Division seeks bids for work on this project, as identified by solicitation number 69056721B000009. Interested offerors should review the solicitation documents for additional requirement details.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork Quantities Report for Diversion
Roadway for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
ID DOT 21(1)
SH-21 Wildlife Overpass at Cervidae Peak, MP 19.3
Quantities Report by Named Boundary
Report Created: Tuesday, September 7, 2021 Time: 1:59:11 PM
Named Boundary Group:
Diversion Roadway
Alignment Name: Diversion Roadway
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
10700.000 Plan 1
XS_TL_Centerline: 449.999
XS_TL_Edge of Pavt: 1110.452
XS_TL_Fill: 800.160
Exist Pavement: 521.305
XS_TC_Pavement Layer 1: 8008.440 1947.721
XS_TC_Fill: 3504.414
XS_TC_Pavement Layer 4: 8654.223 4113.449
Volumes_Cut: 699.930 271.776
Volumes_Fill: 10373.330 12934.128
Baseline: 744.988
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Volumes_Cut: 699.930 271.776
373.330 12934.128
Report for Wildlife
Overpass Trail
Report Created: Thursday, November 4, 2021 Time: 1:33:55 PM
Named Boundary Group:
Wildlife Overpass Trail
Alignment Name: Wildlife Overpass Trail
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
7725.000 Plan 1
AUX_02: 1954.711
XS_TL_Centerline 1: 3260.376
XS_TC_Surface 1 Symbology: 22280.604 7362.026
Volumes_Cut: 697.914 165.987
Volumes_Fill: 21582.690 359602.141
Baseline: 750.000
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Report Created: Wednesday, March 31, 2021 Time: 1:59:01 PM
Named Boundary
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
7+32.970 Tunnel Cut and Fill
PL_MSE Wall: 479.460
XS_TL_Centerline 1: 248.728
XS_TL_Centerline: 248.728
XS_TL_Edge of Pavt 1: 248.728
XS_TL_Edge of Pavt: 248.728
XS_TC_Wall Foundation: 15923.800 32271.897
XS_TC_MSE Wall Front: 1738.412 9047.932
XS_TC_Fill Wall Top: 15143.436 140890.717
Volumes_Cut: 4480.045 16304.691
Volumes_Fill: 7580.448 131575.562
Baseline: 283.025
Exist Pavement: 566.080
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 1 of 1Volumes Report
3/31/2021file:///C:/Users/ythao.truong/AppData/Local/Temp/RPT3armqdoq.html
4480.045 16304.691
140890.717
Report for SH-21
Report for Maintenance
Driveway