QA_03-07-2022.pdf

PDF 105 KB Posted

Attached to
ID DOT 21(1) SH-21 Wildlife Overpass at Cervidae Peak, MP 19. 3
Solicitation number
69056721B000009
Issued by

About this file

This document contains 12 questions and answers related to solicitation number 69056721B000009 for a wildlife overpass project. Key details include specifications for fencing materials being addressed in amendment A003 due to availability issues with the 8-foot woven mesh and T-posts specified. Questions covered project details such as reinforcement requirements, connection of precast elements, bid submission protocols, and clarification of plan holders lists. The solicitation involves construction of a wildlife overpass on SH-21 at milepost 19.3 by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab_ID DOT 21(1).pdf PDF
BidSum-ID DOT 21(1) SH-21 Wildflife Overpass_FINAL_03_22_2022.pdf PDF
QA2_03-17-2022.pdf PDF
QA_03-17-2022.pdf PDF
Amendment A007.pdf PDF
QA_03-16-2022.pdf PDF
Amendment A006.pdf PDF
QA_03-09-2022.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
QA_03-08-2022.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
Page A-1.pdf PDF
QA_03-03-2022.pdf PDF
QA_03-02-2022.pdf PDF
QA_03-01-2022.pdf PDF
Amendment A001.pdf PDF
QA_02-15-2022.pdf PDF
id-02101_Plans.pdf PDF
id-02101_Vertical Report.pdf PDF
id-02101_SH-21 Gradebook.pdf PDF
id-02101_Earthwork.pdf PDF
id-02101_Horizontal Report.pdf PDF
IFB 69056721B000009 .pdf PDF
GM 51-20 - SH-21 Wildlife Overpass - Final Foundations Recommendations (Rev 01B).pdf PDF
id-02101_XS.pdf PDF
Additiona physical data.zip ZIP file
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID DOT 21(1)

SH‐21 Wildflife Overpass at Cervidae Peak, MP 19.3

# General Technical Question Answer Date

1 X

In reference to the cameras.

Document: Project Description update date Jan

17, 2022, lists 646 Roadside Development –

Cameras 10 EA.

Solicitation No. 69056721B000009: Bid

Schedule (page 28 of 295) only lists A1300

64603‐0000 Fixture (Camera Pedestal).

No cameras are listed in the Bid Schedule or shown within the drawings or specifications.

Nothing is listed for the number of cameras required or brand and specs. Please provide additional information about the brand specifications and quantities of cameras required in the job.

The Project Description file on sam.gov, dated Jan 17, 2022, was part of the Pre‐

Solicitation Documents for this project to give bidders advanced notice of this project that we solicited. Please submit bids according to the Solicitation Documents instead of the Pre‐Solicitation Documents.

2/15/2022

2 X

We're trying to find a plan holders list for this project because we have been requested by a contractor to prepare a bid for the project and we were hoping to supply our bid to others bidding on the project. Any help/direction you can give me is greatly appreciated.

Obtain the registered vendors list (aka planholders list) for this project as follows.

Register in sam.gov and link your entity to your registration. After doing this, log into sam.gov to find the interested vendors list under this announcement. Contact the

Federal Service Help Desk if you experience further issues. To avoid having your questions unanswered in the future, please email your questions only to the applicable email addresses listed on Page A‐5 under

Block 9.

3/1/2022

3 X

Sheet No I.1 – Bridge Drawing 1 of 7 states

“Furnish reinforcing steel to AASHTO M31, or

M322, Grade 60 deformed. Furnish welded wire steel conforming to ASTM A1064, Grade 65.

Provide minimum concrete cover to the face of any bar of 2, unless noted.

Section 602.08 of the specifications states

“Reinforcing Steel will be evaluated under

Section 554.”

Section 554 pertains to Reinforcing Steel in general but has a section on Epoxy‐Coated

Reinforcing Steel.

Can you confirm epoxy coated steel is NOT required? Conversely, if it is required, can you confirm which components are included

(arches, footings, etc)?

The plans do not call for epoxy coated steel.

3/2/2022

Check General or Technical

4 X

“The precast concrete arch elements shall be positively connected to the wingwalls and footing/stemwalls. Do not exceed ¾ inch joint width between adjacent precast units.” The standard methodology for arch/footing interaction is a keyway slot within which the arch is set and then grouted.

If the Agency has something specific in mind beyond this practice, please provide a standard detail and frequency so that we can evaluate its interaction with our structure as well as alert bidders to this additional step.

See Details on Sheet I.3, I.4, and I.5 that depict a keyway slot in the top of footing that the arch is set in.

3/2/2022

5 X

With the uncertainty of the mail delivery, would Western Federal Lands consider accepting email bids for this project?

No. See Notice to Bidders, first sentence of the paragraph titled "Facsimile and email bids, modifications, and withdrawals."

3/2/2022

6 X Other than a mask mandate is there any special protocol for the in person bid turn in?

No. 3/7/2022

7 X Will there be a public opening? Yes. 3/7/2022

8 X

Question regarding the fencing for SH21

Wildlife Overpass at Cervidae Peak, MP 19.3.

We are unable to find the specified 8’ mesh with 4” squares, is there an acceptable alternative? The previous project used 8’ graduated field fence additionally, some areas were fenced stacking 47” field fence.

This will be addressed under Amendment

A003.

3/7/2022

9 X

Question regarding the fencing for SH21

Wildlife Overpass at Cervidae Peak, MP 19.3.

We are unable to find galvanized 11’ T‐Posts, is there an acceptable alternative?

This will be addressed under Amendment

A003.

3/7/2022

10 X We request additional time to respond to the responses received for our questions.

This will be addressed under Amendment

A003.

3/7/2022

11 X

We are running into trouble finding the 8’ woven mesh with the 4” square openings. It sounds like it is not being made at this time. As a possible alternative, would the government approve 8’ tall, graduated mesh?

On previous projects at the same site, 2 layers of 47” field fence stacked was utilized. Is this a possible alternative. Are there any other alternatives we should consider?

This will be addressed under Amendment

A003.

3/7/2022