Revised Technical Exhibit F-1
View the file
Other files for this federal contract opportunity
Show all 50
Total Base Operating Support Services at FLETC Charleston SC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit_F-1_Timeline_for_Delive
| Cite | Frequency | Requirement | From | To |
| C.1(d)(4) | 10 days before change | Training Schedule & Session Start Dates | CO | KTR |
| C.3(a) | At contract start and annually | Inventory GFP & GFE | KTR | COTR |
| C.3(a) | Completion of contract | Inventory Report on GFP | KTR | COTR |
| C.3(a) | With technical proposal | Property Control Plan | KTR | CO |
| C.3(a)(2) | Prior to commencing work | Inventory Schedule | KTR | CO |
| C.3(a)(2)b | As needed | FTC-ADM-44 "Survey Report" | KTR | COTR |
| C.3(a)(3) | As needed | FTC-ADM-1A "FLETC Purchase Requisition" | KTR | COTR |
| C.4(a)(2) | Post-Award Conference | Designated on-site manager and alternates | KTR | CO |
| C.4(b)(3) | Within 3 days after scheduled meetings | Written minutes of Performance Evaluation Meetings | KTR | CO |
| C.4(c)(1) | 30 days after award of contract | Management Plan | KTR | CO |
| C.4(c)(1) | 30 days after exercise of the option to renew | Updated Management Plan | KTR | CO |
| C.4(h) | When requested by CO | Emergency Response Plan | KTR | CO |
| C.5.A.3(a) | Prior to performance | Samples of Materials & Supplies - Janitorial | KTR | COTR |
| C.5.A.4(a) | Within 30 days prior to performance | Initial work schedule | KTR | CO |
| C.5.A.4(a) | 3 work days prior to performance | Changes to work schedule | KTR | CO |
| C.5.A.4(b) | Prior to effective date of contract | Sample of hazardous operation signs | KTR | COTR |
| C.5.A.4(e)(3) | Within 30 days after contract award | Trash Disposal Plan | KTR | COTR |
| C.5.B.4(a) | 5 work days after training is completed | Training Program - Dormitory | KTR | COTR |
| C.5.B.5(c) | 1 week in advance | Student Class Roster | CO | KTR |
| C.5.B.5(c) | Within 2 days of creation | Pre-Registration Package | KTR | VCC |
| C.5.B.5(c)(4) | Next work day | Post Arrival Registration Forms | KTR | COTR |
| C.5.B.5(c)(5)b | 24 hours of student departure | Report of student's failure to return keys | KTR | COTR |
| C.5.B.5(c)(5)c | As occurs | FTC-ADM-38 "Missing Items Invoice" | KTR | COTR |
| C.5.C.3(a) | Prior to performance | Samples of Material & Supplies - Food Service | KTR | COTR |
| C.5.C.3(b) | As necessary | Request for approval of purchases - Food Services | KTR | CO |
| C.5.C.4(a)(c) | Upon commencement of work | Receipt of GFE - Food Service | KTR | CO |
| C.5.C.4(c) | As needed | FTC-ADM-46 Move Order - Food Service Equipment Removal | KTR | COTR |
| C.5.C.4(d)(2) | Annually | 5 Year Replacement Plan of Cooking and Food Storage Equipment | KTR | CO |
| C.5.C.5(b) | Prior to start of employment | Employee Certification | KTR | CO |
| C.5.C.5(c) | 30 days after start of each contract performance period | Annual Training Plan - Food Services | KTR | COTR & EVS |
| C.5.C.5(c) | 5 work days after training is completed | Training Program Report Food Services | KTR | COTR & EVS |
| C.5.C.5(d)(3) | As needed | Review of price structure | KTR | CO |
| C.5.C.5(f)(1) | 2 work days prior to event | Class Party Picnic Request | COTR | KTR |
| C.5.C.5(f)(3) | 24 hours notice | Boxed Meal Delivery | COTR | KTR |
| C.5.D.3(c) | Within 10 days after award | List of all Test & Measurement Equipment | KTR | COTR |
| C.5.D.4(c) | Within 7 work days after work completed | Completed work authorizations | KTR | COTR |
| C.5.D.4(c) | Weekly | Report of unscheduled work accomplished | KTR | COTR |
| C.5.D.4(c)(1) | Completion of contract | Facility/Building Record files | KTR | CO |
| C.5.D.4(c)(2) | Upon request | Reports based on facility history data | KTR | CO |
| C.5.D.4(c)(2) | Within 10 work days of completion of contract | Turn over history files of facilities/specialty equipment/components | KTR | CO |
| C.5.D.5(d)(1)b | NLT 10:00 AM the following work day | Log of all service calls received | KTR | COTR |
| C.5.D.5(d)(4) | NLT 10:00 AM the following work day | Work authorization for Beyond the Scope of a service call with attached summary & estimate | KTR | COTR |
| C.5.D.5(e) | Within 10 days prior to scheduled start of work | Recurring facility work | KTR | COTR |
| C.5.D.5(e)(2) | Within 30 days after contract award and each option period | Preventive Maintenance Schedule Report | KTR | CO |
| C.5.D.5(e)(2)c | Weekly | Crawl Space Inspection of Dining Hall | KTR | COTR |
| C.5.D.5(e)(2)d | NLT 10th day of following month | Monthly progress report for PM's | KTR | COTR |
| C.5.D.5(e)(4)c | Weekly | Dining Hall Grease Trap Inspection Report | KTR | COTR |
| C.5.D.5(e)(5)a | 10 work days in advance of planned outage | Request for scheduled utility outage | KTR | COTR |
| C.5.D.5(e)(5)b | Within 5 work days of the occurrence | Investigation Report of unscheduled outage | KTR | COTR |
| C.5.D.5(e)(7)b | 2 work days after start up/shut down of HVAC equipment | Report of PM repairs beyond scope | KTR | COTR |
| C.5.D.5(l) | Monthly | Fire Protection Inspection Report | KTR | COTR |
| C.5.D.5(l)(1)c | As completed | Fire Alarm & Associated Systems Reports | KTR | COTR |
| C.5.D.5(l)(2)b | Within 24 hours of occurrence | Report of facility security system malfunctions | KTR | COTR |
| C.5.D.5(m)6 | Annually | Elevator Inspection Report | KTR | COTR |
| C.5.D.5(n)(4) | Within 15 days of completion of annual inspection | Inspection report of findings regarding wood destroying organisms | KTR | COTR |
| C.5.D.5(n)(6) | Quarterly | All pest control services performed | KTR | COTR |
| C.5.D.5(q) | Weekly | Eyewash Station Deficiency Report | KTR | COTR & EVS |
| C.5.E.4(a) | Upon request | Schedule of grounds maintenance tasks | KTR | CO |
| C.5.E.4(d)(3) | Monthly with invoice | Report indicating herbicide usage as a means of weed control | KTR | COTR |
| C.5.E.5(a)(9) | Monthly | Insect & Disease Control Report | KTR | COTR |
| C.5.E.5(c)(1) | Prior to start of pruning work | Tree Pruning Plan | KTR | COTR |
| C.5.F.3(a)(1) | Prior to work | Material and Supplies submittals - PT Complex | KTR | COTR |
| C.5.F.4(f)(1) | NLT 2:30 PM every Monday | Inventory reports - PT | KTR | COTR |
| C.5.F.4(f)(2)a | NLT 5 work days after the last day of each month | Report of monthly transactions to include class, staff, and daily issucs/exchangcs/returns, etc, | KTR | COTR |
| C.5.F.4(f)(2)b | Quarterly-within 5 work days following the inventory | Inventory of all uniform items & accessories | KTR | COTR |
| C.5.F.4(f)(4) | Within 4 work hours of request | Computer-generated reports | KTR | CO |
| C.5.F.5(b)(1) | Within 24 hours following the pick-up from Shipping & Receiving | FTC-ADM-82 "Receiving Report" | KTR | COTR |
| C.5.F.5(b)(1) | 24 hours after receipt | FTC-ADM-37 "Stock Issue Report" | KTR | COTR |
| C.5.F.5(c)(3) | Immediately | FTC-ADM-44 "Survey Report" for items returned w/hazardous materials/saturated with blood | KTR | COTR & EVS |
| C.5.F.5(c)(5) | As occurs | FTC-ADM-38 "Missing Items Invoice" | KTR | COTR |
| C.5.F.5(c)(7) | Last work day of each month (minimum) | Stock replenishment data | KTR | COTR |
| C.5.F.5(h) | Weekly | FTC-ADM-44 "Survey Report" for items that are heavily worn, perm. Stained, irreparable, etc. | KTR | COTR |
| C.5.F.5(i)(10) | 3rd work day of each month | Report of the previous month's recreational events & a schedule of upcoming planned events | KTR | COTR |
| C.5.F.5(i)(11) | As needed | Submit request for recreation equipment | KTR | COTR |
| C.5.F.5(j)(4) | By 2:30 PM every Tuesday | Pool operation records/logs | KTR | COTR |
| C.5.G.5(a)(1)&(b)(2) | Prior to start of performance | Plan for inventory control & range maintenance | KTR | CO |
| C.5.G.5(a)(10)a(2) | 5th work day after end of month | Vehicle Service/Repair Order Report | KTR | COTR |
| C.5.G.5(a)(2)d | Monthly | Drivers Training (DT)Helmet and Lens Maintenance Schedule | KTR | COTR |
| C.5.G.5(a)(3)d | Monthly 5 work days after last day of month | Fleet Vehicle Preventive Maintenance Schedule | KTR | COTR |
| C.5.G.5(a)(5)a | At least one week prior to start of class | List of vehicle/portable radio requirements | COTR | KTR |
| C.5.G.5(a)(9)c | Quarterly and as requested | Drivers Training (DT) Inventory Report | KTR | COTR |
| C.5.G.5(b)(3)g.6 | lst work day of month | Inventory of all spent ammunition disposal items on hand | KTR | COTR |
| C.5.G.5(b)(5) | Monthly | Report of inventory of ammunition, weapons, firearms inventory | KTR & Gov't Rep | COTR |
| C.5.G.5(b)(5)b | Monthly | Destruction Report of .40 caliber inserts | KTR | COTR |
| C.5.H.5(b)(4) | One week prior to exercise; when available | Updated Scenarios | COTR | KTR |
| C.5.H.5(b)(5) | By 2:00 PM the following workday | Role Player Evaluations | KTR | COTR |
| C.5.H.5(b)(8) | Monthly | Role Player Schedule | CO | KTR |
| C.5.I.4(a)(14) | Quarterly | Inventory & update Training Film List | KTR | COTR |
| C.5.I.4(a)(15) | Monthly | List of needed replacement tapes | KTR | COTR |
| C.5.I.4(a)(6) | Monthly | Schedule of preventative maintenance on all assigned training aids | KTR | COTR |
| C.5.I.4(a)(8) | Annually | Inventory audio/visual equipment | KTR | COTR |
| C.5.I.4(b)(3) | Daily, as needed | Computer lab equipment/software malfunction and lab use report | KTR | COTR |
| C.5.I.4(d)(3) | 3rd work day of quarter | Inventory audio/visual equipment | KTR | COTR |
| C.5.I.4(d)(3)(b) | Upon request | Inventory Report - IT | KTR | COTR |
| C.5.J.4(b)6 | As received | Fleet Vehicles Service Repair Orders (SROs) | KTR | COTR |
| C.5.J.4(b)6 | Monthly by 9:00 AM on 3rd of each month | Fleet Vehicle Report | KTR | COTR |
| C.5.K.4(b)(1)f | 24 hours of receipt | Signed/dated packing slip, GSA/CSC bill of lading, etc. | KTR | COTR |
| C.5.K.4(b)(2)c | Daily upon completion | Completed FTC-ADM-46 "Move Order Request" | KTR | COTR |
| C.5.K.4(b)(3)b | After award of contract & updates as occur | List of approved signatures | CO | KTR |
| C.5.K.4(b)(6)f | 2:30 PM every 1st and 3rd Monday | Printed Materials Inventory Report | KTR | COTR |
| C.5.K.4(b)(8)b | Upon 24 hour notification | Computer-generated reports - Inventory Storage | KTR | COTR |
| C.5.K.4(b)(8)f | Monthly | Log of sequential numbers issued to warehouse items that do not have stock numbers | KTR | COTR |
| C.5.K.4(b)(8)g | Upon request | Backup of all data files | KTR | CO |
| C.5.K.4(b)(8)h | Upon request | Backup of entire program file | KTR | CO |
| C.5.K.4(b)(8)i | Weekly by 2:30 PM Monday | Inventories of individual warehouses | KTR | COTR |
| C.5.K.4(b)(8)k | Quarterly-within 5 work days of the following quarter | Wall-to-wall inventory | KTR | COTR |
| C.5.L.1(c) | Notice given 7 work days prior to training | Government Required Training | CO | KTR |
| C.5.L.2(a) | Prior to start of work | Names of designated Safety Representatives | KTR | CO |
| C.5.L.2(b) | 14 calendar days after award | Safety Program | KTR | CO |
| C.5.L.2(d)4(a) | 30 days after post award conference | Hazardous Communication Program | KTR | CO |
| C.5.L.2(i)1 | Annually | Results of Inspection and Test Samples | KTR | COTR & EVS |
| C.5.L.2(i)4 | 24 hours of mishap | Mishap Report | KTR | COTR |
| C.5.L.2(i)7 | Annually | Noise Hazard Survey | KTR | COTR & EVS |
| C.5.L.2(j)2(d)1 | Perpetual | Drum Inventory Report | KTR | CEPS |
| C.5.L.2(k) | Annually | Hazard Deficiency Abatement Report | KTR | CO |
| C.5.L.2(k) | Annually | Occupational Injuries & Illness of Personnel Report | KTR | CO |
| C.5.L.2(k) | Annually | Employee Medical Surveillance Plan | KTR | CO |
| C.5.L.2(k) | Monthly | Solid Waste Disposal Report | KTR | COTR |
| C.5.L.2(k) | As occurs | Employee Safety & Environmental Training | KTR | CO |
| C.5.L.2(k)2(c) | Within 15 minutes of occurrence | Emergency Spill Response | KTR | CEPS & COTR |
| C.5.L.2(k)2(d) | 1st work day following emergency call back | Emergency Call Back Report | KTR | COTR |
| C.5.L.2(l)1-6 | Monthly | Pollution Prevention Act ad-hoc Reports | KTR | CEPS & COTR |
| C.5.L.2(m)11 | 14 days of award of contract | Hazardous Waste Training | KTR | CEPS |
| C.5.L.2(m)2 | 14 days prior to start of contract | Hazardous Waste Management Plan | KTR | CO |
| C.5.L.2(n)3(c) | 15 days after award of contract | Indoor Air Quality Management Plan for all buildings | KTR | CO |
| C.5.L.2(n)3(d)(2) | 14 days of receipt of materials on MSDS | Material Safety Data Sheet | KTR | COTR |
| C.5.L.2(n)3(d)(3) | 30 days after award of contract | List Indicating Manufacturer, Brand Name, & Intended Use | KTR | COTR |
| C.5.L.2(n)3(d)(6) | As occurs | Laboratory Report - Testing of Samples | KTR | COTR |
| C.5.L.2(n)3(d)(10) | Quarterly | Report of Environmentally Preferred Products | KTR | COTR |
| C.5.L.2(o)2 | Quarterly | Inventory of Electronic Equipment & Appliances | KTR | COTR |
| C.5.L.2(r)1 | After award and annually w/i 15 calendar days before option period | Environmental Management Plan | KTR | CO |
| C.5.L.2(r)1 | Whenever the methods or procedures are changed | Updated Environmental Management Plan | KTR | CO |
| C.5.L.2(r)2.a | With technical proposal | Hazardous Material Compliance Plan | KTR | CO |
| C.5.L.2(r)2.b | After award and annually w/i 15 calendar days before option period | Lead Compliance Plan | KTR | CO |
| C.5.L.2(r)2.b | Whenever the methods or procedures are changed | Updated Lead Compliance Plan | KTR | CO |
| C.5.L.2(r)3 | With technical proposal | Environmental Preferability submission | KTR | CO |
| C.5.L.2(r)3.f | With technical proposal | Waste Minimization and Recycling Strategy | KTR | CO |
| E.3(b) | 15 days prior to performance | Quality Control Plan | KTR | CO |
| E.3(d) | 10 calendar days after completion of contract | Quality Control Inspection Report | KTR | CO |
| E.4(b) | Post-Award Conference | COTR Duties | CO | KTR |
| F.3 | 5 work days prior | Post Award Conference Date | CO | KTR |
| G.10(d) | Within 5 work days | Confirmation of oral technical direction | COTR | KTR/CO |
| G.14 | Within 2 work days | Oral Order Confirmation | CO | KTR |
| G.5(b) | Post Award Conference | Designation of COTR | CO | KTR |
| G.5(c) | Post Award Conference | Designation of Property Administrator | CO | KTR |
| G.6(c)(1) | 1st of Month | Invoice for previous month | KTR | CO |
| G.7(d)(1) | 7 days after award | Payment Information | KTR | CO |
| G.7(d)(2) | 30 days prior to effective date | Change to payment information | KTR | CO |
| H.3(c) | 15 calendar days prior to start date | Diaster Preparedness Contingency Plan | KTR | CO |
| H.5 | Prior to occupation of position | Resume of personnel listed on Pages H-5 thru H-7 | KTR | CO |
| H.6(b) | Prior to exercise of each option | Current Wage Determination | CO | KTR |
| H.7(a)(2)f | 4 times per year | Random Drug Test of Contract Employees | Test Lab | CO |
| H.8(b) | Post Award Conference | List of all Contractor Vehicles | KTR | CO |
| H.14(a) | Prior to start of work | Certificate of Insurance | KTR | CO |
| H.16(c)(4)a | 10 calendar days in advance of employee access | SF85P and I-9 | KTR | FLETC Sec Mgr |
| H.16(c)(5) | 5 work days in advance of employee access | FTC-SEM-017a | KTR | FLETC Sec Mgr |
| H.16(e)(1) | 7 work days after final acceptance of work | FLETC Badges and Vehicle Pass | KTR | FLETC Sec Mgr |
| H.17(5) | Within 24 hours of occurrence | Job-Rrelated Accident Reports (OSHA Form 300) | KTR | CO |
| H.17(6) | 24 hours of occurrence | Damage Report | KTR | CO |
| H.17(9) | 2 work days prior | Photo Requests | KTR | COTR |
| H.19(a)(13) | 5 days of occurrence | Termination/Resignation of Employee | KTR | CO |
| H.19(b)(1) | 15 calendar days prior to start of contract | Employee Roster (include relief personnel) | KTR | CO |
| H.19(b)(2) | Annually | Updated Employee Roster | KTR | CO |
| H.20(b) | If necessary | Collective Bargaining Agreement | KTR | CO |
| H.23 | 15 days after award of contract | Key Control Plan | KTR | CO |
| H.23 | Within 48 hours of occurrence | Report of loss/unauthorized duplication of Gov't issued keys | KTR | CO |
| H.26(a)(2) | Post Award Conference | Phase In Plan | KTR | CO |
| H.26(b)(4) | Prior to expiration/termination of contract & after selection of successor contractor | Transition Plan | KTR w/successor KTR | CO |
| H.26(b)(4) | 5 days after completion of contract | Removal of all contractor owned property, tools, supplies, etc. | ||
| H.27(a) | 10 calendar days after notice of award | SF1418 Performance Bond | KTR | CO |
| H.29 | As necessary | Request for approval of subs | KTR | CO |
| I.21 3052.215-70(e) | With proposal and prior to replacement of key personnel | Current signed resumes for key personnel | KTR | CO |
| Various | 5 calendar days after completion of contract | Turn over all records and reports | KTR | CO |