Q A_Matrix_2_P45450_03_Feb_15.pdf
PDF 39 KB Posted
- Attached to
- Drydock and Ship Repair of USCGC POLAR STAR
- Solicitation number
- HSCG85-15-R-P45450
About this file
Q A Matrix 2 P45450
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG85‐15‐R‐P45450
Question and Answer Matrix 2
Specification Work Item D‐32 and 33
Vent Ducting Renewal
Regarding work items 32 and 33, the drawings provided in the work items, which are cut from drawing “400 WAGB_3801_4_1, Rev J” are illegible as is the original drawing provided in the reference package. In order to properly bid the ducting renewals please provide a better copy of this drawing.
A higher resolution drawing will be emailed to all prospective offerors that requested drawings.
Please provide the most recent fire inspection report for the Polar Star. The USCG is not aware of this report.
Attachment 2, Provisions
Accessibility of the Contractor's Facility
Regarding Provision (12) of the solicitation “ACCESSIBILITY OF CONTRACTOR’S FACILITY”, the requirement is for the facility and the approach to have a minimum water depth of 34 feet. Previous drydocking solicitation for FY14: HSCG85‐14‐C‐P45C85 Amendment 2 required a 2 foot under keel clearance at MLLW from its light load draft of 27 feet. Will a similar amendment to the current solicitation provision be added for this contract to reduce the necessary minimum water depth prior to the cutter’s arrival at the Contractor’s facility. Please see the attached Amendment 2 from the previous solicitation.
The specification work items 6,7,8 and contract term (12) will be revised to: a minimum of 2 feet under the keel in Amendment 4.
13 Should we be watching out for another amendment?
Yes. Amendment 4 will be coming out shortly.
File details come from the government source that posted it. Updated .