Amendment_3_HSCG85-15-R-P45450_30_Jan_15.pdf

PDF 20 KB Posted

Attached to
Drydock and Ship Repair of USCGC POLAR STAR
Solicitation number
HSCG85-15-R-P45450
Issued by

About this file

Amendment 3 to HSCG85-15-R-P45450

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

000003

The purpose of this amendment is to incorporate the changes to RFP HSCG85-15-R-P45450. Changes affect RFP Attachment 1 USCGC POLAR STAR (WAGB-400) Dry Dock Repairs work items 5, 11 and 14.

UNITED STATES COAST GUARD

SURFACE FORCES LOGISTICS CENTER

1519 ALASKAN WAY

SEATTLE, WA 98134

HSCG85-15-R-P45450

1 2

01/30/2015

01/15/2015

SF 30 HSCG85-15-R-P45450Amendment 000003 Block 14 Continued.

RFP Attachment 1 USCGC POLAR STAR (WAGB-400) Dry Dock Repairs is amended as follows:

1) Replace the table in Work Item 5, Section 1.1 with table below:

QTY

TYPE/DESCRIPTION

SIZE

LOCATION

20% of sea chest zincs

Sea chest 11” circular Sea chest

25% of stern tube exterior zincs

Stern tube exterior zincs 6” x 12”

Stern Tube

54 Doughnut zincs, aft shaft bearing retainer

3” Aft shaft bearing retainer

2) Replace paragraph in Work Item 11, Section 3.7.1 with: At the conclusion of the maintenance availability, disassemble, package and inventory small parts and prepare for shipment. Hydraulic actuators shall be shipped with cylinder rods in the retracted position.

3) Replace Work Item 14, Section 3.2.2 with: Coating removal.

The contractor shall be advised that the existing coating system on the hull may have a nominal thickness of 35 mils due to “patch-coats” applied during past dry-dock availabilities. Surface preparation shall be accomplished in accordance with SFLC Std Spec 6310 Appendix A.

4) Replace Work Item 14, Section 3.2.3.3 first paragraph with: 3.2.2.3 Sea chests. Clean sea chests, sea chest strainer plates, by abrasive-blasting to “SSPC-SP 10/NACE No. 2, Near-White Blast Cleaning”, to produce a 1.5 to 2.5 mil anchor profile; or by waterjetting to "SSPC-SP WJ-2(M)/NACE WJ-2(M)”.

File details come from the government source that posted it. Updated .