Amendment_4_HSCG85-15-R-P45450.pdf
PDF 48 KB Posted
- Attached to
- Drydock and Ship Repair of USCGC POLAR STAR
- Solicitation number
- HSCG85-15-R-P45450
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
000004
The purpose of this amendment is to incorporate the changes to RFP HSCG85-15-R-P45450.
1. RFP HSCG85-15-R-P45450: Remove pages 4, 11, and 27 of the solicitation and replace with pages 4, 11, and 27 appended to this amendment. Changes are highlighted in yellow.
2. RFP Attachment 1: Remove USCGC POLAR STAR (WAGB-400) Dry Dock Repairs FY 2015 (Rev-3, 19 December 2014) and all references to the document and replace with USCGC POLAR STAR (WAGB-400) Dry Dock Repairs FY 2015 (Rev-4, 03 February 2015). Changes are tracked in Revisions Record on page iv of Attachment 1.
UNITED STATES COAST GUARD
SURFACE FORCES LOGISTICS CENTER
1519 ALASKAN WAY
SEATTLE, WA 98134
HSCG85-15-R-P45450
1 4
02/03/2015
01/15/2015
REQUEST FOR PROPOSAL
SOLICATION NUMBER: HSCG85-15-R-P45450
D-025 Scientist Stateroom Starboard, Refurbish
1 JB
D-026 Scientist Stateroom Port, Refurbish
D-027 Helo Foam Equipment Room, Deck Renewal
0028 D-028 Vane axial Fan Overhaul 1 JB
D-029 Vent Ducting Motor and Gear Room, Renewal
D-030 Transducer Compartment Preserve 100%
D-031 Vane axial Fan Overhaul Uptake Spaces
D-032 Vent Ducting Renewal, Diesel 2 Uptakes
D-033 Vent Ducting Renewal, Diesel 1 Uptakes
0034 D-034 CHS Valve Flanges, Leak Repairs 1 JB
D-035 Miranda Davit, Biennial Inspection and Test
D-036 Allied K280-70 Crane, Annual Inspect and Repair
0037 D-037 Deck Covering Polymeric Renew 1 JB
D-038 Elevators and Dumbwaiter, Level 1 Annual Certification
0039 D-039 Expansion Joints, Renewal 1 JB
D-040 Fixed CO2 and Halon Systems Annual Certification
0041 D-041 Joiner Door Renewal 1 JB
D-042 Centerline Propulsion Hub Removal and Reinstallation (Optional Item)
D-043 Port Propulsion Hub Removal and Reinstallation
D-044 Stbd Propulsion Hub Removal and Reinstallation
0045 DELETED
D-046 Diesel Generator Room No. 1, Bilge Preservation
D-047 Diesel Generator Room No. 2, Bilge Preservation hazardous waste personnel. The point of contact for environmental issues is the Environmental Protection Specialist at ISC Boston (617) 223-3387.
(10) VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS
(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.
(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:
(1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;
(2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.
(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.
(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.
(11) TELEPHONE CHARGE
The Commanding Officer of the Cutter will pay all toll charges and applicable taxes and surcharges for long-distance telephone calls placed by ship’s crew. All other charges shall be borne by the Contractor.
(12) ACCESSIBILITY OF CONTRACTOR'S FACILITY
The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of two feet below the keel and a minimum vertical clearance of _155_ feet.
(13) INSURANCE REQUIREMENTS
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
Document Title Pages Attachment I USCGC POLAR STAR (WAGB-400) Dry Dock
Repairs FY 2015 (Rev-4, 03 February 2014)
File details come from the government source that posted it. Updated .