AttJ.2ElectronicSectionB.xls

XLS spreadsheet 27 KB Posted

Attached to
J - DRY-DOCKING AND REPAIRS OF THE CGC SYCAMORE
Solicitation number
HSCG85-11-R-P30FG6
Issued by

About this file

Attachment J.2 Electronic Section B

View the file

Other files

File Type Posted
Amendment0013(11RP30FG6).pdf PDF
Amendment0012(11RP30FG6).pdf PDF
225B-WLB_601_2_3_-_H 1 .dwf DWF file
Amendment0011(11RP30FG6).pdf PDF
225-WLB_531_50_3_-_A 1 .dwf DWF file
225-WLB_531_50_1_-_A 1 .dwf DWF file
225-WLB_531_50_4_-_A 1 .dwf DWF file
225-WLB_531_50_5_-_A 1 .dwf DWF file
Amendment0010(11RP30FG6).doc DOC document
225-WLB_531_50_2_-_A 1 .dwf DWF file
Amendment0009(11RP30FG6).pdf PDF
Amendment0008(11RP30FG6).pdf PDF
Amendment0007(11RP30FG6).pdf PDF
Amendment0006(11RP30FG6).pdf PDF
Amendment0005(11RP30FG6).pdf PDF
Amendment0004(11RP30FG6).pdf PDF
Amendment0003(11RP30FG6).pdf PDF
Amendment0002(11RP30FG6).pdf PDF
Work Item 79 Temporary Berthing Provide.pdf PDF
Amendment0001(11RP30FG6).pdf PDF
AttJ.1SycamoreFY11DD_Rprs.pdf PDF
Solicitation(SchedA-M)(11RP30FG6).doc DOC document
SFLCStdSpec8634.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sect B

Definite/OptionalWork Item No.Work Item TitlePrice
D1Hull Plating, U/W Body, Inspect
D2Appendages (U/W), Leak Test
D5Tanks (MP Fuel Stowage and Overflow), Clean
D6Voids (Non-Accessible), Leak Test
D7Chain Lockers, Inspect
D8Tanks (MP Fuel Stowage and Overflow), Inspect
D10Tanks (Potable Water), Clean and Inspect
D11Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal
D12Controllable Pitch Propeller, Hub General Maintenance
D13Controllable Pitch Propellers, Clean and Inspect
D14Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean
D15Doppler Speed Log Transducer(s), Renew
D16Vent Ducts (Engine and Motor Room All), Commercial Cleaning
D17Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
D18Vent Ducts (Laundry Exhaust), Commercial Cleaning
D19Vent Ducts (All Other), Commercial Cleaning
D20Sea Bay, Clean and Inspect
D21Anchor, Anchor Chain and Ground Tackle, Preserve
D22Grey Water Holding Tanks, Clean and Inspect
D23Sewage Holding Tanks, Clean and Inspect
D24Sewage Piping, Clean and Flush
D25Decks - Exterior (Buoy), Preserve
D26Decks - Exterior, Preserve "Non-Skid Broadcast Grit"
D27U/W Body, Preserve "100%"
D28Hull Plating Freeboard, Preserve "Partial"
D29Drydocking
D30Buoy Crane, Swing Drive Brake Conversion
D31Bilge (Machinery Space), Preserve
D32Anchor, Anchor Chain and Ground Tackle, Inspect and Repair
D33Temporary Services, Provide
D34Propulsion Shaft Rope Guard, Inspect and Repair
D36Strain Gage Alignment, Check
D44Hull Plating (U/W Body), Ultrasonic Testing
D45Rudder Stock Bearings, Check Clearances
D46Rudder, Inspect and Repair
D49Pad Eyes, Links, Gripes, Binders and Jacks, Test
D50Anchor Windlass, Overhaul
D51Superstructure, Preserve "Partial"
D52Impressed Current Cathodic Protection System Dielectric Shield, Repair
D54Sea Valves and Waster Pieces, Overhaul or Renew
D55Deck Covering (Wet), Seal
D56Deck Covering (Interior Wet/Dry) , Renew
D57Scuttle Replacement
D58Air Conditioning Condenser Seawater Cooling Overboard Discharge Piping Modification
D59Auxiliary Seawater Cooling Piping, Repair
D60Steering System Relief Valves, Test
D61Intake Air Ducts (MDE and SSDG), Commercial Cleaning
D62Thruster Units (General), Overhaul
D63Shower Deck Drain, Modification
D64Reverse Osmosis Desalination Plant, Renew
D65Fire Pump, Overhaul
D66Sea Trial Performance, Provide Support
D67Propulsion Shaft Bearings (External), Check Clearances
D68Fathometer Transducer, Renew
D69Impressed Current Cathodic Protection System, Inspect and Maintain
D70Controllable Pitch Propeller, System Maintenance
D71Fwd Scan Sonar Transducer, General Maintenance
D72Controllable Pitch Propeller, OD Box Repairs
D77Cathodic Protection / Zincs, Install
D79Temporary Messing and Berthing, Provide
O3Appendages (U/W) - Internal, Preserve
O4Chain Locker, Clean
O9Voids (Non-Accessible), Preserve Internal Surfaces
O35Propulsion Shafting Remove, Inspect, and Reinstall
O37Propulsion Shaft Bearing, Stave Renewal
O38Sea Bay, Preserve Partial
O39Chain Locker, Preserve Partial, Preserve Partial
O40Tanks (Grey Water Holding), Preserve "Partial"
O41Tanks (Potable Water), Preserve "Partial"
O42Tanks (Sewage Holding), Preserve "Partial"
O43Stern Tube Interior Surfaces, Preserve 100%
O47Rudder and Rudder Stock, Removal and Inspection
O48Rudder Bearings, Renewal
O53Impressed Current Cathodic Protection System Dielectric Shield, Renew
O73Chain Locker, Preserve 100%
O74Tanks (Potable Water), Preserve "100%"
O75Tanks (Grey Water Holding), Preserve "100%"
O76Tanks (Sewage Holding), Preserve "100%"
O78Hull Plating Freeboard, Preserve (" 100% ")
O79Composite Manhour Rate (Section H.2)
3,000 hours X (Rate) _____________=
O80Lay Day Rate (Section H.3
20 days X (Rate) ______________=
Total Price:

File details come from the government source that posted it. Updated .