Amendment0009(11RP30FG6).pdf
PDF 66 KB Posted
- Attached to
- J - DRY-DOCKING AND REPAIRS OF THE CGC SYCAMORE
- Solicitation number
- HSCG85-11-R-P30FG6
About this file
Amendment 0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0013(11RP30FG6).pdf | ||
| Amendment0012(11RP30FG6).pdf | ||
| 225B-WLB_601_2_3_-_H 1 .dwf | DWF file | |
| Amendment0011(11RP30FG6).pdf | ||
| 225-WLB_531_50_3_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_1_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_4_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_5_-_A 1 .dwf | DWF file | |
| Amendment0010(11RP30FG6).doc | DOC document | |
| 225-WLB_531_50_2_-_A 1 .dwf | DWF file | |
| Amendment0008(11RP30FG6).pdf | ||
| Amendment0007(11RP30FG6).pdf | ||
| Amendment0006(11RP30FG6).pdf | ||
| Amendment0005(11RP30FG6).pdf | ||
| Amendment0004(11RP30FG6).pdf | ||
| Amendment0003(11RP30FG6).pdf | ||
| Amendment0002(11RP30FG6).pdf | ||
| Work Item 79 Temporary Berthing Provide.pdf | ||
| Amendment0001(11RP30FG6).pdf | ||
| AttJ.1SycamoreFY11DD_Rprs.pdf | ||
| AttJ.2ElectronicSectionB.xls | XLS spreadsheet | |
| Solicitation(SchedA-M)(11RP30FG6).doc | DOC document | |
| SFLCStdSpec8634.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0009 06 MAY 11 21-11-851P30FG6
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-11-R-P30FG6
9B. DATE (SEE ITEM 11)
18 APR 11
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CGC SYCAMORE (WLB 209) FY11 DRYDOCK & REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
HSCG85-11-R-P30FG6 Amendment 0009
1. Response(s) to Request(s) for Clarification 0011 - 0012 is/are provided as Attachment A.
2. The following pertains to Work Item 32 as a result of Question 0012.
a. Work Item 32 has been revised significantly. Offerors shall substitute the attached Work Item 32: Rev 1 Anchor Chain(s) and Ground Tackle, Inspect and Repair) for the existing Work Item 32.
b. To avoid unnecessary administrative work for offerors and SFLC, no substitution pages are provided for the following solicitation documents (or any other pertinent documents not listed below):
Solicitation Section B (page 2) Attachment J.1, Table of Contents page ii, Title for WI 32 Attachment J.2. Electronic Section B
3. Offerors’ attention is invited to the Section I.1 clause “Limitations on Subcontracting” (FAR 52.219-14). In pertinent part, the clause states:
“The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.”
By submission of its price proposal, offerors shall be certifying compliance with the above clause.
4. There is no change to the proposal closing date, which remains as follows:
5/13/11 4 p.m. Pacific Time Submission of Pre-Award Drydock Certification & Calculations (Sec L.9.2).
5/23/11 11 a.m. Pacific Time Price Proposal & Attachment J.2.
ATTACHMENT A
Date: 5/3/11
Question No. 0011
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS
RFP No.: HSCG85-11-R-P30FG6
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. 71 PARA NO. All
TITLE: Fwd Scan Sonar Transducer, General Maintenance
QUESTION:
Item OEM representative indicates sonar renewal vs overhaul may be intended – given shipment of a new unit to the CGC Sycamore homeport. Contractor requests confirmation item intent is to service/overhaul the existing sonar.
RESPONSE:
Work Item 71 will be performed as written. However, SFLC has purchased a new Forward Scan Sonar Transducer in the course of long-term maintenance planning for the WLB 225 class buoy tenders. Though not scheduled to replace the SYCAMORE’s existing transducer, it could conceivably be available should that need arise after initial inspections.
ATTACHMENT A
Date: 05/04/11
Question No. 0012
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS
RFP No.: HSCG85-11-R-P30FG6
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. 32 PARA NO. 3.3
TITLE: Inspection and Repair Requirements
QUESTION:
1. Is Contractor allowed to use ships equipment in coordination with Contractors equipment to lower anchors while on Dry Dock
2. What specification criteria does the Contractor use to determine wastage of chain links
,Naval Ships Technical Manual?
3. What material specifications are needed for the tapered pins and are the connecting links required to have lock wire pins
4. What are the material specification s for the bitter end shackles?
RESPONSE:
Work Item 32 has been changed. The new copy of the spec (Rev 1) is supplied with Amendment.
Following are answers to the original questions, modified to address the Rev 1 spec.
1. Yes, Contractor allowed to use ships equipment; please see "NOTE" under paragraph
3.2.1.1 (Removal); it states that "The use of Coast Guard equipment (e.g. anchor windlass) for off-loading and on-loading of anchors and anchor chain is authorized. Coast Guard personnel will operate all Government equipment."
2. See Table I in revised spec.
3. All chain and chain attachment materials must all conform to Fed Spec RR-C-271, Type IV-
A, Class 3, Grade A. Connecting links are required to have lock wire pins.
4. All chain and chain attachment materials must all conform to Fed Spec RR-C-271, Type IV-
A, Class 3, Grade A.
Additional information regarding Work Item 32 can be found in this amendment.
USCGC SYCAMORE (WLB-225B) DRYDOCK AVAILABILITY 2011
AMENDMENT 0009
58101_0511_FLT
REC_58110_FLT_225' WLB ('B' Class: Hulls 201-205) (1010)
WORK ITEM 32: Rev 1 Anchor Chain(s) and Ground Tackle, Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspection and repairs the Anchor Chain assemblies (port and starboard), including associated ground tackle.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color
Manual
OTHER REFERENCES
Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and
Weldless MIL-DTL-23549, Feb 2007, Grease, General Purpose MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP
1), 2004, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3 (Inspections).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph
3.3.5 (Interferences):
Port and Starboard Anchors.
3.2 Required work particulars. The Contractor shall use the chain description (see 4.1 (Component characteristics)) and Coast Guard Drawing 225B WLB 581-001 for guidance, for accomplishing the tasks specified below for each anchor chain assembly.
3.2.1 Removal.
3.2.1.1 Disconnect and remove the anchor chain assembly and transport from the vessel to a suitable location, to facilitate the performance of the tasks specified herein.
NOTE
The use of Coast Guard equipment (e.g. anchor windlass) for off-loading and on-loading of anchors and anchor chain is authorized. Coast Guard personnel will operate all Government equipment.
3.2.1.2 Tumble the anchor chain several times to remove rust, scale, and dirt. Arrange the anchor chains in long fakes, to allow for inspection.
3.2.1.3 Remove the wire turns.
3.2.2 Inspections. Perform the following inspections (submit CIR):
NOTES
1. For the purpose of reference in this item, the shots will be referred to by numbers. Mark each shot with a removable tag. Moving inboard from the anchor, the shots will be referred to as follows: ANCHOR, Shot 1, Shot 2, Shot 3...Shot n-2, Shot n-1, Shot n, and BITTER END. These shot numbers are designated in order as existing prior to work, and will not change - although the shot order itself will change.
2. Number n in the paragraph above is equal to the number of shots per chain.
3.2.2.1 Surface preparation. Prepare the below-listed surfaces to a “Commercial Blast” standard, in accordance with SSPC-SP 6:
• All detachable links (including detachable link interior surfaces), swivels, outboard swivel shots, cats paw, pelican hook and shackles.
• Entire length of Shot 1, Shot 2, Shot n-1, and Shot n.
• 10 links per shot, each 15 links apart, on Shot 3 through Shot n-2 (for the purposes of wire diameter test - see Table I below).
3.2.2.2 Visual. Disassemble all detachable links, shackles, and swivels.
3.2.2.3 Measurement. Determine the suitability for continued service of the anchor chain assembly, by checking wire diameter dimension and six-link dimension ,using information provided in Table I (Dimensions for Condemning Anchor Chain) as guidance, as applicable:
TABLE I. DIMENSIONS FOR CONDEMNING ANCHOR CHAIN
SIZE OF CHAIN
(INCHES)
90 PERCENT OF
LINK DIAMETER(1)
(INCHES)
SIX-LINK
DIMENSION(2)
(INCHES)
1 0.90 26-3/4
1-1/8 1.013 30-1/16 1-1/4 1.125 33-7/16 1-3/8 1.238 36-3/4 1-1/2 1.35 40-1/8 1-5/8 1.463 43-7/16 1-3/4 1.575 46-13/16 1-7/8 1.688 50-1/8
2 1.80 53-1/2 2-1/8 1.913 56-13/16
(1) Use a micrometer, caliper or GO/NO-GO gage* to check wire diameter dimension. Gage is to be made by Contractor/repair facility in accordance with the dimensions shown in Table 1 above. Check the diameters at right angles to the link. When measuring with a micrometer or caliper take one-half the sum of the two diameters as representing the line diameter.
(2) Take six-link measurements with a load applied to the chain in order to take all slack out of the chain. Use a bar gauge to check the six-link dimension. When the gauge will not fit over six links, the chain has been stretched beyond allowable limit. Measure six links for the entire length of each shot, measuring from every third link.
*When using a GO/NO-GO gage, a failed check is to be verified by measuring with a micrometer or caliper. Measure the diameter at right angles and take one-half the sum of the two diameters as representing the link diameter. Take measurements on clean, bare metal.
NOTE
The six-link dimension test is only necessary if the chain jumps the wildcat during raising or lowering under power
3.2.3 Reassembly.
3.2.3.1 Reassemble detachable links, swivels and shackles; and repack with molybdenum disulfide grease (MIL-DTL-23549.
3.2.3.2 Change the relative position of the shots, as designated by the Coast Guard Inspector, to distribute the wear on the chain, ensuring that shot shall be rotated end for end upon reinstallation, as follows:
ANCHOR, Shot 3... Shot n-2, Shot n-1, Shot n, Shot 1, Shot 2, BITTER END.
NOTE
Detachable link components are not interchangeable.
3.2.3.3 Renew all taper pins and lead plugs for the detachable links.
3.2.3.4 Renew all detachable taper pin and link assemblies and associated link plugs.
3.2.3.5 Renew shackle at bitter end of chain.
3.2.4 Chain renewal. If a Change Request has been authorized and released, renew designated section of chain with material conforming to MIL-C-24633.
3.2.5
Touch-up preservation. Prepare and touch-up coat all new and disturbed surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.2.6 Color coating. Using the coating system specified for “Anchor/Anchor Chain” in COMDTINST M10360.3, Appendix A (Cutters and Boats Exterior Painting Systems), do the following:
3.2.6.1 Coat the following shots:
Shot n-1 Black Shot n Black Shot 1 Yellow Shot 2 Red
3.2.6.2 Coat and wire (CRES wire) all detachable links (red, white, and blue), adjacent chain links, shackles, and swivels in accordance with Attached Figure “Painting and Markings On Mooring Chain”, using the , and COMDTINST M10360.3. Remove all existing CRES wire prior to the installation of new markings.
3.2.7 Chain restowing. When directed by the Coast Guard Inspector, reassemble the anchor and anchor chain; restow the anchor chain in its chain locker, free for running, with the anchor properly hawsed and secured with the chain stopper set. Ensure that (1) the bitter ends of the chain are securely fastened in the chain locker with new bitter end shackles, conforming to Fed Spec RR-C-271, Type IV-A, Class 3, Grade A; (2) the ground tackle is kept ready for use, (3) nothing interferes with a readiness to veer or slip the anchors, (4) the detachable links located just inboard of the riding stopper and the detachable link tool set are readily accessible for use in slipping the anchor chains in an emergency, and (5) the anchor has a crown buoy attached, with sufficient length of rope to facilitate indicate the depths of water in which moored. In addition, do the following:
• Lead the bitter ends down and through the deck bolts in the chain locker and secure to the chain locker pad eye.
• Back out the chains to ensure the chain stopper is set properly.
3.3 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the anchor chain assembly to prove satisfactory operating condition, by releasing the chain stoppers and lower both anchors under power to the drydock floor (or waterline, as applicable), letting out one additional shot, and raising again to ensure chains run on the wildcats without binding.
3.3.1 Correct any discrepancies, house the anchors and set the anchor chain pelican hooks.
3.3.2 Submit a CFR.
4. NOTES
4.1 Component characteristics. Each anchor weighs 4,000 pounds and each chain is 1¼-inch Stud Link, with a length of 8 shots All shots of anchor chain include the corresponding detachable link(s).
B
LU
E Se e N ot e
H U
LL
B
L A C
K B
LA
C
K W
H
IT
E
Y
EL
LO
W
R
ED
N O
T E
R ep ea t r ed , w hi te
, b lu e m ar ki ng o f d et ac ha bl e lin ks u nt il ne xt to la s t in bo ar d sh ot
PAINTING AND MARKINGS
ON MOORING CHAIN
C ol or pe r N ot e
R
ED
S e e
N ot e
W H
IT
E
W H
IT
E
S e e
N ot e
D
ET
A C
H A
B
LE
LI
N
K
TY
P
(1
File details come from the government source that posted it. Updated .