Amendment0010(11RP30FG6).doc

DOC document 83 KB Posted

Attached to
J - DRY-DOCKING AND REPAIRS OF THE CGC SYCAMORE
Solicitation number
HSCG85-11-R-P30FG6
Issued by

About this file

Amendment 0010

View the file

Other files

File Type Posted
Amendment0013(11RP30FG6).pdf PDF
Amendment0012(11RP30FG6).pdf PDF
225B-WLB_601_2_3_-_H 1 .dwf DWF file
Amendment0011(11RP30FG6).pdf PDF
225-WLB_531_50_3_-_A 1 .dwf DWF file
225-WLB_531_50_1_-_A 1 .dwf DWF file
225-WLB_531_50_4_-_A 1 .dwf DWF file
225-WLB_531_50_5_-_A 1 .dwf DWF file
225-WLB_531_50_2_-_A 1 .dwf DWF file
Amendment0009(11RP30FG6).pdf PDF
Amendment0008(11RP30FG6).pdf PDF
Amendment0007(11RP30FG6).pdf PDF
Amendment0006(11RP30FG6).pdf PDF
Amendment0005(11RP30FG6).pdf PDF
Amendment0004(11RP30FG6).pdf PDF
Amendment0003(11RP30FG6).pdf PDF
Amendment0002(11RP30FG6).pdf PDF
Work Item 79 Temporary Berthing Provide.pdf PDF
Amendment0001(11RP30FG6).pdf PDF
AttJ.1SycamoreFY11DD_Rprs.pdf PDF
AttJ.2ElectronicSectionB.xls XLS spreadsheet
Solicitation(SchedA-M)(11RP30FG6).doc DOC document
SFLCStdSpec8634.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE
OF PAGES
1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
0010
10 MAY 11
21-11-851P30FG6
6. ISSUED BY
CODE
HSCG85
7. ADMINISTERED BY (If other than Item 6)
CODE

COMMANDER

SURFACE FORCES LOGISTICS CENTER C&P2

1301 CLAY ST. STE 807N

OAKLAND, CA 94612-5217

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code)
(
9.A AMENDMENT OF SOLICITATION NO.

HSCG85-11-R-P30FG6

9B. DATE (SEE ITEM 11)

18 APR 11

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CGC SYCAMORE (WLB 209) FY11 DRYDOCK & REPAIRS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)

)PREVIOUS EDITION UNUSABLE

Prescribed by GSA, FAR (48 CFR) 53.2

1. Response(s) to Request(s) for Clarification 0013, 0017 and 0021 is/are provided as Attachment A.

2. There is no change to the proposal closing date, which remains as follows:

5/13/11 4 p.m. Pacific Time

Submission of Pre-Award Drydock Certification & Calculations (Sec L.9.2).

5/23/11 11 a.m. Pacific Time

Price Proposal & Attachment J.2.

Date:
5/5/11
Question No.
0013

REQUEST FOR CLARIFICATION

SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS

RFP No.:
HSCG85-11-R-P30FG6

SOLICITATION SECTION:

PARA NO.

WORK ITEM NO.
64
PARA NO.
3.2.3
TITLE:
Reverse Osmosis Desalination Plant, Renew

QUESTION:

Item Par. 3.2.3 requires contractor to “Renew the associated pump and filtration device in line with RO unit”. No apparent references were received to facilitate estimating this requirement. Request CG drawing or relevant component information associated with this paragraph, as will be required for procurement, for estimating purposes (manufacturer, model/frame, etc).

RESPONSE:

The following drawings are provided with Amendment 0010:

225-WLB_531_50_1_-_A[1].dwf

225-WLB_531_50_2_-_A[1].dwf

225-WLB_531_50_3_-_A[1].dwf

225-WLB_531_50_4_-_A[1].dwf

225-WLB_531_50_5_-_A[1].dwf

Date:
5/9/11
Question No.
0017
RFP No.:
HSCG85-11-R-P30FG6
SOLICITATION SECTION:
H.2.b
PARA NO.

WORK ITEM NO.

PARA NO.

TITLE:
Composite Labor Rate

Please clarify:

b. The composite labor hour rate shall represent total compensation for the following: direct labor (whether at a straight time, overtime or double time rate); any port or association fees, rents or other levies; all overhead and general and administrative costs; profit; and all direct and indirect costs and profit.

Does this mean that the composite labor rate provided on the bid sheet, multiplied by 3,000 hours will be used to negotiate work performed at any labor rate, or will it be multiplied (1 ½ or twice) to arrive at a labor rate for over time and double time work?

The rate will not be multiplied for premium hours. The Composite Labor Rate, proposed by offerors, will be the single rate used to price all negotiated prime labor on changes, regardless of whether the actual employment of that negotiated labor is in a straight time, overtime or double-time scenario.

SFLC asks offerors to consult their project records and utilize their business judgment and experience in the ship repair field to determine a reasonable proposed rate in light of the above clarification.

Date:
5/10/2011
Question No.
0021
RFP No.:
HSCG85-11-R-P30FG6

SOLICITATION SECTION:

PARA NO.

WORK ITEM NO.
27
PARA NO.
TITLE:
U/W Body Preserve 100%

Is SYCAMORE coated with INERTA 160 or other abrasion/impact resistant anti-corrosive?

If so, to what extent? Presence of impact resistant AC affects removal rates of existing paint system by UHP waterjetting

SYCAMORE's existing system is the regular MIL-PRF-24647 anti-corrosive and Antifouling system.

File details come from the government source that posted it. Updated .