Amendment0010(11RP30FG6).doc
DOC document 83 KB Posted
- Attached to
- J - DRY-DOCKING AND REPAIRS OF THE CGC SYCAMORE
- Solicitation number
- HSCG85-11-R-P30FG6
About this file
Amendment 0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0013(11RP30FG6).pdf | ||
| Amendment0012(11RP30FG6).pdf | ||
| 225B-WLB_601_2_3_-_H 1 .dwf | DWF file | |
| Amendment0011(11RP30FG6).pdf | ||
| 225-WLB_531_50_3_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_1_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_4_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_5_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_2_-_A 1 .dwf | DWF file | |
| Amendment0009(11RP30FG6).pdf | ||
| Amendment0008(11RP30FG6).pdf | ||
| Amendment0007(11RP30FG6).pdf | ||
| Amendment0006(11RP30FG6).pdf | ||
| Amendment0005(11RP30FG6).pdf | ||
| Amendment0004(11RP30FG6).pdf | ||
| Amendment0003(11RP30FG6).pdf | ||
| Amendment0002(11RP30FG6).pdf | ||
| Work Item 79 Temporary Berthing Provide.pdf | ||
| Amendment0001(11RP30FG6).pdf | ||
| AttJ.1SycamoreFY11DD_Rprs.pdf | ||
| AttJ.2ElectronicSectionB.xls | XLS spreadsheet | |
| Solicitation(SchedA-M)(11RP30FG6).doc | DOC document | |
| SFLCStdSpec8634.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE |
| OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 0010 |
| 10 MAY 11 |
| 21-11-851P30FG6 |
| 6. ISSUED BY |
| CODE |
| HSCG85 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
HSCG85-11-R-P30FG6
9B. DATE (SEE ITEM 11)
18 APR 11
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| ( |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CGC SYCAMORE (WLB 209) FY11 DRYDOCK & REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.2
1. Response(s) to Request(s) for Clarification 0013, 0017 and 0021 is/are provided as Attachment A.
2. There is no change to the proposal closing date, which remains as follows:
5/13/11 4 p.m. Pacific Time
Submission of Pre-Award Drydock Certification & Calculations (Sec L.9.2).
5/23/11 11 a.m. Pacific Time
Price Proposal & Attachment J.2.
| Date: |
| 5/5/11 |
| Question No. |
| 0013 |
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS
| RFP No.: |
| HSCG85-11-R-P30FG6 |
SOLICITATION SECTION:
PARA NO.
| WORK ITEM NO. |
| 64 |
| PARA NO. |
| 3.2.3 |
| TITLE: |
| Reverse Osmosis Desalination Plant, Renew |
QUESTION:
Item Par. 3.2.3 requires contractor to “Renew the associated pump and filtration device in line with RO unit”. No apparent references were received to facilitate estimating this requirement. Request CG drawing or relevant component information associated with this paragraph, as will be required for procurement, for estimating purposes (manufacturer, model/frame, etc).
RESPONSE:
The following drawings are provided with Amendment 0010:
225-WLB_531_50_1_-_A[1].dwf
225-WLB_531_50_2_-_A[1].dwf
225-WLB_531_50_3_-_A[1].dwf
225-WLB_531_50_4_-_A[1].dwf
225-WLB_531_50_5_-_A[1].dwf
| Date: |
| 5/9/11 |
| Question No. |
| 0017 |
| RFP No.: |
| HSCG85-11-R-P30FG6 |
| SOLICITATION SECTION: |
| H.2.b |
| PARA NO. |
WORK ITEM NO.
PARA NO.
| TITLE: |
| Composite Labor Rate |
Please clarify:
b. The composite labor hour rate shall represent total compensation for the following: direct labor (whether at a straight time, overtime or double time rate); any port or association fees, rents or other levies; all overhead and general and administrative costs; profit; and all direct and indirect costs and profit.
Does this mean that the composite labor rate provided on the bid sheet, multiplied by 3,000 hours will be used to negotiate work performed at any labor rate, or will it be multiplied (1 ½ or twice) to arrive at a labor rate for over time and double time work?
The rate will not be multiplied for premium hours. The Composite Labor Rate, proposed by offerors, will be the single rate used to price all negotiated prime labor on changes, regardless of whether the actual employment of that negotiated labor is in a straight time, overtime or double-time scenario.
SFLC asks offerors to consult their project records and utilize their business judgment and experience in the ship repair field to determine a reasonable proposed rate in light of the above clarification.
| Date: |
| 5/10/2011 |
| Question No. |
| 0021 |
| RFP No.: |
| HSCG85-11-R-P30FG6 |
SOLICITATION SECTION:
PARA NO.
| WORK ITEM NO. |
| 27 |
| PARA NO. |
| TITLE: |
| U/W Body Preserve 100% |
Is SYCAMORE coated with INERTA 160 or other abrasion/impact resistant anti-corrosive?
If so, to what extent? Presence of impact resistant AC affects removal rates of existing paint system by UHP waterjetting
SYCAMORE's existing system is the regular MIL-PRF-24647 anti-corrosive and Antifouling system.
File details come from the government source that posted it. Updated .