Amendment0006(11RP30FG6).pdf
PDF 70 KB Posted
- Attached to
- J - DRY-DOCKING AND REPAIRS OF THE CGC SYCAMORE
- Solicitation number
- HSCG85-11-R-P30FG6
About this file
Amendment 0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0013(11RP30FG6).pdf | ||
| Amendment0012(11RP30FG6).pdf | ||
| 225B-WLB_601_2_3_-_H 1 .dwf | DWF file | |
| Amendment0011(11RP30FG6).pdf | ||
| 225-WLB_531_50_3_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_1_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_4_-_A 1 .dwf | DWF file | |
| 225-WLB_531_50_5_-_A 1 .dwf | DWF file | |
| Amendment0010(11RP30FG6).doc | DOC document | |
| 225-WLB_531_50_2_-_A 1 .dwf | DWF file | |
| Amendment0009(11RP30FG6).pdf | ||
| Amendment0008(11RP30FG6).pdf | ||
| Amendment0007(11RP30FG6).pdf | ||
| Amendment0005(11RP30FG6).pdf | ||
| Amendment0004(11RP30FG6).pdf | ||
| Amendment0003(11RP30FG6).pdf | ||
| Amendment0002(11RP30FG6).pdf | ||
| Work Item 79 Temporary Berthing Provide.pdf | ||
| Amendment0001(11RP30FG6).pdf | ||
| AttJ.1SycamoreFY11DD_Rprs.pdf | ||
| AttJ.2ElectronicSectionB.xls | XLS spreadsheet | |
| Solicitation(SchedA-M)(11RP30FG6).doc | DOC document | |
| SFLCStdSpec8634.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0006 28 APR 11 21-11-851P30FG6
6. ISSUED BY CODE DTCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-11-R-P30FG6
9B. DATE (SEE ITEM 11)
18 APR 11
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CGC SYCAMORE (WLB 209) FY11 DRYDOCK & REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
HSCG85-11-R-P30FG6 Amendment 0006
1. Response(s) to Request(s) for Clarification 0005 and 0006 is/are provided as Attachment A.
2. Add the following paragraph to Work Item 79 “Temporary Berthing, Provide”:
“3.1.3 Berthing facility shall be within a radius of no greater than 5 road miles from the contractor’s drydocking facility.”
3. In SFLC Standard Spec 8635, para 3.3.4, append the following text to the final bullet ending “…on a daily basis.”:
The contractor shall provide fresh linens and laundry service to ensure newly washed linens are available daily for duty section personnel. Duty section personnel will be responsible for making of beds and placing used linens in a contractor-provided collection bin.”
4. There is no change to the proposal closing date, which remains as follows:
5/13/11 4 p.m. Pacific Time Submission of Pre-Award Drydock Certification & Calculations (Sec L.9.2).
5/23/11 11 a.m. Pacific Time Price Proposal & Attachment J.2.
ATTACHMENT A
Date: 4/27/11
Question No. 0005
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS
RFP No.: HSCG85-11-R-P30FG6
SOLICITATION SECTION:
GENERAL
REQUIREMENTS PARA NO. 3.8.1
WORK ITEM NO. & WORK ITEM 79 PARA NO.
TITLE: TEMPORARY BERTHING
QUESTION:
Para. 3.8.1 of the General Requirements appears to be in conflict with Work Item 79 (Temporary Berthing, Provide). The General Requirements states that the Government will provide 3 weeks of accommodations while habitability work is occurring, and following award, the contractor is to propose when those 3 weeks would be scheduled. Work Item 79, as well as the clarification response in Amendment 0003, requires the contractor to provide accommodations while this work is occurring.
Please clarify.
RESPONSE:
The instructions to offerors in Amendment 0003 were incomplete. The Government will not provide hotel accommodations for ship’s crew; all such accommodations will be provided by the contractor.
Make the following revisions to the General Requirements:
Paragraph 3.8, delete final sentence “The following requirements…of these systems:”
Paragraph 3.8.1, delete entire paragraph Paragraph 3.8.2, delete entire paragraph
ATTACHMENT A
Date: 4/27/11
Question No. 0006
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC SYCAMORE (WLB 209) FY11 DRYDOCK REPAIRS
RFP No.: HSCG85-11-R-P30FG6
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. #35, ¶3.2.8 & #36, ¶3.2.8 PARA NO.
TITLE: Strain Gage Alignment
QUESTION:
Both referenced paragraphs require that the vessel’s shafting alignment be inspected in a cold condition prior to arrival at the contractor’s facility.
Is this an error? Is the intent to inspect alignment prior to drydocking? If not, please provide date, time, estimated load condition and location the vessel will be available for this inspection so the contractor can estimate the appropriate travel costs.
RESPONSE:
Item 35, Paragraph 3.2.8, delete: “This shall be accomplished prior to the cutter arrival at the Contractor‟s facility.”
and substitute: “This shall be accomplished prior to drydocking.”
Item 36, Paragraph 3.2.8, delete: “This shall be accomplished prior to the cutter arrival at the Contractor‟s facility.”
and substitute: “This shall be accomplished prior to drydocking.”
File details come from the government source that posted it. Updated .