Govt Property Rpt

32 KB Posted

Attached to
Drydock Repairs for the USCGC SPAR
Solicitation number
HSCG85-11-Q-P45002
Issued by

About this file

Government Property Report (form)

Text of this file

GOVERNMENT PROPERTY REPORT

The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.

CONTRACT NUMBER:

VESSEL:

CONTRACTOR POINT OF CONTACT:

TELEPHONE NUMBER:

CONTRACTOR’S ADDRESS:

The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.

1 2 3 4 5 6

TYPE OF PROPERTY RECEIVED (INCLUDE NAME,

DESCRIPTION , NSN AND SERIAL #)

VALUE OF

PROPERTY

DATE

RECEIVED

INSTALLED/

CONSUMED

USE THIS BLOCK TO RECORD :

1. CURRENT LOCATION OF PROPERTY IN THE POSSESSION OF THE CONTRACTOR FOR USE

DURING THE AVAILABILITY OR OTHERWISE BEING TEMPORARILY HELD UNTIL BEING

RETURNED TO/REINSTALLED ON CUTTER.

2. DISPOSITION INSTRUCTIONS FOR UNUSED, SERVICEABLE, SALVAGE OR SCRAP PROPERTY.

STATE WHICH APPLY.

DISPOSITION

CARRIED OUT

DESCRIPTION NSN\SERIAL\P/

N

* Definitions (all property defined below will require disposition instructions):

Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.

Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.

Scrap – defined as property having no value except for it basic material content.

The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.

PROPERTY ADMINISTRATOR DATE

(Sign at time disposition instructions are given)

CONTRACTOR SIGNATURE DATE

(sign after execution of disposition instructions)

NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)

Type of property received (include name, description , nsn and serial #)
date
description
nsn\serial\p/n

Other files

File Type Posted
Amendment0009(11RP45002).pdf PDF
Amendment0008(11RP45002).pdf PDF
Amendment0007(11RP45002).pdf PDF
Amendment0006(11RP45002).pdf PDF
DWG 225-WLB_184_1_1_-_B.zip ZIP file
Amendment0005(11RP45002).pdf PDF
225B-WLB_256_3_(11RP45002).zip ZIP file
Amendment0004(11RP45002).pdf PDF
Amendment0003(11RP45002).pdf PDF
225-WLB_635_1_1_-_J.pdf PDF
Amendment0002(11RP45002).pdf PDF
SPAR DD12 Q004 WI 74 Drawing Refs.zip ZIP file
WORK ITEM 74 Rev1 Hydraulic Steering Cooler Install.pdf PDF
Amendment0001(11RP45002).pdf PDF
AttJ.3Clarification_Form(11RP45002).doc DOC document
Solicitation(SchedA-M)(11RP45002).doc DOC document
AttJ.1SparFY12DD_Rprs.pdf PDF
AttJ.2ElectronicSectionB(11RP45002).xls XLS spreadsheet
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .