AttJ.1SparFY12DD_Rprs.pdf

PDF 3 MB Posted

Attached to
Drydock Repairs for the USCGC SPAR
Solicitation number
HSCG85-11-Q-P45002
Issued by

About this file

Att J.1 Specification

View the file

Other files

File Type Posted
Amendment0009(11RP45002).pdf PDF
Amendment0008(11RP45002).pdf PDF
Amendment0007(11RP45002).pdf PDF
Amendment0006(11RP45002).pdf PDF
DWG 225-WLB_184_1_1_-_B.zip ZIP file
Amendment0005(11RP45002).pdf PDF
225B-WLB_256_3_(11RP45002).zip ZIP file
Amendment0004(11RP45002).pdf PDF
Govt Property Rpt —
Amendment0003(11RP45002).pdf PDF
225-WLB_635_1_1_-_J.pdf PDF
Amendment0002(11RP45002).pdf PDF
SPAR DD12 Q004 WI 74 Drawing Refs.zip ZIP file
WORK ITEM 74 Rev1 Hydraulic Steering Cooler Install.pdf PDF
Amendment0001(11RP45002).pdf PDF
AttJ.3Clarification_Form(11RP45002).doc DOC document
Solicitation(SchedA-M)(11RP45002).doc DOC document
AttJ.2ElectronicSectionB(11RP45002).xls XLS spreadsheet
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SPAR (WLB 206)

225 FOOT "B CLASS" SEAGOING BUOY TENDER

SPECIFICATION FOR DRYDOCK REPAIRS

Developed By: CWO Ken Miller

(Rev-0, 26Aug 2011)

USCGC SPAR (WLB-225B) DRYDOCK AVAILABILITY 2012

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ....................................................................................................................................... iv Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property .............................................................................. xii Consolidated List of Critical Inspection Items ......................................................................................... xv Principal Characteristics .......................................................................................................................... xvi

General Requirements WORK ITEM 1: Hull Plating, U/W Body, Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing

WORK ITEM 3: Appendages (U/W), Leak Test WORK ITEM 4: Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair WORK ITEM 5: Appendages (U/W) - Internal, Preserve

WORK ITEM 6: Chain Lockers, Clean WORK ITEM 7: Tanks (MP Fuel Service), Clean WORK ITEM 8: Voids (Non-Accessible), Leak Test

WORK ITEM 9: Chain Lockers, Inspect

WORK ITEM 10: Tanks (MP Fuel Service), Inspect WORK ITEM 11: Voids (Non-Accessible), Preserve Internal Surfaces WORK ITEM 12: Cargo Hatch, Overhaul and Repair

WORK ITEM 13: Propulsion Shafting Remove, Inspect, and Reinstall WORK ITEM 14: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal

WORK ITEM 15: Strain Gage Alignment, Check WORK ITEM 16: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 17: Propulsion Tail Shaft Sleeve, Skim Cut

WORK ITEM 18: Propulsion Shaft Bearing, Stave Renewal WORK ITEM 19: Controllable Pitch Propeller, System Maintenance

WORK ITEM 20: Controllable Pitch Propeller, Hub General Maintenance

WORK ITEM 21: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 22: Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean WORK ITEM 23: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 24: Fathometer Transducer, Renew WORK ITEM 25: Doppler Speed Log Transducer (s), Renew WORK ITEM 26: Fwd Scan Sonar Transducer, General Maintenance

WORK ITEM 27: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 28: Sea Bay, Inspect WORK ITEM 29: Sea Bay, Preserve - Partial WORK ITEM 30: Sea Bay, Preserve 100%

WORK ITEM 31: Fixed CO2 FF Bottles, Inspect and Hydrostatic Test WORK ITEM 32: Rudder Stock Bearings, Check Clearances WORK ITEM 33: Rudder, Inspect and Repair

WORK ITEM 34: Rudder and Rudder Stock, Removal and Inspection WORK ITEM 35: Thruster Unit‟s (General), Overhaul iii (Rev-0)

WORK ITEM 36: Hydraulic Chain Stoppers, Overhaul WORK ITEM 37: Pad Eyes, Inspect and Test WORK ITEM 38: Crossdeck Winches, Overhaul WORK ITEM 39: Hydraulic Inhaul Winch, Overhaul

WORK ITEM 40: Mechanical Chain Stoppers, Overhaul WORK ITEM 41: Anchor Windlass, Overhaul ( Level 2 ) WORK ITEM 42: Anchor Chain (s) and Ground Tackle, Inspect and Repair WORK ITEM 43: Warping Capstan, Level 2 Inspect and Repair WORK ITEM 44: Buoy Cargo Hold Deck, Preserve 100%

WORK ITEM 45: Chain Locker, Preserve 100%

WORK ITEM 46: Chain Locker, Preserve Partial

WORK ITEM 47: Decks - Exterior( Buoy ), Preserve WORK ITEM 48: Decks - Exterior, Preserve ( “ Non-Skid Broadcast Grit” System) WORK ITEM 49: U/W Body, Preserve “100%” WORK ITEM 50: Stern Tube Interior Surfaces, Preserve 100%

WORK ITEM 51: Hull Plating Freeboard, Preserve “ 100% ” WORK ITEM 52: Cathodic Protection / Zincs, Renew

WORK ITEM 53: Impressed Current Cathodic Protection System Anodes, Renew WORK ITEM 54: Impressed Current Cathodic Protection System Reference Cells, Renew WORK ITEM 55: Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew

WORK ITEM 56: Drydocking WORK ITEM 57: Temporary Services, Provide WORK ITEM 58: Temporary Messing and Berthing, Provide

WORK ITEM 59: Sea Trial Performance, Provide Support WORK ITEM 60: Buoy Chain (In-Haul ) Winch, Modify

WORK ITEM 61: Buoy Crane Swing Drive Brake Assemblies, Modify WORK ITEM 62: Air Conditioning Condenser Seawater Cooling Overboard Discharge Piping, Modify

WORK ITEM 63: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 64: Firemain Valves, Overhaul Or Renew

WORK ITEM 65: Auxiliary Sea Water System Valves, Overhaul Or Renew WORK ITEM 66: Bilges (Machinery Space), Preserve WORK ITEM 67: ATON Shop Deck, Preserve WORK ITEM 68: ATON Storeroom Deck, Preserve

WORK ITEM 69: Hawse Pipe, Renew WORK ITEM 70: Boat Boom, Inspect and Repair WORK ITEM 71: Single Point Davit, Inspect and Repair WORK ITEM 72: Buoy Crane, Inspect and Repair WORK ITEM 73: Transom Bulkhead Repair

WORK ITEM 74: Hydraulic Steering Cooler, Install iv (Rev-0)

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

American Welding Society (AWS): http://www.awspubs.com/index.php

ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

NFPA: http://www.nfpa.org

SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 225 WLB 184-001, Rev B, CRP-V850 Transducer Adaptor Ring

Coast Guard Drawing 225 WLB 549-001, Rev D, Onboard Lubrication Requirements

Coast Guard Drawing 225 WLB 573-011, Rev -, ATON Tie Downs

Coast Guard Drawing 225 WLB 573-202, Rev -, Buoy Chain Winch, Model CW1

Coast Guard Drawing 225 WLB 581-001, Rev E, Anchor Handling System Arrangement

Coast Guard Drawing 225 WLB 601-001, Rev G; General Arrang e ment Inboard and Outboard Profiles

Coast Guard Drawing 225 WLB 601-001, Rev M; General Arrangement Inboard & Outboard Profiles

Coast Guard Drawing 225 WLBB 601-002, Rev G Booklet of General Drawings

Coast Guard Drawing 225B W LB 424 -001, Rev C , Acoustic Navigation System Block & Isometric

Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion

Coast Guard Drawing 225B WLB 111-001, Rev A; Shell Expansion

Coast Guard Drawing 225B WLB 114-001, Rev C; Shell Appendages

Coast Guard Drawing 225B WLB 243-001, Rev C, Propulsion Shaft Arrangement

Coast Guard Drawing 225B WLB 243-001, Rev C, Propulsion Shafting Arrangement

Coast Guard Drawing 225B WLB 243-002, Rev E, Stern Tube and Bearings A&D

Coast Guard Drawing 225B WLB 256-001, Rev M, Seawater Cooling System Diagram

Coast Guard Drawing 225B WLB 256-1, Rev M, Seawater System Cooling Diagram

Coast Guard Drawing 225B WLB 256-4, Rev F, SW Cooling System FR 66 Aft Block 940, 950 & 970

Coast Guard Drawing 225B WLB 256-5, Rev -, Mods to Seawater Cooling Ovbd - A/C Condensers

Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram

Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940

Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A&D Hull Blocks 970 & http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-0)

Coast Guard Drawing 225B WLB 505-1, Rev D, General Requirements for Piping Systems

Coast Guard Drawing 225B WLB 508-1, Rev A, Thermal Insulation for Mchry, Equipment and Piping

Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram

Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements

Coast Guard Drawing 225B WLB 555-005, Rev D, CO2 System A/D, Fr 48 Aft, Block 930, 940, 950, 960A

Coast Guard Drawing 225B WLB 555-006, Rev A, CO2 System, A/D, Flammable Liquid Storeroom, Blk 901, Coast Guard Drawing 225B WLB 555-007, Rev B, CO2 System, A/D, Emergency Generator Rm, Block 970

Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram

Coast Guard Drawing 225B WLB 562-002, Rev C; Rudder Structural A & D

Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement

Coast Guard Drawing 225B WLB 573-011, Rev -, ATON Tie Downs

Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement

Coast Guard Drawing 225B WLB 601-002 Rev H, Booklet of General Drawings

Coast Guard Drawing 225B WLB 601-002, Rev G, Booklet of General Drawings

Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block Diagram, Wiring Deck Plan, and Elementary Diagrams

Coast Guard Drawing 225B WLB 633-002, Rev A; Cathodic protection passive

Coast Guard Drawing 225B WLB 801-006, Rev C; Docking Drawing

Coast Guard Drawing 225B WLB 801-006, Rev D, Docking Drawing

Coast Guard Drawing 225B WLB 801-006, Rev D; Docking Drawing

Coast Guard Drawing 225B WLB 801-6, Rev C, Docking Drawing

Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages

Coast Guard Drawing 225B WLB 114-002, Rev -, Flow Accelerating Fin

Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank

Coast Guard Drawing 225B WLB 568-001, Rev A, Bow Thruster A & D

Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement

Coast Guard Drawing 225B WLB 801-006, Rev D, Docking Drawing

Coast Guard Drawing 225B-WLB 561-003, Rev A; STEERING GEAR ARRANGEMENT

Coast Guard Drawing 225B-WLB 562-001, Rev B; STEERING COMPONENTS A/D

Coast Guard Drawing 225B-WLB 562-002, Rev C; RUDDER - STRUCT A & D

Coast Guard Drawing 225B-WLB 601 00 2 , Rev H, Booklet Of General Drawings

Coast Guard Drawing 225B-WLB 233-1, Rev C, Propulsion Train Installation Drawing

Coast Guard Drawing 225B-WLB 243-1, Rev C, Propulsion Shafting Arrangement

Coast Guard Drawing 225B-WLB 243-2, Rev E, Stern Tube and Bearing a & D

Coast Guard Drawing 225B-WLB 243-2, Rev E; Stern Tube and Bearing a & D

Coast Guard Drawing 225B-WLB 243-2, Rev E; Stern Tube and Bearing A & D

Coast Guard Drawing 225B-WLB 556-8, Rev C, CPP Hydraulic System Diagram

Coast Guard Drawing 225B-WLB 562-2, Rev C, Rudder Structural a & D

Coast Guard Drawing 225B-WLB 562-3, Rev -; Thordon Lower Rudder Stock Bearing

Coast Guard Drawing 225B-WLB 562-4, Rev -; Pintle Bearing

Coast Guard Drawing 225B-WLB 611-1, Rev D, Lifting Pads - Main and Aux Machinery Room

Coast Guard Drawing 225-WLB 243-203, Rev E, Stern Tube Split Dovetail Carrier Casting

Coast Guard Drawing 225-WLB 611-4, Rev J; Lifting Pads Outside Machinery Spaces

Coast Guard Drawing 225-WLB 631-2, Rev -, Painting Schedule, Hulls 202-205

Coast Guard Drawing 225-WLB 901-3, Rev -, Hull Block 901 Block Assembly

Coast Guard Drawing 225-WLB 244-203, Rev -, Stern Tube Split Dovetail Carrier Casting

Coast Guard Drawing FL 1204-3, Rev A; Welded Padeyes & Links

Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Cha

Coast Guard Drawing FL 2605-034, Rev C, Mechanical Chain Stopper Repair K it: 1-7/8", 1-5/8" & 1-1/4" vii (Rev-0)

Coast Guard Drawing FL 2804-13, Rev G, Visual I D Kit Sched

Coast Guard Drawing FL 2804-15, Rev-, Draft Figs

Coast Guard Drawing FL 4823-60, Rev G, Cast Steel Waster Pieces

Coast Guard Drawing FL-2605-013, Rev-, Buoy Chain Model CW1: Pins

Coast Guard Drawing FL-2605-035, Rev-, Buoy Chain Winch Pedestal Bearing Modification

Coast Guard Drawing FL-7101-573, Rev J, Buoy Chain Winch, Model CW1

Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual I D Numeral & Letter for Ships

Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL-2605-29, Rev B, Retractable Roller Assembly

Coast Guard Fleet Drawing FL-2605-30, Rev B, Chain Stopper Plate

NAVSEA Drawing 803-1385866, Rev Rev E; Penetrations; Bulkhead and Deck

NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes

NAVSEA Drawing 804-1385781, Rev E; Pipe Hangers for Surface Ships (Superseding Navsea Drawing .

810-1385781)

NAVSEA Drawing 810-1385880, Rev Rev D; Fittings, Cu-Ni Alloy, Slip on Sleeve

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series) , Coatings and Color Manual

Coast Guard Commandant Instruction (COMDTINST) M10360.3, (Series), Coatings and Colors Manual

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color

Manual

Coast Guard Commandant Instruction (COMDTINST) M10360.3, (Series), Coatings and Colors Manual

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Te chnical Publication (TP) 3717, Jun 2003 , Hydraulic Cargo Hatch

Coast Guard Technical Publication (TP) 3498, Section A, Feb 200 8 , Buoy Chain Winch

Coast Guard Technical Publication (TP) 3498, Section A, Feb 2008, Buoy Chain Winch

Coast Guard Technical Publication (TP) 3523, APR 2002, SWBS 241-A, Reduction Gear - Model

96DHCMG-Cp

Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01

Coast Guard Technical Publication (TP) 3523-242-A-C, 225 WLB MIB, SWBS 242, Coupling, Torsional, MMC PN 242-01-01 & 242-01-02

Coast Guard Technical Publication (TP) 3524, 07-JAN-97, Manufacturer's Instruction Book-SWBS Group(s)

243-262

Coast Guard Technical Publication (TP) 3524, Jan 1997, Manufacturer's Instruction Book-SWBS Group(s)

243-262

Coast Guard Technical Publication (TP) 3524-244-A, 225 WLM MIB, SWBS 244-A, Bearing, Line Shaft, MMC PN 244-01-03, TP 244-A

Coast Guard Technical Publication (TP) 3524-245-A&B, 225 WLB, SWBS 245-A & 245-B, Propeller

System, CPP, MMC PN 245-01-01,, 0

Coast Guard Technical Publication (TP) 3554, MAY 1996, Manufacturer's Instruction Book, SWBS 556

Coast Guard Technical Publication (TP) 3556, Jun 2009, Manufacturer’s Instruction Book-SWBS Group(s)

568, Bow and Stern Thruster – Model 125/3 STAY/FP

Coast Guard Technical Publication (TP) 3557, Section 573-C, Jul 2005, Manufacturer's Instruction Book-

SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (225B-Class)

Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s)

573, Section A, Cross Deck Winch – Model BMD-390

Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s)

573, Section B, Cross Deck Winch – Model BMD-471

Coast Guard Technical Publication (TP) 3559, JAN 1997, Manufacturer's Instruction Book - SWBS Group(s) viii (Rev-0)

573-582

Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-475

Coast Guard Technical Publication (TP) 3562, Aug 1998, Section a, Manufacturer's Instruction Book SWBS

Groups 583-589, RHIB Handling Davit P/S - Model RAD30-15.5

Coast Guard Technical Publication (TP) 3574, Mar 2009, Volume 1 of 1, SWBS Group 633-638, 225 FT

Juniper Class Seagoing Buoy Tender

Coast Guard Technical Publication (TP) 3762, 15-OCT-04, Daul Point Davit - ATON Workboat - Model

TWPIV5-0A

Coast Guard Technical Publication (TP) E-424-006, Version WLB97-1, Wesmar 3060-08/M-8/AC Forward

Scan Sonar

COMDTINST M10360.3 (series) , Coatings and Colors Manual

COMDTINST M10360.3, Coatings and Colors Manual, Revision C

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General

Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009; General

Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied

Processes

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0850, Jun 2009, General

Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And

Test Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000 ), Jan 2009, General

Requirements

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

Surface Forces Logistics Center Standard Specification 0000 (Std Spec 0000), Jan 2009, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std 0740), Jan 2009, Welding and Allied

Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740 ), Jan 2009, Welding and

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740 ), Jan 2009, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), Jan 2009, Shipboard

Electrical, Cable Removal, Relocation, Splice, Repair and Installation

Surface Forces Logistics Center Standard Specification 5 000 (SFLC Std Spec 5000 ), Jan 2009, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide

Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary

Hull Accesses

Surface Forces Logistics Command (SFLC) Naval Engineering Directive (NED) 5735-01, Inspection and Test

Procedure For Buoy Chain Winch Model CW-1 Onboard WLM 551-564 and WLB 201-215, May 2010

Technical Publication 7610-01-GF5-8501, Apr 1995, AN/SRD-421 Sperry Doppler Speed Log

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power ix (Rev-0)

Tool Cleaning

OTHER REFERENCES

A S TM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An)

AAA/CAA - http://www.aaan e wsroom.net/Main.asp?CategoryID=9&SubCategoryID=22&

American Society for Testing and Materials (ASTM) A105/A105M, 2005; Standard Specification for Carbon

Steel Forgings for Piping Applications

American Society for Testing and Materials (ASTM) A106/A106M, 2006a; Standard Specification for

Seamless Carbon Steel Pipe for High-Temperature Service

American Society for Testing and Materials (ASTM) A181/A181M, 2006; Standard Specification for Carbon

Steel Forgings, For General-Purpose Piping

American Society for Testing and Materials (ASTM) A27/A27M, 2005; Standard Specification for Steel

Castings, Carbon, For General Application

American Society for Testing and Materials (ASTM) A36/A36M, 2005; Standard Specification for Carbon

Structural Steel

American Society for Testing and Materials (ASTM) A519, 2006; Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing

American Society for Testing and Materials (ASTM) B151/B151M, 2005; Standard Specification for Copper-

Nickel-Zinc Alloy (Nickel Silver) And Copper-Nickel Rod and Bar

American Society for Testing and Materials (ASTM) B171/B171M, 2004; Standard Specification for Copper-

Alloy Plate and Sheet for Pressure Vessels, Condensers, And Heat Exchangers

American Society for Testing and Materials (ASTM) F683, 2003a; Standard Practice for Selection and

Application of Thermal Insulation for Piping and Machinery

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding

End

American Society of Mechanical Engineers (ASME) B16.5, Rev 2003, 12/1/2003; Pipe Flanges & Flanged

Fittings: Nps 1/2 Through Nps 24

ASTM International (AS T M) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An)

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel

ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component

Adhesives (An)

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters

Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency

Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-

Petrolatum

Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting

Commercial Item Descriptions (CID) A-A-59323, Rev A; Cloths, Cleaning, Low-Lint

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless

Federal Specification HH-P-151, Rev F, Not 1; Packing, Rubber Sheet, Cloth Insert x (Rev-0)

FL 1204-3. Rev -; WLEDED PADEYES AND LINKS

FORBES (formerly MOBIL) Travel Guide - http://www.forbestravelguide.com/

Hotel and Motel Fire Safety Act of 1990 (PL101-391)

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball

Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze

Gate, Globe, Angle and Check Valves

MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application

MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

MIL-A-22262, Mar 1 9 96; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-C-24633 , Apr 1998 , Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-DTL-15024, Rev Rev F, 11/28/1997; Plates, Tags and Bands for Identification of Equipment

MIL-DTL-23549, Feb 2007 , Grease, General Purpose

MIL-G-24696, Rev B, Amd 1; Gasket, Sheet, Non-Asbestos

MIL-PRF-1149, Rev Rev D, 6/10/1998; Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull

MIL-S-22473 , Rev E(8); Sealing, Locking, and Retaining Compounds: (Single Component), 11/18/1993

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-STD-1627, Rev Rev C, 9/30/1994; Bending of Pipe or Tube for Ship Piping Systems

MIL-T-16420, Rev Rev K, Amd 1, 9/16/1988; Tube, Copper-Nickel Alloy, Seamless and Welded (Copper

Alloy Numbers 715 and 706)

Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-011, Surface Ships Main Propulsion Shafting

Refurbishment Procedures, Volume I, Part 1

Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-012, Surface Ships Main Propulsion Shafting

Examination, Test and Repair Action Record, Volume 1, Part 2

Naval Sea Systems Command (NAVSEA) T9074-AS-GIB-010/271, Apr 1997, Requirements for

Nondestructive Testing Methods

NAVSEA Dwg 803-2145807, Propulsion Shafting & Components

NAVSEA Dwg 803-5001104, Rev -; Rudder Stock Bearings and Seals

ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and

Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug

Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation St a ndard

SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces

Prepared by Dry Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages xi (Rev-0)

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard

SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard

SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard

SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and

Ultrahigh Pressure Water Jetting

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard

SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and

Ultrahigh Pressure Water Jetting

The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE

No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard

SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)-SP 3, Power Tool Cleaning, 11-1-1982

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Rev -; Near-White Blast Cleaning xii (Rev-0)

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

13 Y **Propeller shaft NSN: 2010-01-399-5912 1 ea. 165,000

14 N 225' WLB Major

Overhaul Kit

01-520-5284 1 ea. 35,249.00

14 N **225' WLB Seat

(Split)

John Crane (Wartsila), H72579-

01-7

1 ea. 12,500.00

14 Y Seal Compression

Tool

Onboard Tool 1 ea. 200.00

19 N Stat-O-Seal Washers NSN: 5310-01-212-5987

PN: 0-4-3-5

12 ea. 55.61

19 N O-Ring, Hub Flange

Bolt Cover

NSN: 5331-00-983-9878

PN: 0-2-2-5

12 ea. 50.00

20 N **Blade Bolts NSN: 5306-01-410-6893 4 ea. 1,854.12

20 N Blade Bolt O-rings NSN: 5330-01-408-7251

(0-3-2-11)

48 ea. 2.25

20 N Blade Seal NSN: 5330-01-409-1058

(0-4-4-22)

4 ea. 55.00

20 Y *Lifting Device, Propeller Blade

NSN: 2020-01-F02-6825 1 ea. 100.00

24 N *** Fathometer

Transducer, Shallow

Water, 50-200 kHz

NSN: 5845-01-470-2500 1 ea. 148.92

24 N ***Fathometer

Transducer, Deep

Water, 24kHZ

PN: TH24-20SAW-RA 1 ea. 11,250.00

25 Y ***AN/SRD 500

Sperry Doppler Speed

Log

NSN: 5999-01-472-7499 1 ea. 12,936.00

N Rudder Seal Kit 5330-01-565-8083 1 ea. 2,000

N **Upper bearing NSN: 3110-01-466-9924 1 ea. 5,002.41

35 N Seal 5330-01-495-3435 2x 5 ea. 237.60

36 N Overhaul Kit

(for Para. 3.1, Tasks

#2 and #3)

NSN: 2040-01-496-9418 2 ea. 1,000.00

N Roller bearing Unit

(for Para. 3.2.1, Task

#4)

NSN:3130-01-504-4363 2 ea. 4,012.00 xiii (Rev-0)

N

Grease seal

(for Para. 3.2.1, Task

#5)

NSN:5330-01-462-5544 4 ea. 79.25

N

Level wind pivot bushing

(for Para. 3.2, Task

#6)

PN:7101-573-1 PC-17

(Marinette Marine)

1 ea. 392.00

N

Level wind thrust bearing

(for Para. 3.2.1, Task

#6)

PN:7101-573-1 PC-16

(Marinette Marine)

2 ea. 249.00

N

Hand Pump

(for Para. 3.2.1, Task

#7)

NSN:4320-01-015-9422

PN:P-18 (Enerpac, LTD_

1 ea. 218.76

Y Level wind hydraulic cylinder

(for Para. 3.2.1, Task

#8)

NSN: 3040-01-441-3721 1 ea. 7,423.00

N 3:1 Pilot Ratio, Vented

Counterbalance Valve

Assembly

(For Para. 3.2.1, Task

#17)

PN: CWEA-LHN (Sun

Hydraulics Corp)

1 ea 98.70

N Fully Adjustable

Needle Valve

(for Para. 3.2.1, Task

#17)

PN: NFDC-LAN (Sun

Hydraulics Corp)

1 ea 48.75

Y **Hydraulic Motor

(for Para. 3.2.1, Task

#21)

NSN: 4320-01-445-2248 1 ea 23,998

N Anode, elliptical, platinum & niobium,

37.5 A

Siemens Water Technologies

(US Filter Electrocatalytic)

74200-1

NSN 5342-01-408-5388

4 ea. 7,555.00

N Reference electrode, silver & silver chloride

Siemens Water Technologies

(US Filter Electrocatalytic)

32622-050

NSN 5977-01-346-0750

2 ea. 1,300.02

56 Y *Transducer Cover

Plate

N/A 4 ea. 50.00

N

Pivot Pin, Level Wind

Assembly Arm 5315-01-515-9868 1 ea 3,400.00

N

Pivot Pin, Hydraulic

Cylinder Foot End 5315-01-515-9847 1 ea 510.00 xiv (Rev-0)

N

Clevis Pin, Hydraulic

Cylinder Rod End 5315-01-515-9912 1 ea 380.00

61 N Wet Brake Unit Set

(Consists of 5 Brk Per

Kit)

NSN: 3040-01-F06-1016 1 Kit 4,500.00

70 N (14 mm x 40m), prefabricated with eye on one end, and tapered/welded on the other end

99-225-7786 1 ea.

70 N (14 mm x 37.75m), prefabricated with eye on one end, and tapered/welded on the other end

99-859-7924 1 ea

70 N Sheave bearing and seal

5014-1411 13 ea

70 N Sheave bearing and seal

5014-1511 2 ea

71 N Swing Brake Seal Kit NSN: 90-016-2141 2 ea

71 N Swing Brake Disc &

Bearing Kit

NSN: 90-016-2131 2 ea

71 N Counterbalance Valve PN: YMD-3763 1

71 N Swing Bearing NSN: 00-100-0624

PN: 95925

72 N Slide Pad/shim kit PN: YMD-8956 1 Kit

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xv (Rev-0)

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work

Item Title

1 Hull Plating, U/W Body, Inspect

2 Hull Plating (U/W Body), Ultrasonic Testing

3 Appendages (U/W), Leak Test

8 Voids (Non-Accessible), Leak Test

10 Tanks (MP Fuel Service), Inspect

Cargo Hatch, Overhaul and Repair

Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal

Strain Gage Alignment, Check

Propulsion Shaft Bearings (External) , Check Clearances

19 Controllable Pitch Propeller , System Maintenance

20 Controllable Pitch Propeller , Hub General Maintenance

21 Controllable Pitch Propellers , Clean and Inspect

28 Sea Bay, Inspect

32 Rudder Stock Bearings, Check Clearances

33 Rudder , Inspect and Repair

36 Hydraulic Chain Stoppers, Overhaul

38 Crossdeck Winches, Overhaul

39 Hydraulic Inhaul Winch, Overhaul

40 Mechanical Chain Stopper s , Overhaul

41 Anchor Windlass , Overhaul ( Level 2 )

42 Anchor Chain (s) and Ground Tackle, Inspect and Repair

43 Warping Capstan, Level 2 Inspect and Repair

61 Buoy Crane Swing Drive Brake Assemblies , Modify

66 Bilge s (Machinery Space), Preserve

70 Boat Boom, Inspect and Repair

71 Single Point Davit, Inspect and Repair

72 Buoy Crane , Inspect and Repair xvi (Rev-0)

PC_225B_WLB_1109

Principal Characteristics

225' WLB (B-CLASS)

PHYSICAL CHARACTERISTICS

Length Overall 225' 0" Length between Perpendiculars 206' 0" Maximum Beam 46' Designed Draft 13' 0" Full Load Displacement 2000 long tons Light Ship Displacement 1523 long tons Minimum Operating Displacement 1800 long tons Mast Height (Above 12' Waterline) 67' 5"

Anchor

Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain

HULL CHARACTERISTICS

Bilge Keels (Port & Starboard) Frames 42-79 Frame Spacing

FR 0 to 12 21" FR 12 to 30 22"

FR 30 to 102 24"

MACHINERY CHARACTERISTICS

Main Propulsion Diesel Reduction

Diesel Engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM

Number of Propellers 1 Number of Blades 4 Diameter 10' Pitch Controllable

RPM 254

Ship's Service Diesel Generators Two Caterpillar 3508 TA, 450 kW

Emergency Diesel Generator One Caterpillar 3406 DITA, 280 kW Shore Tie Two 450 VAC, 400 Amp, 3-wire

Shaft Bearing, Forward Cooper Bearing 01-BCP-1400-EX-

TL

Shaft Bearing, Aft Water Lubricated Cutless Bearing

TANK CAPACITIES

Diesel Oil 76,498 gal Fresh Water Capacity 8056 gal Hydraulic Oil Capacity 2785 gal Lube Oil Storage 764 gal Grey Water Tank 2700 gal Sewage Holding Tank 1700 gal

1 (Rev-0)

00000_PWB_0211_FLT

REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0211)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and

Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface

Profile of Blast Cleaned Steel

Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters

Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency

Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel

Surfaces Prepared by Dry Abrasive Blast Cleaning

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

2 (Rev-0)

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility‟s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:

3.4.1 Contractor‟s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.

3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.

3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.

3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.

3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a

”critical-coated‟ surface:

3.5.1 Coupon material and test set-up particulars.

3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:

The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.

The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.

For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.

The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.

3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:

The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.

Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).

Delivery rate and pressure settings.

3 (Rev-0)

3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM

D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:

Area of the vessel for which the verified setup will be used to abrasive blast.

The selected abrasive media type and size.

The nozzle size and type.

The delivery rate and pressure.

The test coupon starting properties (material type and surface conditions).

The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of

2 inches shall be recorded).

NOTES

1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.

2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.

3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.

3.5.1.4 Repeat the abrasive blasting operation test in the following instances:

The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.

The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.

Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.

The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.

When Directed by the COTR.

CAUTION!

Ensure that blast media from the performance test does not strike the vessel during the test.

3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:

3.6.1 Contents of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:

“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:

Ordinary low water mark on non-tidal rivers.

4 (Rev-0)

At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”

3.6.2 Paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel – due to disruption of grey water system) has been revised as follows:

“3.2.11.1 Sanitary facilities for vessel-personnel – due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:

Shower stalls are equipped with privacy screens.

Sinks are provided with fresh hot and cold water.

Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.

Toilets have doors or privacy dividers.

Lockers are capable of being locked.

3.7 Planning Document and Commitment From Tech Reps – The Contractor shall provide a preliminary electronic copy of the planning document required by SFLC Standard Spec 0000 Para 3.5.2 for Government review no later than 1 week after contract award. In addition to requirements of paragraph 3.5.2, all planning documents shall identify work item time periods that require OEM tech rep assistance. The Contractor shall also provide the names, contact information, and written commitment from all tech reps required by the Contract indicating they are available for work during the proposed time period.

3.8 NACE Level III Inspector Notification of Duties – If an independant NACE Level III Inspector is used to meet requirements of In-Process QC measures for “critical coated surfaces” as described by SFLC Std Spec0000

Para 3.2.4.2, the Contractor shall ensure the NACE Level III inspector is aware of, able, willing, and formally directed via subcontract documentation to perform of all duties enumerated in SFLC Std Specification 0000 Para

3.2.4.2.3 for all „critical coated surfaces” defined by SFLC Std Spec Para 1.3. Documentation of this contract and assumption of duties shall be provided to the Government by the Contractor after contract award.

3.9 Contractor Choice of Paint Systems – The Contractor shall submit documentation of the Contractors choice of intended paint systems to be used for all “critical coated surfaces” at the Arrival Conference for Government review and approval. Documentation shall be broken out by work item and shall document the brand name, color, intended mil thickness, time between coats, and intended final cure time prior to immersion or full duty rating.

Contractor shall also provide all product data sheets for all paint systems as a reference.

3.10 Critical Coated Surfaces Cure Times – Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the Contracting Officer. OEM representatives may not relax these requirements. Painting and curing of all tank coating systems shall occur while the cutter is out of the water. The CAPAC system shall not be energized until full cure of all underwater paint systems has occurred.

3.11 Critical Coated Surfaces and Ambient Controls - If ambient condition control equipment and tenting is required to achieve ambient condition parameters necessary for full paint cure or to meet environmental conditions as required in SFLC Std Spec 0000, para. A.2.1.4, contractor shall provide at no additional cost to the

5 (Rev-0)

Government.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

http://www.uscg.mil/directives/cim.asp

6 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name Hull # Work Item # Work Item Title

Location of Work (incl. frame #’s) Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down

(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.

threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer‟s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer‟s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector Signature Cert. # Date / Time

7 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE &

TIME

ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

(Frame &

Deck, relation to equipment, etc.)

TEMPERATURE % REL.

HUMID-

ITY DEW PT. SURFACE AMBIENT ΔT

| DP - Surface |

8 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Location of Work (Frame References) Area (sqft)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils) Min Max Mean

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile

Replica Tape Here

Reading:__________ mils

Pl…

This is the start of the file's text. The full file is on GovTribe.