GOVERNMENT_PROPERTY_REPORT_SF_1149.doc

Standard Form DOC document 67 KB Posted

Attached to
USCGC MANTA DRYDOCK & REPAIRS
Solicitation number
HSCG80-14-Q-P45482
Issued by

About this file

GOVERNMENT PROPERTY REPORT SF-1149

View the file

Other versions and copies of SF 1149

File Revision Posted Attached to
SF1149 - 1232SA26Q1452.pdf Revision not stated Benchtop Crossflow System - National Bio and Agro-Defense Facility
KraterKorp - SF1149- Signed.pdf Revision not stated Change Management Training for Consulate Staff
SF1149.pdf Revision not stated Travel Management Services
Attachment 1-12639524Q0242_SOW and SF1149.pdf Revision not stated Solicitation for Cross-Vane Panel Traps, Green 12 Funnel Multi-Funnel Traps, and Plastic Bucket Traps
SF 1149 HQ003424R0366 F3_Pump.pdf Revision not stated FIRE EXTINGUISHING AGENT - Fluorine-Free Foam (F3) & Electric Pump
SF1149_19BY7024Q0023.pdf Revision not stated Pump Procurement, Delivery and Installation
SF-1149 - Exhibit 1.pdf Revision not stated Thermo Electron Multi-Instrument Support and Maintenance Services
SF1149,_N6247019R1004.pdf Revision not stated Two Ship-to-Shore Container Cranes for Military Ocean Terminal Concord
sf1149.pdf Revision not stated AMPHIBIOUS VEHICLE WITH ACCESSORIES
(Contractor_Name)_-_SF1149.pdf Revision not stated DESK STUDY (DS) FOR TURKEY - ENERGY STORAGE TECHNOLOGIES
SF1149_1131PL-17-R-CP91084.pdf Revision not stated USTDA Transportation Engineering Support Services
SF1149_1131PL-17-R-DM51100.pdf Revision not stated Argentina Telecommnucations Definitional Mission (DM)
(Contractor_Name)_-_SF1149.pdf Revision not stated India Traditional Energy and Power Desk Study (DS) Series
SF1149.pdf Revision not stated Project Finance Training
(Contractor_Name)_-_SF1149.pdf Revision not stated India Clean Energy and Smart Grid Desk Study Series
SF1149_1131PL-17-R-DM51055.pdf Revision not stated RFP - Argentina Energy Sector Definitional Mission
SF_1149_-_HSCG40-16-61804_-_Grit_Removal.pdf Revision not stated Grit Removal - USCGC Flying Fish
SF1149__First_Look_Robot.pdf Revision not stated FirstLook Robotic System
SF 1149 - 41001-40012.pdf Revision not stated Steel
SF 1149 - Y32B5534005001 - GPS.pdf Revision not stated GPS Kit
Show all 20

Who attaches SF 1149

Other files

File Type Posted
SF30_Amendment_01_CGC_Manta.pdf PDF
SCHEDULE_OF_SUPPLIES_SERVICES_FOR_CGC_MANTA_111413.xls XLS spreadsheet
Past_Performance_Questionnaire.doc DOC document
SOLCITATION_FOR_CGC_MANTA_DRYDOCK_121813_.doc DOC document
SPEC_REV0_MANTA_FY14.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

contract number: HSCG80-14-C-P45482 vessel: USCGC MANTA (WPB-87320)

Contractor point of contact:

telephone number:

Contractor’s address:

The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.

1
2
3
4
5
6

Type of property received (include name, description , nsn and serial #) value of property

date received
date installed/

consumed Use this block to record :

1. current location of property in the possession of the Contractor for use during the availability or otherwise being temporarily held until being returned to/reinstalled on cutter.

2. disposition instructions for unused, serviceable, salvage or scrap property. state which apply.

date disposition carried out

description
nsn\serial\p/n

* Definitions (all property defined below will require disposition instructions):

Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.

Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.

Scrap – defined as property having no value except for it basic material content.

The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.

PROPERTY ADMINISTRATOR DATE

(Sign at time disposition instructions are given)

CONTRACTOR SIGNATURE DATE

(sign after execution of disposition instructions)

NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)

File details come from the government source that posted it. Updated .