SOLCITATION_FOR_CGC_MANTA_DRYDOCK_121813_.doc

DOC document 726 KB Posted

Attached to
USCGC MANTA DRYDOCK & REPAIRS Federal contract opportunity
Solicitation number
HSCG80-14-Q-P45482
Issued by
Department of Homeland Security US Coast Guard

About this file

SOLICITATION FOR USCGC MANTA

View the file

Other files for this federal contract opportunity

Other files attached to USCGC MANTA DRYDOCK & REPAIRS, newest first.
File Type Posted
SF30_Amendment_01_CGC_Manta.pdf PDF
Past_Performance_Questionnaire.doc DOC document
SCHEDULE_OF_SUPPLIES_SERVICES_FOR_CGC_MANTA_111413.xls XLS spreadsheet
GOVERNMENT_PROPERTY_REPORT_SF_1149.doc DOC document
SPEC_REV0_MANTA_FY14.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG80-12-Q-XXXXXX Page 38 of 64

USCGC NAME OF VESSEL

DRYDOCK/DOCKSIDE REPAIRS

NOTICE TO VENDORS

SOLICITATION NUMBER: HSCG80-14-Q-P45482

The U.S. Department of Homeland Security, U.S. Coast Guard Surfaces Forces Logistics Center (SFLC) will acquired the work outlined in the solicitation utilizing procedures in FAR Part 12, Acquisition of Commercial Items and FAR Subpart 13.5, Test Program for Certain Commercial Items.

THE FOLLOWING INFORMATION IS HIGHLIGHTED FOR YOUR ATTENTION:

1. This cover sheet is not intended to be all-inclusive. Please read the entire solicitation including any attachments, to ensure completion of all required representations, certifications, and submissions. Acknowledge all Solicitation Amendments (SF-30) issued by the Government.

2. Your offer shall include all of the documents and information listed on pages _6_ (FAR Provision 52.212-1 (b) Submission of Offers) and your offer shall be received by our office at or before the exact date and time specified on page 1 of the SF 1449, Block 8 to be eligible for award. Also, see FAR Provision 52.212-2 (pages) for Evaluation Factors.

3. Submit your offer, with all required documentation via one of the following methods:

· Mail to:

United States Coast Guard Surface Forces Logistics Center Attn: Nancy Brinkman, Contract Specialist

300 East Main Street, Suite 600 Norfolk, VA 23510-9112

Email: Nancy.M.Brinkman@uscg.mil Fax: 757-628-4676

4. QUESTIONS/CONCERNS: It shall be the obligation of the vendor to exercise due diligence to discover and to bring to the attention of the Government any ambiguities, inconsistencies or concerns regarding the information in this solicitation. All questions/concerns regarding this solicitation shall be submitted in writing to the Contract Specialist at Nancy.M.Brinkman@uscg.mil no later than 6 January 2014 at 3:00 p.m. EST. Follow-up/ additional questions will not be accepted after this date and time. Vendors shall reference the solicitation number and provide enough information in their email so the Government can easily respond to their questions/concerns. Questions/concerns will be compiled and addressed on an Amendment of Solicitation (SF-30) and will be posted on the FedBizOpps website for viewing by all potential vendors. Answers to questions will be available after the due date for questions/concerns has past.

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:

COMMANDANT (CG-9131)

U S COAST GUARD

OMBUDSMAN PROGRAM FOR AGENCY PROTESTS

2100 2ND ST SW STOP 7112

WASHINGTON DC 20593-7112

The Ombudsman Hotline Telephone Number is (202)372-3695.

Commander

U.S. Coast Guard

Surface Forces Logistics Center

CPD-C&P1-PBPL

300 East Main Street, Suite 600 Norfolk, VA 23510

REQUEST FOR QUOTATION

HSCG80-14-Q-P45482

USCGC MANTA (WPB-87320) DRYDOCK REPAIRS

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2114804p45482

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

HSCG80-14-Q-P45482

6. SOLICITATION ISSUE DATE

12/18/2013

7. FOR SOLICITATION INFORMATION CALL:
a. NAME

NANCY BRINKMAN

b. TELEPHONE NUMBER (No collect calls) 757-628-4579

8. OFFER DUE DATE/ LOCAL TIME

01/17/2014 @ 10:00 a.m. EST

9. ISSUED BY CODE 75174

USCG SURFACE FORCES LOGISTICS CENTER

Attn: Nancy Brinkman, Contract Specialist 300 E Main Street, Suite 600 Norfolk, VA 23510

E-mail: Nancy.M.Brinkman@uscg.mil

10. THIS ACQUISITION IS FORMCHECKBOX

UNRESTRICTED OR FORMCHECKBOX

SET ASIDE: 100 % FOR:

FORMCHECKBOX

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

FORMCHECKBOX

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

FORMCHECKBOX

HUB ZONE SMALL SMALL BUSINESS PROGRAM NAICS: 336611 BUSINESS

FORMCHECKBOX

EDWOSB SIZE STANDARD:

FORMCHECKBOX

SERVICE-DISABLED 1000

VETERAN-OWNED

SMALL BUSINESS FORMCHECKBOX

8(A)

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED

FORMCHECKBOX

SEE SCHEDULE

12. DISCOUNT TERMS

FORMCHECKBOX

13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) 13b. RATING

DO-N5

14. METHOD OF SOLICITATION

RFQ FORMCHECKBOX

IFB FORMCHECKBOX

RFP

15. DELIVER TO CODE

CONTINUED ON PAGE _3_ of _42_

16. ADMINISTERED BY CODE

USCG Surfaces Forces Logistics Command

CONTINUED ON PAGES ___ of ___

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

Name:

Address:

DUNS:

TELEPHONE NO:

18a. PAYMENT WILL BE MADE BY CODE 51800 USCG Finance Center

1430A Kristina Way

Chesapeake, VA 23326

FORMCHECKBOX

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED FORMCHECKBOX

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

The Contractor shall furnish all necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things a are necessary, except as otherwise specified to perform dry docking repairs and alternations to the vessel, in accordance with this solicitation and attached specifications.

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)

FORMCHECKBOX

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

FORMCHECKBOX

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

FORMCHECKBOX

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN (1) COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

FORMCHECKBOX

29. AWARD OF CONTRACT: REFERENCE

OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER

NANCY BRINKMAN

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA – FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

All work is to be performed in accordance with CGC MANTA’s Specification Rev0 dated 14 November 2013. Work covered by this specification shall be completed within sixty-two (62) calendar days from the date the vessel becomes available to the Contractor. This availability is scheduled to start on or about 30 April and ends on or about 1 July 2014.

32a. QUANTITY IN COLUMN 21 HAS BEEN

FORMCHECKBOX

RECEIVED

FORMCHECKBOX

INSPECTED

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER

35. AMOUNT VERIFIED CORRECT FOR

36. PAYMENT

FORMCHECKBOX

COMPLETE

FORMCHECKBOX

PARTIAL

FORMCHECKBOX

FINAL

37. CHECK NUMBER

FORMCHECKBOX

PARTIAL FORMCHECKBOX

FINAL

38. S/R ACCOUNT NUMBER

39. S/R VOUCHER NUMBER

40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

42 a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD)

42d. TOTAL CONTAINERS

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 1449 (Rev. 2/2012

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA – FAR (48 CFR) 53.212

Continuation of SF 1449 – BLOCKS 15 - 26

(1) Block 15: Deliver To Place of Performance: Contractor’s Facility (to be incorporated at time of award).

Place of Acceptance on behalf of the Government: U.S. Coast Guard Cutter MANTA, GEOGRAPHIC RESTRICTION: Per U. S. Coast Guard, Atlantic Area Instruction 3100.1C, the USCGC MANTA (WPB-87320) is restricted to 750 nautical miles (one way) from the cutters homeport of Freeport, TX

(2) Block 16: Administered By (Contract Management)

Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The individuals listed below will be the Government points of contact during the performance period.

Contract Administration: The U.S. Department of Homeland Security, U.S. Coast Guard, Surface Forces Logistic Command, CPD1, 300 East Main Street, Suite 600, Norfolk, VA 23510-9112 will perform all contract administration. Communications pertaining to contractual administrative matters shall be addressed to one of the Contracting Officers (KO) listed below. Changes in, or deviations from, the specification or terms and conditions of the contract shall not be effected without written modification to the contract as executed by a USCG SFLC CPD Contracting Officer.

Contracting Officer: Nancy Brinkman

Telephone #: 757-628-4579 E-Mail:

Nancy.M.Brinkman@uscg.mil

Fax #: 757-628-4676 Alternate Contracting Officer(s): Any warranted USCG SFLC CPD Contracting Officer

(3) Block 17a: Contractor shall include company’s DUNS number Block 17b: Remittance Address

Payment will be made by Electronic Funds Transfer (EFT) to the Financial Institution listed in the System for Award Management (SAM). To receive an award the Contractor must be registered in the System for Award Management (SAM) http://www.sam.gov.

(4) Blocks 18a and 18b: Invoice Procedures

INVOICE SUBMISSION PROCESS:

1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.

(A) The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

(B) A CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case by case basis for large dollar CLINS.)

(C) In addition to the information required by FAR 52.212-4 (g) Invoices shall include:

1) Contract Number, Delivery Order/Task Order Number, DOC Number

2) Name and Address of the Contractor

3) Invoice Number and Invoice Date

4) DUNS Number

5) Name of the Contract Specialist and Contracting Officer’s

6) Invoice Routing Code (IRC): SFLC-1

7) Indicate Small Business Status

8) Indicate if Final Invoice, the Contractor’s final invoice submitted under the contract must be marked as follows: (THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER (to be assigned upon contract award).

9) The percentage of completion for each CLIN identified;

10) Vessel name

11) The overall percentage and dollar amount previously billed, currently billed and unbilled,

12) Shipping and Payment Terms

13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.

All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.

1. The Contractor shall forward invoices to the contracting Officer’s Technical Representative (COR), who shall review, verify and sign the invoice and then return it to the Contractor.

2. The Contractor shall complete the Contractor Invoice Submission Form (listed below).

3. The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:

http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm Contractor Invoice Submission Form Directions: Please complete as much information as possible. All blocks in red text are required entries.

Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).

THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED

Invoice Information Invoice Routing Code: (help) Invoice Number: (help) Contract Number: (help) Invoice Date: (help) BPA Number: (help) Invoice Amount: (help) Delivery/Task Order Number: (help) Discount Terms: %

Discount Days: Net Days: (help)

Company Information Attachment of Official Invoice Company Name: (help) DUNS: Plus 4: (help) Point of Contact Name: (help) Point of Contact Email: (help) Phone: (help) Fax: (help)

Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.

· Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.

· Need help creating a PDF file? Click here for instructions.

Bottom of Form

6. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-1.

7. Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments. http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm

8. A copy of the invoice and any supporting documentation shall also be e-mailed to the Contracting Officer:

Nancy.M.Brinkman@uscg.mil Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount.

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.

FURTHER CONSIDERATIONS WITH INVOICING:

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(ii) For invoices electronically transmitted by the Contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(iii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;

(2) On the date placed on the invoice by the Contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or

(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(4) Web based submission by the Contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(5) For inquiries and payment status please visit: https://fincen.uscg.mil/secure/payment.htm The Data Universal Numbering System (DUNS) number is the primary identifier in System for Award Management (SAM), formally known as Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)). Contractors are located and identified in SAM by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.

All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subContractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.

Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.

(5) Blocks 19-24: Schedule of Supplies/Services

CONTRACT TYPE:

This solicitation is a Request For Quotes (RFQ) which will result in the award of a firm fixed price contract.

CONTRACT PERIOD OF PERFORMANCE:

Work covered by this solicitation shall be completed within sixty-two (62) calendar days from the date the vessel becomes available to the Contractor. The performance period is from April 30 to July 1, 2014. The availability is scheduled to start on or about April 30, 2014. An arrival conference normally will be held within 48 hours of the schedule start date. Vessels being dry docked shall be in dry dock within seventy-two (72) hours of delivery. If a pre-docking shaft alignment is being performed, the vessel shall be dry docked with one-hundred and twenty (120) hours after arrival.

SCHEDULE OF SUPPLIES/SERVICES:

Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Optional CLINS are marked “O” for Optional. Insert unit prices in all CLINs listed in the Schedule unless “NSP” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced.”

(see separate attachment for CLIN spreadsheet)

GOVERNMENT ESTIMATE FOR:

USCGC MANTA (WPB-87) DRYDOCK AVAILABILITY FY2014

ITEM
DESCRIPTION
UNIT PRICE
UNIT
QTY
EXTENDED PRICE
D-001
Perform Ultrasonic Thickness Measurements (D)
JOB
1
O-002
Perform Ultrasonic Thickness Measurements (O)
25 SHOTS
10
D-003
Bilge Surfaces (Lazarette), Preserve (Partial) (D)
JOB
1
D-004
Dirty Oil Tank, Clean and Inspect (D)
JOB
1
D-005
Tanks (MP Fuel Service), Clean and Inspect (D)
JOB
1
D-006
Oily Water Tank, Preserve (D)
JOB
1
O-007
Superstructure, Preserve (100%) (O)
JOB
1
O-008
Depth Sounder, Capastic Fairing, Renew (O)
JOB
1
O-009
Main Engine/Reduction Gear, Realign (O)
JOB
1
D-010
Propulsion Shafts, Remove, Inspect, and Reinstall (D)
JOB
1
O-011
Propulsion Shaft, Repair (O)
JOB
1
O-012
Propulsion Shaft, Straighten (O)
JOB
1
O-013
Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew (O)
JOB
1
O-014
Aft Water-Lubricated Propulsion Shaft Bearing, Renew (O)
JOB
1
O-015
Intermediate Bearing Carrier, Renew (O)
JOB
1
O-016
Aft Bearing Carrier, Renew (O)
JOB
1
O-017
Stern Tubes, Interior Surfaces, Preserve (100%) (O)
JOB
1
O-018
Stern Tubes, Interior Surfaces, Repair (O)
JOB
1
D-019
Propellers, Remove, Inspect, and Reinstall (D)
JOB
1
O-020
Fathometer Transducer, Renew (O)
JOB
1
D-021
Speed Log, Skin Valve Assembly, Clean and Inspect (D)
JOB
1
D-022
Sea Water System (Sea Valves, Strainers, Piping), Clean, Inspect and Repair (D)
JOB
1
D-023
Rudder Assemblies, Remove, Inspect and Reinstall (D)
JOB
1
D-024
RHIB Notch Skid Pads, Inspect (D)
JOB
1
O-025
RHIB Notch Skid Pad Studs, Renew (O)
05 STUDS
10
D-026
Stern Launch Door, Remove, Inspect and Reinstall (D)
JOB
1
D-027
Grey Water Holding Tank, Clean and Inspect (D)
JOB
1
D-028
Sewage Holding Tank , Clean and Inspect (D)
JOB
1
D-029
Grey Water Piping, Clean and Flush (D)
JOB
1
D-030
Sewage Piping, Clean and Flush (D)
JOB
1
O-031
U/W Body, Preserve (100%) (O)
JOB
1
D-032
Hull Plating Freeboard, Preserve (100%) (D)
JOB
1
D-033
Superstructure, Preserve (Partial) (D)
JOB
1
D-034
Cathodic Protection / Zincs, Renew (D)
JOB
1
D-035
Drydocking (D)
JOB
1
D-036
Temporary Services, Provide (D)
JOB
1
D-037
Telephone Service, Provide (D)
JOB
1
D-038
Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting (D)
JOB
1
D-039
Install Stainless Steel Hull Inserts and Renew BMDE Concentric Rings.(D)
JOB
1
O-00A
Composite Labor Rate
Hour
310
D-00B
GFP Report
NSP
EA

NSP

O-00Z
Laydays
DAY
5

Total Price of Definite Items

Total Price of Option Items

Total Price of Definite and Optional Items

(6) Blocks 25: Accounting and Appropriation Data ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.

(7) Blocks 26: Total Award

This contract will obligate all definite (D) work items. The funding for the optional work items will obligated with a bilateral contract modification as required.

DESCRIPTION OF WORK:

(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry docking repairs, and alterations to the vessel, in accordance with this solicitation and attached specifications.

(b) Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror’s risk.

REQUIRED DOCUMENTS:

Each quoter shall furnish the information required by the solicitation, which includes:

1. Signed 1449 with offeror’s address, DUNS and other information completed.

2. Price Schedule filled out with a cost associated with each CLIN

3. Past Performance Documentation

4. Small Business Self Certification for applicable set-aside (i.e.HUBZone, Small Business, SDVOSB, 8(a))

5. Welding Certifications and Procedures

6. Proof of Insurance (Statement of Coverage from current Insurance carrier)

7. Dry Dock Facility and or Dry Dock Cradle ( if applicable) Certification

8. Pre-Award Dry Dock Calculations for US Coast Guard Cutter MANTA (WPB-87320) an 87-foot patrol boat PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED.

DELIVERABLES: Seven days after the contract has been awarded the Contractor will generate a legible planning document as outlined in SFLC Standard Specification 0000 (3.2.5) and email it to the Contracting Officer and Port Engineer for a preliminary review. An arrival conference for the availability will be held within 48 hours of the scheduled start date of the contract.

ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about 1 March 2014. Work covered by this solicitation shall be completed within sixty-two (62) calendar days from the date the vessel becomes available to the Contractor. The performance period is from 30 April through 1 July 2014. One federal holiday (Memorial Day: May 26, 2014). The availability is scheduled to start on or about 30 April 2014.

QUESTIONS AND REQUEST FOR DRAWINGS: The last day to request drawings or ask questions regarding this solicitation is 6 January 2014. After this date, further requests may not be accepted due to time constraints.

CONTRACT CLAUSES

(1) FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (SEP 2013)

ADDENDUM

FAR 52.209-5 CERTIFCATION REGARDING RESPONSIBILITY MATTERS (APR 2010)

(a)(1) The Offeror certifies, to the best of its knowledge and belief, that—

(i) The Offeror and/or any of its Principals—

(A) Are o are not o presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;

(B) Have o have not o, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation);

(C) Are o are not o presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision;

(D) Have o, have not o, within a three-year period preceding this offer, been notified of any delinquent Federal taxes in an amount that exceeds $3,000 for which the liability remains unsatisfied.

(1) Federal taxes are considered delinquent if both of the following criteria apply:

(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.

(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.

(2) Examples.

(i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.

(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.

(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.

(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).

(ii) The Offeror has o has not o, within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.

(2) “Principal,” for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

This Certification Concerns a Matter Within the Jurisdiction of an Agency of the United States and the Making of a False, Fictitious, or Fraudulent Certification May Render the Maker Subject to Prosecution Under Section 1001, Title 18, United States Code.

(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror’s responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror nonresponsible.

(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.

(End of provision)

(2) FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item (Mar 1989) - VARIATION The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both. When time is of essence initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired.

(End of Clause)

(3) FAR 52.232-99 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (DEVIATION) (AUG 2012) This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.

1. Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.

2. Include the substance of this clause, including this paragraph (b), in all subcontracts with small business concerns.

3. The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(4) FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html

FAR 52.204-7
System Award for Management (JUL 2013)
FAR 52.211-15
Defense Priority and Allocation Requirements (APR 2008) DO N5 Rating
FAR 52.223-3
Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JUL 1995)
FAR 52.223-12
Refrigeration Equipment and Air Conditioners (MAY 1995)
FAR 52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certification ( DEC 2012)
FAR 52.228-5
Insurance – Work on a Government Installation (JAN 1997)
FAR 52.232-18
Availability of Funds (APR 1984)
FAR 52.232-39
Unenforceability of Unauthorized Obligations (JUN 2013)
FAR 52.242-2
Production Progress Reports (APR 1991)
FAR 52.242-15
Stop Work Order (AUG 1989)
FAR 52.245-1
Government Property (APR 2012)
FAR 52.245-9
Use and Charges (APR 2012)
FAR 52.249-2
Termination for Convenience of the Government (Fixed Price ) (APR 2012)
HSAR 3052-205-70
Advertising, Publicizing Awards and Releases (SEP 2012)
HSAR 3052.211-70
Index for Specifications (DEC 2003)
HSAR 3052.217-90
Delivery and Shifting of Vessel (DEC 2003)
HSAR 3052.217-91
Performance (DEC 2003)
HSAR 3052.217-92
Inspection and Manner of Doing Work (DEC 2003)
HSAR 3052.217-93
Subcontracts (DEC 2003)
HSAR 3052.217-94
Lay Days (DEC 2003)
HSAR 3052.217-95
Liability and Insurance (DEC 2003)
HSAR 3052.217-96
Title (DEC 2003)
HSAR 3052.217-97
Discharge of liens (DEC 2003)
HSAR 3052.217-98
Delays (DEC 2003)
HSAR 3052.217-99
Department of Labor Safety and Health Regulations for Ship Repair (DEC 2003)
HSAR 3052.217-100
Guarantee (JUN 2006)
HSAR 3052.222-70
Strikes or Picketing Affecting Timely Completion of the Contract Work (DEC 2003)
HSAR 3052.222-71
Strikes or Picketing Affecting Access to a DHS Facility (DEC 2003)
HSAR 3052.223-90
Accident and Fire Reporting (DEC 2003)
HSAR 3052.228-70
Insurance (SEP 2012)
HSAR 3052.242-72
Contracting Officer’s Technical Representative (DEC 2003)

(5) HSAR 3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES – APPLICABLE LICENSES AND PERMITS (JUN 2006) The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within [“insert days”] days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract.

(End of clause)

(6) VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.

(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:

1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;

2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.

(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.

(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.

(7) TELEPHONE CHARGE

The Commanding Officer of the Cutter will pay all toll charges and applicable taxes and surcharges for long-distance telephone calls placed by ship’s personnel. All other charges shall be borne by the Contractor.

(8) ACCESSIBILITY OF CONTRACTOR'S FACILITY

The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of _12__ feet and a minimum vertical clearance of _55_ feet.

(9) REQUIRED INSURANCE

The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (DEC 2003), the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:

1. Ship Repairer's Liability - $500,000 per occurrence.

2. Comprehensive General Liability - $500,000 per occurrence.

3. Full insurance coverage in accordance with the United States’ Longshoremen's and Harbor Worker's Act.

4. Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.

The insurance certificate must provide the name of the US Coast Guard vessel and the contract and/or solicitation number as specifically insured.

(10) ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government, or other Prime Contractors with the Government, and their subContractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.

The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

(11) INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other Prime Contractors with the Government and their subContractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

(12) INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(13) GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, will be incorporated.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an SFLC 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the Contractor and shall be included in the Composite Labor Rate. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.

(14) DISCOVERIES AND CHANGES TO CONTRACT:

Work requests can be transmitted electronically by using email. The bullets below display the process of how work requests are to be followed during the availability:

Work Request Process will occur in the following order:

1. Condition Found Report (CFR)-Generated by the Contractor and provided to COR

2. Condition Report Reply(CRR)-Generated by the COR and provided to Contractor

3. Work Request- WR and IGE are generated by the COR and forwarded to KO

4. COR provides copy of Work Request to the Contractor

5. Contractor’s Proposal- Provided to the KO for the identified tasking on WR

6. Negotiations- If needed, take place to establish pricing

7. Approved Work Request- Forwarded to Contractor and COR by the KO

8. Modification to Contract- The KS/KO will issue a modification covering all WR’s In order to determine price reasonableness: All change requests that list sub-contracting and/or material must have a written proposal from the sub-contractor or the company providing the material with complete, detailed information (listing number of hours/price per hour; each part/component & associated cost; and an estimated shipping cost).

(15) COMPOSITE LABOR RATE:

The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee);

(7) all direct and indirect costs and profit associated with the following support functions:

Supervision and Management Planning and Estimating

Material Handling

Housekeeping

Engineering

Transportation/Drivers

Quality Assurance

Contract Administration

Security

Testing

(8) all consumables;

(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the Contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government’s best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the Contractor to compensation if not exercised.

(16) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT

1. The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

2. The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .