Atch_14_Preaward_Survey_FRFP.docx

DOCX document 21 KB Posted

Attached to
Missile Defense Data Center (MDDC) Program Federal contract opportunity
Solicitation number
HQ0147-10-R-0030
Issued by
DOD Missile Defense Agency

About this file

Attachment 14

View the file

Other files for this federal contract opportunity

Other files attached to Missile Defense Data Center (MDDC) Program, newest first.
File Type Posted
HQ0147-10-R-0030_AMD_0008.doc DOC document
HQ0147-10-R-0030_AMD08_MDDC_Atch_11_Section_L.docx DOCX document
HQ0147-10-R-0030 SF30 Amd 0007.doc DOC document
Exhibits_B1 through B8_(Revised Exhibit B8 - April 19 2012).xlsx XLSX spreadsheet
Atch_11_Section_L_MDDC_FRFP_April 19 2012.pdf PDF
MDDC Questions_Answers_April 13_2012.pdf PDF
HQ0147-10-R-0030 SF30 Amd 0003.doc DOC document
HQ0147-10-R-0003 SF30 Amd 0006.doc DOC document
HQ0147-10-R-0003 SF30 Amd 0005.doc DOC document
HQ0147-10-R-0030 SF30 Amd 0004.doc DOC document
List of Documents in Bidders Library revised since Initial Release.pdf PDF
HQ0147-10-R-0030 SF30 Amd 0002.doc DOC document
Exhibit_C_BOE_Summary_(Revised April 12 2012).xlsx XLSX spreadsheet
Atch_1_MDDC_SOW_FRFP_Amd01.pdf PDF
Exhibits B1 through B8_FRFP_Amd01.xlsx XLSX spreadsheet
Atch_11_Section_L_MDDC_FRFP_Amd0001.pdf PDF
Exhibit A CDRL_DD_Form_1423_FRFP_Amd01.doc DOC document
Exhibit C BOE Summary_FRFP_Amd01.xlsx XLSX spreadsheet
Atch_8_PPInfoSheet_FRFP_Amd01.docx DOCX document
Atch_3_Govt_Labor_Categories_FRFP_Amd01.pdf PDF
HQ0147-10-R-0030 Amendment 0001.doc DOC document
Atch_12_Section_M_MDDC_FRFP_Amd01 .pdf PDF
Atch_9_PPQTransmittalLtr_FRFP_Amd01.pdf PDF
Joint Ventures and SB Teaming.pdf PDF
MDDC Amendment e-mail.docx DOCX document
MDDC Preproposal Conference Slides.pptx PPTX presentation
Gate 9 directions to East Entrance.pptx PPTX presentation
MDDC Preproposal Conference Information.docx DOCX document
Exhibit_A_CDRL_DD_Form_1423_FRFP.doc DOC document
Exhibit_C_BOE_Summary_FRFP.xlsx XLSX spreadsheet
Exhibits_B1_through_B7_FRFP.xlsx XLSX spreadsheet
DD 1707_MDDC.pdf PDF
Contracting_Officer_Cover_Letter_MDDC.pdf PDF
Atch_6_OCI Analysis-Disclosure Form_FRFP.doc DOC document
Atch_11_Section_L_MDDC_FRFP.docx DOCX document
Atch_4_GFE List_FRFP.xlsx XLSX spreadsheet
Atch_7_PastPerformanceQuestionnaire_(PPQ)_FRFP.docx DOCX document
Atch_5_OCI Policy Memo_FRFP.pdf PDF
Atch_9_PPTransmittalLetter_FRFP.docx DOCX document
Atch_13_Compliance_Matrix-FRFP.xls XLS spreadsheet
Atch_3_Govt_Labor_Categories_FRFP.docx DOCX document
Atch_12_Section_M_MDDC_FRFP.docx DOCX document
Atch_1_MDDC_SOW_FRFP.docx DOCX document
HQ0147-10-R-0030_MDDC_FRFP.docx DOCX document
Atch_8_PPQInfoSheet_FRFP.docx DOCX document
Atch_10_PPSample SubContractor Consent Ltr_FRFP.docx DOCX document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preaward Survey of Prospective Contractor Accounting System Checklist

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Contractor Name:

Point of Contact:

CAGE Code:

DUNS Code:

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative
HQ0147-10-R-0030
Section J, Attachment 14

File details come from the government source that posted it. Updated .