Attachment 12 Section M
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section M - Evaluation Factors for Award
CLAUSES INCORPORATED BY REFERENCE
| 52.217-5 |
| Evaluation Of Options |
| JUL 1990 |
| 52.232-15 |
| Progress Payments Not Included |
| APR 1984 |
M-1.0 Introduction The Government will evaluate the Offeror‘s proposals In Accordance With (IAW) the criteria specified in this section.
M-2.0 Basis for Award This is a competitive, best value, source selection that will be conducted in accordance with Federal Acquisition Regulation (FAR) Part 15.3 and Defense Federal Acquisition Regulation Supplement (DFARS) Part 215.3. In using this best value approach, the Government seeks to award to an Offeror who gives the Missile Defense Agency the greatest confidence that it will best meet the Government’s requirements in an affordable manner. To arrive at a source selection decision, the Source Selection Authority (SSA) will integrate the source selection team’s evaluations of the evaluation factors and subfactors described below. While the Government source selection evaluation team and the SSA will strive for the maximum objectivity, the source selection process, by its nature, is subjective, and therefore, professional judgment is implicit throughout the entire process. This may result in an award being made to a higher rated, higher priced Offeror where the decision is consistent with the evaluation factors and the SSA reasonably determines that the technical superiority, and/or overall business approach, and/or superior past performance, of the higher priced Offeror outweighs the cost difference.
The Government will select for award the most advantageous proposal representing the best value to the Government based upon an integrated assessment of technical, management, past performance, and cost/price.
The Government intends to award a single Indefinite Delivery/Indefinite Quantity (IDIQ) contract resulting from this solicitation for the entire MDDC Program effort. The IDIQ contract will have a base Ordering Period of five (5) years with five (5) one year options. Task Orders (TO) will be placed as funds and efforts are identified. TOs may be incrementally funded. The Period of Performance (PoP) for each TO will be determined at TO award.
M-3.0 Evaluation Factors and Subfactors The SSA will select the proposal considered the best value to the Government based upon an integrated assessment of the evaluation factors and subfactors described below. The Technical and Management Evaluation Factors are of equal importance, and are more important than the Past Performance Factor. When combined, these three Factors are significantly more important than Cost/Price. The Technical Subfactors 1 through 6 are of equal importance. The Management Subfactors 1 through 4 are of equal importance. Color and risk ratings will be assigned at the Technical and Management subfactor level. Past Performance will receive a performance confidence assessment rating. Cost/price will be evaluated for reasonableness and realism and will be considered as part of the integrated assessment of best value. The non-cost factors, when combined, are significantly more important that cost/price, but cost/price will contribute substantially to the Source Selection decision.
Evaluation Methodology and Definitions. Each proposal will be evaluated against the solicitation and its stated evaluation factors and subfactors for award. The Government’s Technical and Management evaluation will focus on compliance with solicitation requirements and the proposal’s strengths, uncertainties, weaknesses, significant weaknesses, and deficiencies.
Table 1: Evaluation Definitions
| Discriminator |
| Definition |
| Strength |
| Is an aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. |
| Uncertainty |
| A doubt regarding whether an aspect of the proposal meets a material performance or capability requirement. It requires additional information from the offeror to further explain the proposal before the evaluator can complete his/her review and analysis. |
| Weakness |
| A flaw in the proposal that increases the risk of unsuccessful contract performance. |
| Significant Weakness |
| A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. |
| Deficiency |
| A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. |
M-3.1 Technical, Factor 1 and Management, Factor 2
The Government will consider proposed innovations and efficiencies that decrease cost and/or enhance contract schedule and/or performance, are of benefit to the Government, and are in enough detail to be made contractually binding and will in fact be incorporated into the successful Offeror’s resulting contract, if awarded. To support the Government’s determination of actual benefit, the Offeror may discuss any cost advantages that may or may not appear in the Cost/Price Proposal. Assessments will be based on the extent to which the Offeror demonstrates a commitment to provide additional benefits to the MDA and MDDC mission, such as providing higher output, capability, and quality, or exceeding performance thresholds identified in the SOW.
Evaluation of these factors shall focus on the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, uncertainties, and deficiencies using the following color ratings. The Government will not roll up subfactor ratings into an overall color rating for Technical or Management. Note a deficiency (defined above) in the Offeror’s proposal could render the Offeror’s proposal unawardable. Also see paragraph M-4.0.
Table 2: Subfactor Color Ratings
| Color |
| Rating |
| Definition |
| BLUE |
| Outstanding |
| Proposal meets requirements and indicates an exceptional* approach and understanding of the requirements. The proposal contains multiple strengths and no deficiencies. |
| PURPLE |
| Good |
| Proposal meets requirements and indicates a thorough** approach and understanding of the requirements. Proposal contains at least one strength and no deficiencies. |
| GREEN |
| Acceptable |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Proposal has no strengths or deficiencies. |
| YELLOW |
| Marginal |
| Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. |
| RED |
| Unacceptable |
| Proposal does not meet requirements and contains one or more deficiencies and is unawardable. |
*Clarifying definition of “exceptional approach and understanding”: Proposal describes an extraordinary approach that meets all requirements and identifies/acknowledges all major tasks to meet the requirements in great detail demonstrating a very comprehensive and in-depth understanding of the task complexity.
** Clarifying definition of “thorough approach and understanding”: Proposal describes an approach that meets all requirements and identifies/acknowledges all of the major tasks to meet the requirements with significant detail to demonstrate that it has a complete understanding of the task complexity.
Risk will be rated separately. Assessment of risk, which is manifested by the identification of weakness(es) and significant weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Assessment of risk will be accomplished at the subfactor level and will not be rolled up to the factor level. Technical and Management risk will be evaluated using the following risk ratings:
Table 3: Subfactor Risk Ratings
| Rating |
| Definition |
| Low |
| Has little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties. |
| Moderate |
| Can potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties. |
| High |
| Is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring. |
M-3.2 Past Performance – Factor 3 The past performance evaluation will result in an assignment of a performance confidence assessment rating. The Offeror’s recent and relevant past performance will focus on performance that is relevant to the Technical and Management subfactors and Cost/price factor.
M-3.3 Cost/Price – Factor 4 Although less important than the three non-cost/price factors combined, the Cost/Price Factor will contribute substantially to the source selection decision. While cost/price will not be rated or color coded, it will be evaluated in terms of realism.
M-4.0 Competitive Range If discussions are to be conducted, the PCO shall, with the approval of the SSA, establish a competitive range based on the ratings of each proposal against all evaluation criteria. If the SSA determines that an Offeror’s proposal should not be included in the competitive range, the proposal will be eliminated from consideration for award and written notice of the decision will be provided to the unsuccessful Offeror in accordance with FAR 15.503.
M-4.1 Discussions To maximize the Government’s ability to obtain the best value, based on the requirement and the evaluation factors set forth in this solicitation, it may be necessary to conduct discussions. Discussions may be conducted either orally or in writing. The scope and extent of the discussions are a matter of contracting officer judgment as set forth in FAR 15.306. Offerors may be restricted to a short turnaround (less than 24 hours) in responding to the contracting officer. Offerors should present their very best proposal as their initial proposal. Offerors are strongly advised to thoroughly examine their proposals for accuracy, complete documentation, clear explanations and compliance with all requirements of the solicitation prior to submission to the contracting officer. The Government does not plan to conduct successive rounds of discussions to give Offerors the opportunity to strengthen weak proposals.
M-4.2 Final Proposal Revisions If discussions are conducted, final proposal revisions will be required in determining the award of the contract resulting from this solicitation. Offerors are advised that unsupported final proposal revisions may be penalized in the overall proposal evaluation, and an otherwise acceptable proposal could be placed in jeopardy. However, the Government reserves the right to award a contract without discussions or opportunity for proposal revisions, in which case, final proposal revisions will not be required.
M-4.3 Rejection of Unrealistic Offers The Government may reject any proposal that is determined to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low cost when compared to the Government estimate, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
M-4.4 Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors and subfactors to be eligible for award. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award.
M-5.0 FACTOR 1 - TECHNICAL
M-5.1 Technical Subfactor 1 – Information Technology
This subfactor primarily focuses on SOW Section 4.2, Test Support Systems; SOW Section 4.6, Information Technology Infrastructure; and SOW Section 5, Mission Focus.
The Government will evaluate the extent to which the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute Information Technology activities, including:
1) Offeror demonstrates knowledge and experience in managing the day to day activities and processes associated with IT system and network management operations; the recruitment and staffing of a well-trained, knowledgeable IT work force; the short- and long-term technical direction planning; and IT inventory and cost management sustainment activities for Information Technology (IT) classified and unclassified networks and systems with the following requirements:
a. Manage, administrate and document large network architectures with >100 physical and virtual servers in concurrent use, 250+ users/workstations, and data/file repositories >200 TB that are backed up on a frequent, periodic schedule.
b. Maintains multiple network access points to include file transfer capabilities to external sites.
c. Familiarity with administration and management of network architecture hardware and software including Microsoft Windows Server, Linux distributions, Cisco networking equipment and Cisco IOS, and Storage Array Networks.
2) Offeror demonstrates knowledge to accredit Information Technology classified and unclassified networks and systems IAW the DoD Information Assurance Certification and Accreditation Process (DIACAP).
3) Offeror demonstrates the technical competence and approach to develop and manage Information Assurance plans and procedures.
M-5.2 Technical Subfactor 2 - Software
This subfactor primarily focuses on SOW Section 4.2, Test Support Systems; SOW Section 4.5, Software Development; and SOW Section 5, Mission Focus.
The Government will evaluate the extent to which the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute Software activities, including:
1) Offeror demonstrates the capability to execute and manage Software Development activities necessary to provide software development in support of MDDC Program operations at a level commensurate with Software Engineering Institute/Capability Maturity Model Integration (SEI/CMMI) Level 3; demonstration of knowledge and expertise regarding processes, procedures, and configuration management approach on similar sized activities.
2) Offeror demonstrates technical competence to design, develop, and implement complex software systems with the following requirements:
a. Managing and utilizing a codebase >50,000 LOC (lines of code);
b. Use of complex mathematical constructs (such as: matrix and coordinate transformations, linear interpolation, vector mathematics, quaternions);
c. Development of graphical user interfaces to support 3D modeling;
d. Use of authentication and authorization security paradigms;
e. Interconnectivity and use of database systems within the codebase;
f. Familiarity and use of link margin analysis/planning toolsets;
g. Familiarity with and use of:
i. C#, C++, Adobe CFML (Coldfusion Markup Language), SQL (Structured Query Language);
ii. Microsoft SQL Server;
iii. Windows Authentication/Authorization methods.
M-5.3 Technical Subfactor 3 - Mission Operations
This subfactor primarily focuses on SOW Section 4.2, Test Support Systems and SOW Section 5., Mission Focus.
The Government will evaluate the extent to which the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute product development, sustainment and integration, including:
1) Offeror demonstrates experience in the design, development/sustainment of flight test execution tools such as a Mission Operations capability utilizing legacy commercial off the shelf products and/or development of new software/hardware. Experience with flight test mission support requirements and establishing program schedules necessary to design and implement development of new capabilities.
2) Offeror demonstrates experience and the technical competencies to acquire and process critical flight test data (telemetry, radar, optical, etc.), record and distribute in real-time across the MDA or similar communications network. Emphasis is placed on bandwidth management/compression, data tagging to support sensor cueing/pointing for range and mobile sensors at primary and remote execution nodes.
3) Offeror demonstrates experience in planning and executing comprehensive flight test data architectures and provide real-time/non-real time situational awareness displays at primary and remote execution nodes to support high-fidelity data driven displays, video relay, mission voice nets and countdown clock displays across the MDA or similar communications network.
M-5.4 Technical Subfactor 4 – Telemetry Operations
This subfactor primarily focuses on SOW Section 4.2, Test Support Systems and SOW Section 5., Mission Focus.
The Government will evaluate the extent to which the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute product development, sustainment and integration, including:
1) Offeror demonstrates expertise and experience to acquire telemetry data from multiple sources, decommutate/process telemetry from target and interceptor telemetry streams, record, reduce telemetry to critical key parameters and disseminate real-time across the MDA or similar communications network necessary to support flight test launch operations.
2) Offeror demonstrates experience and the technical capability to develop target health and status displays which support real-time launch decision authority and range safety assessment.
3) Offeror demonstrates the technical capability to operate, indentify, report and resolve anomalies with government furnished equipment for global positioning system data supporting mission analysis and range safety solutions.
4) Offeror demonstrates capability in the planning and execution of complex flight test architectures using a systematic systems engineering process to collect quantifying MDA BMDS weapon system performance parameters.
M-5.5 Technical Subfactor 5 – Truth Analysis
This subfactor primarily focuses on SOW Section 4.4, Truth Analysis and SOW Section 5., Mission Focus.
The Government will evaluate the extent to which the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute Truth Analysis activities, including:
1) Offeror demonstrates experience and technical capability to develop best estimate trajectories (BETS) for all interceptor and target objects, instrumented or un-instrumented.
2) Offeror demonstrates experience and technical capability to develop BETS in multiple reference frames and formats.
3) Offeror demonstrates experience and technical capability to perform both Infrared (IR) and radar frequency phenomenology analysis.
4) Offeror demonstrates experience and technical capability to identify, report, and resolve anomalies seen in Truth analysis activities.
M-5.6 Technical Subfactor 6 – Library Operations
This subfactor primarily focuses on SOW Section 4.1, Library Operations and SOW Section 5., Mission Focus.
The Government will evaluate the extent the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to execute Library Operations across the MDDC Program, including:
1) Offeror demonstrates experience and technical competence to manage and operate a technical library with >100,000 different data items in a variety of media types (i.e.: CD, DVD, tapes, paper, etc.).
2) Offeror demonstrates experience and technical competence to distribute data electronically and physically.
3) Offeror demonstrates experience and technical competence to maintain accountability of data items IAW DoD and MDA security policies and guidance.
M-6.0 FACTOR 2 - MANAGEMENT
M-6.1 Management Subfactor 1 - Team
This subfactor primarily focuses on SOW Sections 2., Management; SOW Section 3., Mission Assurance; SOW Section 4., Operations and Sustainment; SOW Section 5., Mission Focus; SOW Section 6., Security; and SOW Section 7. Special Provisions.
The Government will evaluate the extent the Offeror’s proposal clearly identifies a Team and framework including subcontractors necessary to successfully execute the MDDC Program SOW, manage risk and provide flexible, responsive, innovative, and efficient MDDC Program products and operations in the following areas:
1) Offeror demonstrates a team and framework including Offeror’s plan for the prime to perform at least 50% of the effort and use of subcontractors that details roles, lines of authority, and the management and technical communication process that addresses the MDDC Program SOW as a whole.
2) Offeror describes key positions within the organizational structure that can support the requirements of the SOW, their planned responsibilities, and details their experience most applicable to the SOW.
M-6.2 Management Subfactor 2 - Management Approach
This subfactor primarily focuses on SOW Sections 2., Management; SOW Section 3., Mission Assurance; SOW Section 4., Operations and Sustainment; SOW Section 5., Mission Focus; SOW Section 6., Security; and SOW Section 7. Special Provisions.
The Government will evaluate the extent the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s team has the capability and an approach, including risk, to organize resources to most efficiently and effectively manage contract execution and mitigate program risk in the following areas:
1) Offeror demonstrates a program-wide approach to managing technical, performance, cost, and schedule risk.
2) Offeror demonstrates a planned process to organize, staff, and allocate resources to meet the SOW. Offeror identifies an approach for recruitment and retention to ensure personnel are in place and trained.
3) Offeror demonstrates their approach to provide a crossed-trained work force for SOW efficiencies.
4) Offeror demonstrates their approach to adding first and second tier subcontractors during contract performance to meet the SOW.
5) Offeror demonstrates their risk management approach to identify, track, and mitigate program risk.
6) Offeror demonstrates their understanding of the scope and interaction of activities within the MDDC Program by providing a Contract Work Breakdown Structure (CWBS) and CWBS dictionary that reflect the MDDC program.
M-6.3 Management Subfactor 3 - Programmatic Execution Approach
This subfactor primarily focuses on SOW Sections 2, Management; SOW Section 3., Mission Assurance; SOW Section 4., Operations and Sustainment; SOW Section 5., Mission Focus; SOW Section 6., Security; and SOW Section 7. Special Provisions.
The Government will evaluate the extent the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s Team has the capability to provide a Management Plan/System for effective planning and control of resources, including risk, and the process for accounting and collecting costs for the entire contract, separate tasks, and ACRNs to accomplish multiple and complex tasks and/or task orders simultaneously.
M-6.4 Management Subfactor 4 – Transition
This subfactor primarily focuses on SOW Sections 2., Management; SOW Section 3., Mission Assurance; SOW Section 4., Operations and Sustainment; SOW Section 5., Mission Focus; SOW Section 6., Security; and SOW Section 7. Special Provisions.
The Government will evaluate the extent the Offeror’s proposal states clearly and provides credible evidence that the Offeror’s Team has the capability and an approach, including risk, to provide a plan and resources to work with the incumbent contractor(s) during the transition period to maintain all MDDC Program mission and SOW requirements and to complete the transition period within the minimum time and cost in the following areas:
1) Offeror demonstrates the ability to transition resources and personnel to this contract required to perform the MDDC Program mission and SOW requirements.
2) Offeror demonstrates a process to work with the incumbent contractor(s) to smoothly transition the MDDC Program products / operations.
3) Offeror demonstrates a realistic schedule, which includes key milestones with metrics to measure progress, to successfully transition all tasks within a designated transition period of no more than 45 days.
4) Offeror demonstrates a phase-in schedule that would obtain the appropriate staffing levels, skill mix, expertise, security clearances, and certifications to provide adequate trained, certified, and cleared personnel.
M-7.0 FACTOR 3 - PAST PERFORMANCE
The Government will conduct an assessment of the Offeror’s, team members’, major and/or critical subcontractors’ and/or major and/or critical subsidiaries’ past performance. A major subcontractor/subsidiary is defined as one performing $3M or more each year of the basic and option contract period effort (excluding ODC and Travel). A critical subcontractor/ subsidiary is one whose performance on the awarded contract is such that if it fails, could significantly impact program success. A key subcontractor is defined as one that is a major or critical subcontractor/subsidiary. Past performance regarding predecessor companies or key subcontractors, and/or subsidiaries that will perform critical aspects of the requirement will be considered the same as past performance information of the principal Offeror.
The purpose of this assessment is to determine the Government’s confidence in the Offeror’s probability of successfully performing the required effort based on the demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. Past performance is an integrated assessment of recency, relevancy, and quality. The Past Performance Evaluation Team will evaluate all contracts submitted by the Offerors in their Volume III Past Performance for recency, using the criteria in paragraph 7.1 below, and relevancy, using the Relevancy Criteria Definitions in paragraph 7.2. The Past Performance Evaluation Team will evaluate recent and relevant past performance history and each Offeror will receive a single Performance Confidence Assessment for the Past Performance Factor using the ratings described in the table provided in paragraph 7.4.
In conducting this assessment, the Government reserves the right to use past performance information provided by the Offeror, obtained from questionnaires tailored to the circumstances of this acquisition, and data obtained from other sources available to the Government, to include, but not be limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
M-7.1 Recency The Government will only consider recent work, which is defined as work performed during the five-year period preceding the date of solicitation release. Note: If any part of the performance falls within the above timeframe, the contract in its entirety may be evaluated for past performance.
M-7.2 Relevancy If the past performance information is recent, as defined in paragraph 7.1 above, the relevancy assessment will be conducted on past Offeror contracts. Relevancy , as it pertains to past performance information , is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance. This area demonstrates the depth and breadth of relevant experience of the Offeror, including major or critical subcontractors and/or subsidiaries. Relevancy for the Offeror’s past contracts will be assigned in accordance with the definition outlined in the table below. The Past Performance Evaluation Team will conduct an in-depth review and evaluation of all performance data obtained to determine how closely the work performed under those efforts relates to the proposed effort. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, major or critical subcontractors and/or subsidiaries whose contract is being reviewed and evaluated. Higher relevancy will be assessed for contracts that are most similar to the effort, or portion of the effort.
Table 4: Past Performance Relevancy Ratings
| Rating |
| Definition |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
M-7.3 Quality Assessment The quality assessment is an evaluation that determines how well the Offeror performed on past contracts. The Quality Assessment ratings are set forth in the past performance questionnaire. The Past Performance Evaluation Team will review this past performance information and determine the quality and usefulness as it applies to performance confidence assessment.
M-7.4 Performance Confidence Assessment Based on an integrated assessment of recency, relevancy, and quality, the Past Performance Evaluation Team will then determine and assign a Performance Confidence Assessment for the Past Performance Factor. The Past Performance evaluation will be accomplished by reviewing the aspects of the Offeror’s past performance focusing on the Offeror’s history of providing its customers with a quality product/service on contracts of similar size, complexity and scope that was delivered within budget and on schedule. This rating will represent an overall assessment of Offeror’s past performance. Offerors without a record of recent and relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance and, as a result, will receive an "Unknown Confidence (Neutral)" rating for the Past Performance Factor. A more recent and relevant record of favorable performance will result in a higher Performance Confidence Rating than a less recent and/or relevant record of favorable performance. A record of exceptional or very good performance will be considered more advantageous to the Government than a record of “Unknown Confidence (Neutral)”. In performing the past performance evaluation, each Offeror will be assigned one of the following confidence ratings:
Table 5: Performance Confidence Assessments
| Rating |
| Definition |
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
| Satisfactory Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort. |
| No Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
M-7.5 Adverse Past Performance Adverse past performance information is defined as past performance information that supports a less than satisfactory rating on any evaluation aspect or verifiable unfavorable comments received from sources without a formal rating system. When relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any corrective actions taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and to evaluate their effectiveness.
In accordance with FAR 15.306(b)(1)(i), communications must be held with any Offeror whose adverse past performance information is the determining factor preventing it from being included in the competitive range, unless the Offeror has previously had the opportunity to comment on such information. Furthermore, the contracting officer must discuss adverse past performance with each Offeror still being considered for award. See FAR 15.306.
M-8.0 FACTOR 4 – COST/PRICE
Evaluation of an Offeror’s proposal shall be based on the information presented in the proposal and information available to the contracting office from sources deemed appropriate. Sources typically considered include the Defense Contract Audit Agency, Defense Contract Management Administration offices, and other contracts with same firms for similar items or services, and known commercial sources.
M-8.1 Government Evaluation The cost area is comprised of an assessment of reasonableness, cost realism, and probable cost. The Probable Cost will be presented to the Source Selection Authority. Cost/Price will not receive a color rating. The Government will evaluate each Offeror’s cost/price proposal using one or more of the techniques described in FAR 15.404 to determine the Probable Cost to the Government of successfully completing the contract using the Offeror’s unique approach. Cost/Price will be assessed in accordance with the following criteria:
M-8.2 Affordability An unaffordable proposal may be eliminated from consideration for award if the Contracting Officer and the SSA determines elimination to be in the best interest of the Government.
M-8.3 Price Reasonableness Price Reasonableness will be determined by comparison of the competitively proposed Evaluated Target Cost & Fee. In the event the Government determines competition was not adequate for any reason, than proposals will be evaluated to assess the reasonableness using one or more of the techniques described in FAR 15.404.
M-8.4 Realism The burden of proof for cost realism rests with the Offeror. Cost realism analysis is the process of independently reviewing and evaluating specific elements of each Offeror’s proposed cost estimate to determine whether the estimated proposed cost elements are realistic for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the unique methods of performance and materials described in the Offeror’s technical and management volumes.
The Government will determine the probable cost of performance for those efforts, taking into consideration the Offeror’s technical and management approaches proposed, unique business methods, operating procedures, and practices. The probable cost may differ from the proposed cost and will reflect the Government’s best estimate of the cost that is most likely to result from the Offeror’s proposal. The probable cost before fee is determined by adjusting the Offeror’s proposed cost, when appropriate, to reflect any additions or reductions in cost elements based on the results of the cost realism analysis. The probable cost fee will be the proposed target fee adjusted in accordance with the incentive fee adjustment formula to reflect the Government’s share at probable cost without fee.
M-8.5 Probable Cost Probable Cost consists of the Government’s estimate of the realistic cost plus the Government’s share of the fee at this cost to successfully accomplish all CPIF CLINs including option CLINs. The Government will adjust the proposed target incentive fee in accordance with the incentive fee adjustment formula. The Probable Cost will be presented to the Source Selection Authority (SSA). The SSA will consider the Probable Cost when determining best value.
M-8.6 Unexplained Price Reductions For purposes of this acquisition, the Government considers any type of price reduction that is unexplained, including any identified as a management challenge, to be unreasonable. An unexplained price reduction may adversely affect an Offeror’s risk rating under the Management and Technical subfactors.
M-8.7 Unbalanced Pricing The Government may reject an offer as unacceptable if the price is materially unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques.
File details come from the government source that posted it. Updated .