RFP_3.5.2018.docx
DOCX document 160 KB Posted
- Attached to
- DTRA - AGENCY WIDE IT SUPPORT SERVICES
- Solicitation number
- HDTRA118R0002
- Issued by
-
Defense Threat Reduction Agency
About this file
Solicitation - HDTRA1-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDTRA118R0002
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
CPFF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
Period of Performance for task orders will be specified in individual orders issued hereunder.
FOB: Destination
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
FFP
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
CPAF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
IT Service Provisioning and Operations
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Cybersecurity & Computer Network Defense
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Test, Transition, & Integration Support
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of contract award.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Mission Essential Hardware/Software
COST
O&M FUNDING ONLY – No fee
Performance period: 5 years from date of contract award.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Mission Essential Hardware/Software
PDW FUNDING ONLY – No fee
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Mission Essential Hardware/Software
R&D FUNDING ONLY – No fee
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
ODCs
CTR FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
ODCs
O&M FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
ODCs
PDW FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
ODCs
R&D FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Travel
CTR FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Travel
O&M FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Travel
PDW FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Travel
R&D FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
CDRLs
Contract Data Requirements List (CDRLs) Not Separately Priced (NSP)
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPFF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPFF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPFF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPFF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
FFP
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IIT Service Provisioning and Operations |
FFP
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
FFP
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
FFP
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPAF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPAF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPAF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| IT Service Provisioning and Operations |
CPAF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPFF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPFF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPFF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
Period of Performance for task orders will be specified in individual orders issued hereunder.
UNDEFINED
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPFF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
FFP
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
FFP
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
FFP
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
FFP
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPAF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPAF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPAF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Cybersecurity & Computer Network Defense |
CPAF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPFF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPFF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPFF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPFF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
FFP
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
FFP
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
FFP
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
FFP
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPAF
CTR FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPAF
O&M FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPAF
PDW FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Test, Transition, & Integration Support |
CPAF
R&D FUNDING ONLY The contractor shall provide services and support as set forth in Attachment 1, Statement of Objectives (SOO). Specific work and the total amount shall be defined in individual task orders issued pursuant to FAR 52.216-18, "Ordering," and IAW the task order Statement of Work (SOW) or Performance Work Statement (PWS) and associated Contract Data Requirements List (CDRL), DD Form 1423-1.
Performance period: 5 years from date of Option Exercise.
MAX COST
BASE FEE
SUBTOTAL MAX COST + BASE
MAX AWARD FEE
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Mission Essential Hardware/Software |
COST
O&M FUNDING ONLY – No fee
Performance period: 5 years from date of Option Exercise.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Mission Essential Hardware/Software |
COST
PDW FUNDING ONLY – No fee
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Mission Essential Hardware/Software |
COST
R&D FUNDING ONLY – No fee
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| ODCs |
COST
CTR FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| ODCs |
COST
O&M FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| ODCs |
COST
PDW FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| ODCs |
COST
R&D FUNDING ONLY – No fee on ODCs
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Travel |
COST
CTR FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Travel |
COST
PDW FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Travel |
COST
O&M FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Travel |
COST
R&D FUNDING ONLY – No fee on Travel. All travel to be conducted IAW FAR Part 31.205-46.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| CDRLs |
Contract Data Requirements List (CDRLs) Not Separately Priced (NSP)
MAX COST
Section C - Descriptions and Specifications
SECTION C
This is an Indefinite Delivery/ Indefinite Quantity (ID/IQ) single award contract that shall provide Core Information Technology Services and Support (ITSS) required by the Defense Threat Reduction Agency (DTRA). The Government intends to award a single award contract and the ordering period will contain a five (5) year base period with an optional ordering period of five (5) years for a total of ten (10) years. The minimum order guarantee is $50,000.00. The aggregate total contract award under this ID/IQ shall not exceed $435,000,000.00.
SPECIFICATIONS
The North American Industry Classification System (NAICS) for this acquisition is 541513: Computer Facilities Management Services.
The majority of the tasks will be performed at the Defense Threat Reduction Center, 8725 John J. Kingman Road, Fort Belvoir, VA 22060-6201, however; DTRA maintains a global mission, and contractor personnel may be required to work at locations other than Fort Belvoir. DTRA relies on distributed operations between the NCR and DTRA Albuquerque, NM. For situational reasons, contractor personnel may work at an alternate location/worksite using Government Furnished Equipment (GFE). Details regarding place of performance will be further defined at the individual task order level.
Refer to Section J, Attachment 1 for the Statement of Objectives (SOO).
Section D - Packaging and Marking
SECTION D
(a) All data contained in Exhibits A - U, Contract Data Requirements Lists (CDRLs), DD Form 1423’s delivered under this contract shall be delivered using best commercial practices to meet the packaging requirements of the carrier and to ensure delivery, to the addressees specified on the Data Item Cover Sheet, at destination and in accordance with applicable security requirements.
(b) All data and correspondence submitted to the Contracting Officer shall reference the Contract Number, the CDRL number, and the date submitted.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .