Attachment_4_-_DTRA_ITSS_PWS_for_Task_Order_3_-_Integration_and_Test_Support_Final_Draft.docx

DOCX document 47 KB Posted

Attached to
DTRA - AGENCY WIDE IT SUPPORT SERVICES
Solicitation number
HDTRA118R0002
Issued by

About this file

DTRA ITSS Draft PWS for Task Order 3

View the file

Other files

File Type Posted
HDTRA118R00020002.docx DOCX document
HDTRA1-18-R-0002_Amendment_1.docx DOCX document
HDTRA1-18-R-0002_(Conformed).docx DOCX document
Attachment_5_DD254_HDTRA1-18-R-0002.docx DOCX document
HDTRA1-18-R-0002_(Conformed).pdf PDF
HDTRA1-18-R-0002_-_Responses_to_Questions.pdf PDF
Attachment_12-Pricing_Template.xlsx XLSX spreadsheet
HDTRA1-18-R-0002_Amendment_1.pdf PDF
Exhibit_B_DD_Form_1423_Customer_Surveys.docx DOCX document
Attachment_1_SOO_-_DTRA_Core_IT_Services.docx DOCX document
Attachment_8_-_GPAT.doc DOC document
RFP_3.5.2018.docx DOCX document
Exhibit_H_DD_Form_1423_Cybersecurity_Reports.docx DOCX document
Attachment_7_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Exhibit_F_DD_Form_1423_Master_Government_Furnished_Property_List.docx DOCX document
Attachment_13_Supplemental_Technical_and_Proposal_Support_Data.pdf PDF
Attachment_4_TO_3_PWS_-_Transition_and_Integration_Support_Services.docx DOCX document
Attachment_9_-_NON-DISCLOSURE_AGREEMENT.doc DOC document
Attachment_5_DD254_HDTRA1-18-R-0002.pdf PDF
Attachment_2_TO_1_PWS_-_IT_Service_Provisioning_and_Operations.docx DOCX document
Attachment_6_QASP_-_Agency-Wide_Core_IT_Services_IDIQ_-_2018_02_14.docx DOCX document
Exhibit_E_DD_Form_1423_Informational_and_Training_Materials.docx DOCX document
Attachment_11_-_PPPQ.doc DOC document
Attachment_14_Supplmental_Information_Packet_Final.pdf PDF
Exhibit_G_DD_Form_1423_Lessons_Learned_Report.docx DOCX document
Exhibit_A_DD_Form_1423_Monthly_Status_Reports.docx DOCX document
Attachment_10_-_PPPI.doc DOC document
Attachment_3_TO_2_PWS_-_Cybersecurity_Support_Services.docx DOCX document
Attachment_12-Cost_Proposal_Instructions.xlsx XLSX spreadsheet
Exhibit_D_DD_Form_1423_Change_Management_and_Transition_Plans.docx DOCX document
Exhibit_C_DD_Form_1423_Technical_Analysis_and_Reports.docx DOCX document
Attachment_15_-_ITSS_Draft_RFP_Responses.pdf PDF
Draft_Solicitation_Rev1.docx DOCX document
Attachment_11_-_NON-DISCLOSURE_AGREEMENT.doc DOC document
Exhibit_J_-_Draft_DD_1423_-_A003_-_TO_3_-_Test_and_Integration_-_Plans.pdf PDF
Attachment_7_-_QASP_-_Task_Order_1_Final_Draft.docx DOCX document
Exhibit_K_-_Draft_DD_1423_-_A004_-_TO_1_-_Core_IT_Ops_-_Plans.pdf PDF
Exhibit_L_-_Draft_DD_1423_-_A004_-_TO_2_-_Cyber_-_Plans.pdf PDF
Exhibit_A_-_Draft_DD_1423_-_A001_-_Base_Contract.pdf PDF
Attachment_5_-_Draft_DD254.pdf PDF
Attachment_3_-_DTRA_ITSS_PWS_for_Task_Order_2_-_Cybersecurity_Support_Services_Final_Draft.docx DOCX document
Attachment_2_-_DTRA_ITSS_PWS_for_Task_Order_1-_Service_Integration_Provision_and_Operations_Final_Draft.docx DOCX document
Exhibit_S_-_Draft_DD_1423_-_A006_-_TO_2_-_Cyber_-_Cybersecurity_Reports.pdf PDF
Attachment_6_-_QASP_-_Agency-Wide_ITSS_Base_Contract_Final_Draft.docx DOCX document
Attachment_8_-_QASP_-_Task_Order_2_Final_Draft.docx DOCX document
Attachment_10_-_GPAT.doc DOC document
Exhibit_B_-_Draft_DD_1423_-_A001_-_TO_1_-_Core_IT_Ops.pdf PDF
Attachment_13_-_PPPQ.doc DOC document
Exhibit_R_-_Draft_DD_1423_-_A006_-_TO_1_-_Core_IT_Ops_-_Lessons_Learned.pdf PDF
Exhibit_Q_-_Draft_DD_1423_-_A005_-_TO_3_-_Test_and_Integration_Supt.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTRA Agency-Wide Information Technology Support Services Core IT Services Contract –

HDTRA1-18-R-0002

DRAFT Performance Work Statement (PWS) for Task Order 3; Test and Integration Support

1. Introduction: This PWS provides agency-wide test and integration support to ensure modified, upgraded, and new information technology (IT) capabilities and systems are thoroughly tested and fully integrated into the IT infrastructure to provide DTRA and its partners with secure and efficient IT capabilities and services necessary to perform the critical DTRA mission.

1.1. Mission: The DTRA mission is to safeguard the United States and its allies from global weapons of mass destruction and improvised threats by integrating, synchronizing and providing expertise, technologies and capabilities. The DTRA Information Integration and Technology Services Directorate (I2TS)/Chief Information Officer’s (CIO) mission is to provide the IT services and capabilities necessary for DTRA’s business and mission functions and support transforming how the agency uses knowledge, technologies, and capabilities to meet the DTRA mission.

1.2. Background: The I2TS/CIO is responsible for providing Agency-wide information management services, supporting in excess of 5,000 world-wide Agency customers utilizing Unclassified, Secret, and Top Secret/Special Compartmented Information (TS/SCI) Networks (for a more detailed description of the current networks see Attachment 1). DTRA personnel supporting the Agency’s mission require common IT services in areas such as, but not limited to, help desk support, systems administration, networks and application administration and design, engineering, and architecture development and implementation. Although the functional requirements are similar across the DTRA mission, the activities involved vary widely by specific mission area. Various short and long-term efforts must be undertaken to continually modernize, integrate and secure functions and systems. Continuous IT support must meet the needs of the Agency and other internally (including JIDO) and externally supported customers to include first responders, Combatant Commands (COCOMS) and other U.S. Government entities. The intent is to provide seamless and integrated communications among all supported elements, for the purposes of office automation, data collaboration and knowledge management, support of exercises, experimentation and operational support across three principle security domains: Sensitive but Unclassified (SBU), Secret and Top Secret/SCI. The DTRA mission supports a diverse set of customers and unique mission requirements. As the organization evolves, the demands on information technology (IT) and associated cybersecurity controls will increase accordingly.

The DTRA Integration, Test and Engineering Center (DITEC) provides a focal point for IT innovation, providing IT expertise and technology-based information capabilities to the Agency in support of its business, warfighting, and research and development (R&D) missions and the DTRA IT infrastructure. The principle DITEC infrastructure consists of a distributed suite of systems, networks and applications at the Defense Threat Reduction Center (DTRC). Components of the DITEC include the DTRA Experimentation Laboratory (DEL), the R&D support network, the First Principles Computing Capability (FPCC) and the DTRA IT testing infrastructure. Contractor resources provide the necessary engineering expertise to design/bui1d, operate, manage, and provide enhancements for this infrastructure.

1.3. Scope: In support of the DTRA mission and Information Integration and Technology Services (I2TS) Directorate/CIO priorities, the contractor shall provide the full range of technical expertise and resources to ensure modified, upgraded, and new IT capabilities and systems are thoroughly tested, fully integrated, and seamlessly transitioned into the IT infrastructure. The goal is to provide DTRA partners secure and efficient IT capabilities and services necessary to perform the critical DTRA mission. The contractor shall provide the necessary technical expertise to maintain, operate, manage, and provide enhancements to the DITEC infrastructure.

2. Applicable Documents: The contractor shall comply with all documents listed below as “Mandatory”. Documents listed as “Non-Mandatory” are provided as information only and for use at the contractor’s discretion.

2.1. Mandatory Documents:

2.1.1. DoD IT Security Regulation

2.1.2. DTRA Security Regulation

2.2. Non-Mandatory Documents:

2.2.1. DTRA Strategic Plan

2.2.2. DTRA J6, CIO Information Operations Strategic Plan 2017 - 2020

2.2.3. DTRA Cloud Strategy

3. Performance Requirements: This section of the PWS defines the performance requirements and results against which the government intends to measure the contractor’s performance. In direct support of the I2TS, the contractor shall plan for and support the logical and seamless transition and integration of approved system, software, security, and cloud solutions onto the DTRA IT enterprise and into productive usage with the target end user group(s). This objective includes a technical function where performance and security tests are either validated or accomplished, and a change management function that prepares the environment for the deployment of a new service and, thus, accelerates its adoption and usage. The measure of success in this objective will be based on evidence of compliant performance and security testing, the transparency of the introduction of new services, and the rate of adoption of the new services.

3.1. Performance Requirement #1, Task Order Management. The contractor shall provide the necessary resources to effectively oversee the performance of all requirements defined in this task order. The contractors shall assign a Task Order Lead/Manager (Key Personnel) who will be accountable for the overall performance outcomes identified within this task order. Within this responsibility, the contractor shall develop and implement a quality control and management oversight plan to effectively manage the staff and the performance per the standards established herein. The contractor shall develop and deliver a monthly status report (MSR) per CDRL A001. Performance measures for this requirement are defined in the Performance Requirements Summary (PRS) in Section 5 below and include timeliness of staff on-boarding, timeliness of deliverables, and consistency in meeting other performance measures within this task order.

3.2. Performance Requirement #2, Test Support Services. The contractor shall validate or, if necessary, conduct system level performance and security testing to ensure new or modified systems and capability function as designed and include all DTRA required security features. The objective is to ensure new and modified IT systems/capabilities introduce no new security risks or vulnerabilities, and no performance degradation to the existing DTRA IT infrastructure. The contractor’s test results and recommendations shall be documented and delivered per CDRL A002. It is intended this requirement will be fulfilled by comprehensive testing during the design and development phase of any application/system. However, in selected circumstances, this task may be performed by validation of pervious testing/certification or a combination of validation of pervious testing/certification and in-house testing/validation. Performance measures for this requirement are defined in the PRS below and focus on the number of technical, functional or security related errors discovered during the initial 90 days post deployment.

3.3. Performance Requirement #3, Integration Support Services. The contractor shall support the timely and seamless integration of new or modified capabilities or IT systems into the IT infrastructure. Using an appropriate mix of analysis of the subject design, performance requirements, test results, and, when necessary performing systems level integration testing, the contractor shall ensure new IT systems, if introduced onto the IT infrastructure, will (1) perform as designed, (2) introduce no new security vulnerabilities, and (3) cause no system level performance degradation or interruption. This systems integration may include integrating systems solutions involving multiple performers, suppliers, or developers, and may require integration of systems at geographically disparate locations (CONUS and OCONUS). Integration analysis and recommendations shall be documented and delivered using CDRL A002. Performance measures for this requirement are defined in the PRS below and focus on the number of technical, functional or security related errors discovered during the initial 90 days post deployment.

3.4. Performance Requirement #4, Transition Support Services. In direct support of the IT Services Division, the contractor shall provide the full range of planning and support to effectively transition new capabilities and IT systems introduced to the IT infrastructure. This transition support includes all the resources, planning, and communications (CDRL A003 and A004) needed to support efficient and timely adoption of new capabilities by the targeted end users. This is a support function for the transition and integration services provided in Task Order 001 and will not be independently measured in this task order.

3.5. Performance Requirement #5, DITEC Operations and Maintenance Support Services. The contractor shall maintain and operate the internal unclassified and the R&D test environments. The objective of this requirement is to ensure these test environments continue to appropriately represent the operational DTRA IT environment such that testing in the test environment can be technically and functionally representative. Additionally, the contractor shall ensure the internal unclassified and R&D test environments are reliable and available as needed to support the testing mission requirements. The operations and maintenance of other test environments within the DITEC are outside the scope of this task order. Performance measures for this requirement are defined in the PRS below and focus on contractor’s ability to keep the test environments current relative to the DTRA operational infrastructure, and meet the demands of test schedules based on system availability.

3.6. Performance Requirement #6, Task Order Transition In. The contractor shall plan for and execute a transition-in strategy to provide for the on-boarding of appropriately qualified personnel, with the required DoD security clearances and eligibilities, needed to support a smooth and seamless transition from the incumbent support team to “full performance” within 60 calendar days of task order award. Transition-in includes all staffing activities, as well as the necessary knowledge transfer and capture to ensure “work-in-progress” is smoothly transitioned, and mission support is not interrupted. Performance measures for the first 60 days will be recorded and reported for monitoring purposes, but they will not be used as performance indicators until the completion of the 3rd month of performance. The exception to this suspension of performance measures will be measures associated with this transition-in requirement. The performance measure for this requirement is defined in the PRS below and focuses on the on-boarding of support staff per the transition-in plan included in the contractor proposal.

3.7. Performance Requirement #7, Task Order Transition Out. The contractor shall plan for and support the smooth and seamless transition-out at the end of the performance period. The contractor shall develop and deliver a transition-out plan (CDRL A004) defining their knowledge transfer plan with specific emphasis on transiting work-in-progress. The contractor shall coordinate with the incoming workforce (government or contactor) as necessary to enable a seamless transition with minimum interruption of mission support. The contractor shall remain accountable for performance consistent with the PRS below until the end of the contract period of performance.

4. Deliverables: In support of the requirements in this PWS, the contractor shall develop and deliver a variety of reports, analyses, recommendations, and plans. The specific requirement for content, format, and delivery timing for each deliverable is defined in the Contract Data Requirements Lists (CDRL; DD Form 1423) which will be specifically associated with the PWS paragraph for the corresponding work scope. Unless specifically stated otherwise in the CDRL, all deliverables shall be submitted electronically in either a MS Office compatible or PDF format. The specific format for each deliverable shall be at the contractor’s discretion unless otherwise specified in the CDRL. The following table summarizes the contract deliverables associated with this PWS.

4.1. Deliverables Summary Table

CDRL #
PWS #
Title
Description
Delivery Timing
A001
3.1
Monthly Status Report (MSR)
Provides a summary of the status of activities and plans for the completed month. The MSR will report on the performance metrics in the PRS/QASP, and provide explanations and corrective action plans for any reported metrics that fall below the AQL. Additionally, the MSR will provide financial status reporting to include a summary of expended labor hours (by person and by labor category/ regular and overtime) and Estimates at Complete (EACs). The MSR will also include personnel status to include a summary of staff members transitioning in and out, as well as a summary of the current staffing.
Monthly delivery; NLT 5th working day of the month
A002
3.2, 3.3
Technical Analysis
The contractor shall develop and deliver technical analyses reports as required to support the ongoing network operations, or as requested by the COR.
Delivery, as required.
A003
3.4, 3.7
Plans
The contractor shall develop and deliver Change Management Plans and a Transition-Out Plan
Delivery, as required.
A004
3.4
Informational and training materials
In support of the transition change management, the contractor shall develop and deliver information and educational materials to prepare end-users for the introduction of new services.
Delivery, as required.
A005
9.0
Master Government Property List
The contractor shall maintain and report updates to the Master Government Property List.
Monthly delivery; NLT 5th working day of the month

5. Period of Performance. The period of performance will be one base-year with four one-year options.

5.1. Base: Task order award + 12 Months

5.2. Option 1: To be specified at award

5.3. Option 2: To be specified at award

5.4. Option 3: To be specified at award

5.5. Option 4: To be specified at award

6. Support Hours This task will routinely be performed during normal DTRA business hours although support may be required outside of standard hours based on loss of service and mission impact or Agency need. Normal business hours are Monday through Friday, 8:00 AM to 5:00PM except for the following Federal Holidays:

New Year’s DayLabor Day
Martin Luther King Jr. DayColumbus Day
President’s DayIndependence Day
Memorial DayThanksgiving
Veteran’s DayChristmas

7. Place of Performance/Travel

7.1. Place of Performance: The majority of these tasks will be performed at the defense Threat Reduction Center, 8725 John J. Kingman Road, Fort Belvoir, VA 22060-6201; however, DTRA maintains a global mission and contractor personnel may be required to work at locations other than the NCR. For situational reasons, contractor personnel may work at an alternate location/worksite using Government Furnished Equipment (GFE) with COR approval.

7.2. Travel may be required based on Agency requirements to any DTRA facility world-wide. The Contractor shall provide a detailed estimate of any desired travel in advance to the COR via memorandum or email. Travel costs shall not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the Federal Travel Regulation. All travel shall be approved by the COR in writing via memorandum or e-mail prior to the contractor incurring any travel expenses and prior to any departure.

8. Security: (Reference DD Form 254, DoD Contract Security Classification Specifications) The contractor employees working on this program must be U. S. citizens, and they will require a minimum of a DoD SECRET clearance in order to provide the required support. Selected individuals may require Top Secret or higher clearances (SCI Access). Rationale: All employees performing services on this contract have the potential to access classified systems up to TS-SCI (JWICS) as a normal requirement in the performance of their duties.

The contractor shall comply with the Security Agreement (DD Form 441) including the National Industrial Security Program Operating Manual (NISPOM) and any revision, notice of which has been furnished to the contractor. The contractor's employees performing work under this contract shall be U.S. citizens and be granted appropriate security clearances based on the need for access to specific classified information. That is SECRET clearance based on favorably adjudicated National Agency Check with Law and Credit Check (NACLC) or a TOP SECRET clearance based on Single Scope Background Investigations favorably adjudicated by the Defense Security Service, Defense Industrial Security Clearance Office.

All contractors in privileged user positions must have a completed single scope background investigation (SSB I) in accordance with DODI 8500.2 prior to filling the position. Privileged users are defined as, but not limited to, persons in the following roles or positions: Information Assurance Managers/Officers, supervisors of IT positions, systems administrators, and maintainers of IA-enabled products.

9. Government Furnished Property, Equipment or Material (GFP/GFE/GFM) The Government will provide office space, desks, computers, use of telephone, copiers, faxes, paper, and other administrative materials on-site for personnel assigned to this task order.

9.1. Government Furnished Property for Contractor Use

DTRA may provide Government equipment to the contractor for use offsite. The contractor shall comply with the contract clauses for accountability of Government Property in the possession of contractors.

The contractor shall update the Master Government Property List (MGPL) when any new equipment is issued to the contractor by the government. The MGPL shall include all equipment/property provided to the contractor, including equipment transferred between projects, broken and obsolete equipment, and items purchased outside the United States. The MGPL shall be delivered electronically in a spreadsheet using Microsoft Office Excel. Abbreviations are not allowed. Ninety (90) days prior to contract expiration, the Contractor shall submit a final MGPL suitable for close-out purposes containing use/disposition recommendations. (CDRL A005)

10. Section 508 Contract Data Requirements List (CDRL) deliverables, in Section 4 above, should meet applicable accessibility requirements and should not adversely affect accessibility features of existing EIT technologies. Information, documentation, and support requirements from 36 CFR part 1194 Subpart D have been determined to apply to this acquisition. Solicitation respondents must describe how the information, documentation, and support proposed for Contract Services deliverables will meet at least those information, documentation, and support requirements identified as applicable in the attached Government Product/Service Accessibility Template (GPAT).

11. Performance Requirements Summary (PRS)

Performance Requirement (from Section 3 of PWS)
Performance Standard
Performance Metric
Acceptable Quality Level (AQL)
Source and Frequency of Performance Data
3.1.1 Task Order Management - Staffing
For task order initiation, the contractor shall ensure planned personnel are appropriately pre-screened and onboarded to DTRA per the proposed Staffing Plan.

After the initial transition period, the contract shall ensure staffing is available as required to meet performance requirements, and unplanned staff vacancies are held to a minimum.

Staff Transition Metric = # of planned staff positions fully on-boarded at DTRA / # of staff positions scheduled to be onboarded at end of performance period.

Average Staff Availability Metric (Key Personnel) = (Total hours accumulated within period for Key Personnel) / (# of key personnel positions X available workhours in period) Average Staff Availability Metric (Non-Key Personnel) = (Total hours accumulated within period for Non-Key Personnel) / (# of key personnel positions X available workhours in period) 1st Month AQL > 85% 2nd Month AQL > 95% 3rd Month AQL > 98%

Metric begins after transition period AQL for Key Personnel > 95%

AQL for Non-Key Personnel > 90% Data will be collected from Monthly Status Report and compared to Staffing Plan in the Proposal. Metrics will be as of the cut-off date of the MSR. Metric can be validated using DTRA security records.

Data will be collected from MRS and will be as of the cut-off date of the MSR for each period.

3.1.2 Task Order Management - Deliverables
The contractor shall ensure that all formal CDRL deliverables are generated correctly and submitted on or before the contract specified due date to the addressees indicated on the CDRL.
On-Time Delivery rate = (# of deliverable items delivered on or before the due date within the performance period) / (# of deliverable items scheduled to be delivered within the performance period)

NOTE: on-time deliverable assumes the item is accepted as compliant by the government reviewer. A rejected deliverable will be withdrawn from the delivered count and the metric will be recalculated.

On-Time Delivery Rate AQL > 95%
Data to support this metric will be captured from 100% inspection of CDRL deliverables, and compared to the CDRL delivery dates. Since this task order will have limited number of individual deliverables, the period of performance for this metric will be a rolling 3 month metric (i.e. calculated monthly based on the cumulative data over the most recent three months of performance).
3.1.3 Task Order Management - Quality Assurance
The contractor shall develop and implement a quality assurance program to ensure performance standards in this PWS are consistently met or exceeded.
Overall QA Performance Metric = (sum of all performance metrics in this PRS met or exceeded during the performance period) / Total number of active performance metrics within this PWS during the performance period)
Overall QA Performance Metric AQL > 95%
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
3.2.1 Test Support Services – Effectiveness of testing
The contractor shall validate or, if necessary, conduct system level performance and security testing to ensure new or modified systems and capability function as designed and include all DTRA required security features.
Effectiveness will be measured by tracking the number of errors (service reports generated by users) in the first 90 days post deployment of a new capability or modified system. Fully effective testing would be represented by 0 reported errors (technical + functional + security errors).
AQL < 10 errors
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
3.3.1 Integration Support Services – Effectiveness of Integration support
The contractor shall support the timely and seamless integration of new or modified capabilities or IT systems into the IT infrastructure.
Effectiveness will be measured by tracking the number of errors (service reports generated by users) in the first 90 days post deployment of a new capability or modified system. Fully effective testing would be represented by 0 reported errors (technical + functional + security errors).
AQL < 10 errors
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
3.5.1 DITEC Operations and Maintenance Support Services – Availability to support test requirements
The contractor shall maintain and operate the internal unclassified and the R&D test environments.
DITEC availability as used here relates to the readiness of the DITEC environment to represent the DTRA IT environment appropriately to support required testing events. The measure for this availability will be a raw measure of the number of times test events were declined or deferred due to inadequate configuration of the DITEC.

The standard availability for this metric is 0 times within any 30 day window.

AQL < 2 instances in any 30 day window.
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
3.6.1 Transition-In – Staff Transition Metric
(See 3.1.1 above)