Attachment_7_-_QASP_-_Task_Order_1_Final_Draft.docx
DOCX document 46 KB Posted
- Attached to
- DTRA - AGENCY WIDE IT SUPPORT SERVICES
- Solicitation number
- HDTRA118R0002
- Issued by
-
Defense Threat Reduction Agency
About this file
Draft QASP Task Order 1
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
FOR
DTRA Agency-Wide Information Technology Support Services Task Order 1; IT Service Integration, Provision and Operations
RFP HDTRA1-18-R-0002
1. Purpose of Contract: The contractor shall provide IT service integration, provision, transition, and operations to ensure DTRA and its partners have reliable, secure, and efficient IT capabilities and services necessary to perform the critical DTRA mission. In the performance of this Task Order (TO), the contractor(s) shall provide support services necessary to meet the DTRA Information Integration and Technology Services Directorate (I2TS)/Chief Information Officer’s (CIO) strategic goals consistent with DoD policies and industry best practices. The effective date of the contract is from (insert date) for a base period of five years and one (1) five-year renewable option, thus possibly extending the period of performance to (insert date).
2. Review Responsibilities: TBD will be designated as the Contracting Officer's Representative (COR) for this contract. As COR, TBD is responsible for interfacing with the contractor in the performance of duties such as those set forth below.
3. Methods and Frequency:
3.1 Surveillance will be accomplished in several methods: random basis; weekly, monthly, quarterly and bi-annual reviews. The method used for evaluation will be based upon document reviews, reports, observation, and received customer feedback.
3.2 Timely feedback to the contractor on unacceptable performance will be provided in writing by the COR.
3.3 A summary of any performances that did not meet the terms and conditions of the contract shall be prepared by the COR and forwarded to the Contracting Officer (KO).
3.4 The surveillance report and a summary of the surveillance logs will be prepared by the COR and submitted to the KO annually. The COR may submit out-of-cycle reports to the KO to support claims of unacceptable performance or when there is a significant change in performance that alters the assessment in one or more evaluation areas.
4. Performance Areas:
The following performance areas will be evaluated as described. However, they are not all inclusive, and any service on this contract may be evaluated at any time; all services provided on this contract are subject to inspection and evaluation at any time. Specific performance areas, standards, metrics, acceptable quality levels, and frequency of assessments are shown in the attached QASP Table.
4.1 The contractor will be evaluated on the effectiveness of their task order management. Specifically, the government will evaluate the timeliness of staff on-boarding, timeliness of deliverables, and consistently meeting performance measures in other performance measures within this task order.
4.2 The contractor will be evaluated on their support of IT operations and systems administration as defined in the PWS. Specifically, the government will monitor and evaluate network availability, efficiency, and security.
4.3 The contractor will be evaluated on their ability to effectively support a service desk operation. Specifically, the government will monitor and evaluate the contractor’s performance based on effectiveness, responsiveness, and overall customer satisfaction.
4.4 The contractor will be evaluated on the consistency with which IT applications and assets (software or hardware components of the network) are upgraded, patched, or replaced before they exceed their usefulness and serviceability and impact mission availability or effectiveness. Specifically, the government will monitor and evaluate the contractor’s performance based on consistency and accuracy of applications and asset management reporting.
4.5 The contractor will be evaluated on the consistency with which they support the planning for and integration of cloud solutions and capabilities that become part of the DTRA IT Enterprise. Specifically, the government will monitor and evaluate the seamless integration of and transition to full usage of cloud services and capabilities.
4.6 The contractor will be evaluated on their support to new service integration by performing transition analysis and supporting change management activities associated with the transition and integration of new capabilities into the DTRA IT Enterprise. Specifically, the government will monitor and evaluate the thoroughness of the transition analysis to help minimize realized transition impacts and the effectiveness of change management efforts and the speed of adoption of new systems.
4.7 The contractor will be evaluated on the consistency of support to systems functional and security validation prior to deployment of new capabilities and systems onto the DTRA IT Enterprise. Specifically, the government will monitor and evaluate the on consistent application of validation requirements for newly introduced services or capabilities.
4.8 The contractor will be evaluated on their ability to effectively transition into full performance following task order award. Specifically, the government will monitor and evaluate the on-boarding of support staff per the transition-in plan included in the contractor proposal.
5. Evaluation Criteria:
· Exceptional: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
· Very Good: Performance meets contractual requirements and exceeds some to the Government’s benefits. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective action taken by contractor was effective.
· Satisfactory: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taking by the contractor appear or were satisfactory.
· Marginal: Performance does not meet some contractual requirements. The contractor’s performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
· Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
6. Surveillance Documents: Documentation used and referenced to perform surveillances will consist of Reports, the Performance Work Statement, the Quality Control Plan, Customer Feedback, and the Surveillance Delivery Summary/Performance Surveillance Checklist. Documentation shall include the date, time, and location of the surveillance; applicable remarks to the surveillance; and signature of the COR. Unsatisfactory ratings must be signed by the contractor.
7. Rating: All contractor tasks will be rated as Exceptional, Satisfactory, Marginal, or Unsatisfactory in the Surveillance Delivery Summary/Performance Surveillance Checklist. At the end of the contract or contract order, the KO will collect the Surveillance Delivery Summary/Performance Surveillance Checklist and any supporting documentation and provide an overall rating for each of the performance areas using the evaluation criteria in Paragraph 5 of this plan.
8. Recording Observations: The Surveillance Delivery Summary/Performance Surveillance Checklist will be used to document observations and problems and rate the individual contractor tasks. The Performance Assessment Report (PAR) Form will be used to record each observed performance issue noted, for performance areas identified in Paragraph 4 or any other tasks identified in the PWS. The Surveillance Checklists and PARs become the formal record for reference. The contractor is told each time a performance issue is found during the observations.
9. Potential Unacceptable Performance: The COR must identify the specific service that is unacceptable and the possible causes and ask a number of questions that will likely identify the source of the problem. The COR shall attempt to resolve the problem with the contractor.
9.1 The COR shall forward the original Surveillance Delivery Summary/Performance Surveillance Checklist and the PAR documenting the observation and attempted solution (along with an evaluation of the results) to the KO, when a specific service becomes unsatisfactory during a surveillance period. The surveillance reports will be used to provide an overall rating for the performance areas identified in Paragraph 4 of this plan.
9.2 The contractor shall complete a response to the unacceptable evaluation if requested by the KO or by its own choice.
10. Taking Action:
10.1 The COR shall evaluate the contractor's performance and document any non- compliance, but only the KO may take action against the contractor for an unacceptable rating.
10.2 When the contractor's performance is unacceptable and a formal action is indicated, the COR and KO will determine what action is appropriate for the specific circumstances. The KO will determine the final action.
11. Records: During the performance of the contract, the COR will retain a copy of all Surveillance Delivery Summary/Performance Surveillance Checklists and Performance Assessment Report (PAR) Forms, with performance issues noted. The Surveillance Delivery Summary/Performance Surveillance Checklist and PARs become the formal record for reference. At the end of the surveillance period, the COR will forward all inspection records to the KO for inclusion in the contract file.
QASP Table
| Performance Requirement (from Section 3 of PWS) |
| Performance Standard |
| Performance Metric |
| Acceptable Quality Level (AQL) |
| Source and Frequency of Performance Data |
| 3.1.1 Task Order Management - Staffing |
| For task order initiation, the contractor shall ensure planned personnel are appropriately pre-screened and onboarded to DTRA per the proposed Staffing Plan. |
After the initial transition period, the contract shall ensure staffing is available as required to meet performance requirements, and unplanned staff vacancies are held to a minimum.
Staff Transition Metric = # of planned staff positions fully on-boarded at DTRA / # of staff positions scheduled to be onboarded at end of performance period.
Average Staff Availability Metric (Key Personnel) = (Total hours accumulated within period for Key Personnel) / (# of key personnel positions X available workhours in period) Average Staff Availability Metric (Non-Key Personnel) = (Total hours accumulated within period for Non-Key Personnel) / (# of key personnel positions X available workhours in period) 1st Month AQL > 85% 2nd Month AQL > 95% 3rd Month AQL > 98%
Metric begins after transition period AQL for Key Personnel > 95%
AQL for Non-Key Personnel > 90% Data will be collected from Monthly Status Report and compared to Staffing Plan in the Proposal. Metrics will be as of the cut-off date of the MSR. Metric can be validated using DTRA security records.
Data will be collected from MRS and will be as of the cut-off date of the MSR for each period.
| 3.1.2 Task Order Management - Deliverables |
| The contractor shall ensure that all formal CDRL deliverables are generated correctly and submitted on or before the contract specified due date to the addressees indicated on the CDRL. |
| On-Time Delivery rate = (# of deliverable items delivered on or before the due date within the performance period) / (# of deliverable items scheduled to be delivered within the performance period) |
NOTE: on-time deliverable assumes the item is accepted as compliant by the government reviewer. A rejected deliverable will be withdrawn from the delivered count and the metric will be recalculated.
| On-Time Delivery Rate AQL > 95% |
| Data to support this metric will be captured from 100% inspection of CDRL deliverables, and compared to the CDRL delivery dates. Since this task order will have limited number of individual deliverables, the period of performance for this metric will be a rolling 3 month metric (ie calculated monthly based on the cumulative data over the most recent three months of performance). |
| 3.1.3 Task Order Management - Quality Assurance |
| The contractor shall develop and implement a quality assurance program to ensure performance standards in this PWS are consistently met or exceeded. |
| Overall QA Performance Metric = (sum of all performance metrics in this PRS met or exceeded during the performance period) / Total number of active performance metrics within this PWS during the performance period) |
| Overall QA Performance Metric AQL > 95% |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.2.1 IT Operations and Systems Administration - Availability |
| Given the geographic distribution of the DTRA workforce and the DTRA operational mission responsibility, the IT and telecommunications networks operate on a 24/7/365 bases. The contractor shall operate and maintain the networks to ensure functional access is available to DTRA’s workforce and partners as needed to support mission requirements. |
| Network availability will be measured at the individual network level. |
For each network the metric is calculated as follows: Possible Availability = (# of devices)*(seconds in month) Actual Availability = (Possible Availability) - (sum of all outages in seconds for servers as measured in Remedy by taking Asset Outage records and subtracting the Actual Start Time from the Actual End Time) Availability = Actual Availability/Possible Availability
| Network Availability AQL > 99% |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.2.2 IT Operations and Systems Administration - Efficiency |
| The contractor shall ensure efficiency in the operation of the IT Enterprise by effectively managing network capacity to ensure workload is efficiently balanced. |
| Capacity and balance will be measured as a ratio of workload to capacity of the available infrastructure. The ratio is calculated by tracking average utilization over time of workloads with varying demand, and working from the mean to find the capacity to handle all workloads. |
| To meet the AQL for this capacity metric, the ratio of the workload to the capacity of the available infrastructure shall be less than 95% for each DTRA network |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.2.3 IT Operations and Systems Administration - Security |
| The contractor shall plan for the effective and timely incorporation of OEM and other directed security patches and updates, with minimum service interruption. |
| Time to incorporate will be measured in days after receipt of a directed patch or update. The performance metric will be the average time to incorporate for the performance period. The specific measure will be; |
Average time to incorporate = (date installation and checkout is complete – date of receipt of patch/update) / # of patches/updates completed in the period.
Metrics will be separate for patches/updates received as “urgent” and all others.
There will be two AQLs for this performance requirement;
AQL for Urgent patches/updates < 2 days
AQL for other than Urgent patches/updates < 7 days The contract shall maintain a log of the receipt date/time for all patches and updates. The contractor shall calculate this metric each month and include in the MSR.
| 3.4.1 Service Desk - Effectiveness |
| The contractor shall staff and support the IT Service Desk with qualified and experienced personnel capable of promptly and effectively resolving user service requests. |
| The Effectiveness metric will be based on First Contact Resolution Rate. This metric is calculated as follows: |
First Contract Resolution Rate = # of user service restoration incidents (received during performance period) resolved during the initial contact / Total # of user service restoration incidents within the performance period.
Monthly AQL for First Contact Resolution Rate shall be equal to or greater than 75%.
Beginning with the sixth month of performance, a second metric will be added to represent the most recent cumulative 6-month rate. The rolling 6-month cumulative rate AQL shall be greater than 80% The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
| 3.4.2 Service Desk - Responsiveness |
| The contractor shall staff and support the IT Service Desk with qualified and experienced personnel capable of promptly and effectively resolving user service requests. |
| The metric for prompt response will be based on time to restore service and will use two separate metrics. This metric measures the time it takes from User Service Restoration ticket creation to either full resolution or a work around is in place restoring the user, or users, to normal service operation for a Work Stoppage. |
User Service Restoration Mean Time to Restore/Resolve (MTTR) Executive Support; 4 hours or less.
User Service Restoration Mean Time to Restore/Resolve (MTTR) (non-Executive) Work Stoppage; 8 hours or less.
The AQL for these metrics is 90%.
Thus, the contractor shall meet the stated MTTR performance standards 90% of the time as measured within a performance period.
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
| 3.4.3 Service Desk – Customer Satisfaction |
| The contractor shall plan, implement and maintain a customer survey/feedback function to gather feedback directly from the service desk customer regarding their level of satisfaction with the service provided. Survey responses will be voluntary for customers. |
| The customer survey will be designed using a 5- point scale where a score of 5 is most favorable and 1 is least favorable. The standard of performance shall be maintained at 4.5 or better for customers responding to the survey. |
| The AQL for customer survey will be based on consistently achieving the 4.5 or better standard score at least 95% of the time |
| The customer satisfaction metric will be calculated monthly and included in the MSR. |
| 3.5.1 Applications and Asset Management – consistency and accuracy |
| The contractor shall plan, implement and maintain an effective application and asset management program that integrates people, processes, and technology to allow software licenses and usage to be systematically and accurately tracked, evaluated, and managed. |
| The metric for accuracy will be accuracy rate based on periodic verification checks of software licenses. The metric will be calculated as follows: |
Accuracy rate = (# of records inspected - # of errors identified) / (# of records inspected).
Note: an error could be an unverifiable entry, or the failure to have recorded an entry at time of inspection.
The AQL for this measure will be
Accurate rate > 96%
Sample size and frequency of inspection will be at COR discretion This metric will be based on government random inspection of asset management records.
| 3.6.1 Technical Management – Documenting Processes (command media) |
| Technical management is complimentary to and supportive of requirements defined in 3.2 – 3.4 and not subject to a separate performance measure. |
| 3.7.1 Cloud Management Support – Seamless Integration |
| The contractor shall support the seamless integration and continuing support of the cloud based capabilities without interruption of service capabilities delivered to the DTRA IT customers. |
| The seamless cloud integration metric based on the number of service desk tickets that are determined to have root cause associated with issued of integration and deployment of the cloud service or capability through the DTRA IT Networks. |
The Seamless Cloud Integration Rate = (Number of users who access the new cloud service or application - # of users reporting issues with root cause determined to be integration issues) / Number of users who access the new cloud service or application within the first 60 day.
The performance standard for the Seamless Cloud Integration Rate is 95%, and will be calculated for each new cloud service added to the Enterprise.
Note: the intent is to exclude service tickets associated with user error or unfamiliarity with new or replacement service.
| The AQL will be for the most recent 3- month period; Seamless Cloud Integration Rate is met for all new cloud services introduced and completing their first 60 days of service at least 90% of the time. |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.8.1 New Service Transition Analysis – Thoroughness of Analysis |
| The contractor shall provide the full range of transition analysis necessary to prepare for the successful deployment of new capabilities and services. |
| The seamless new service integration metric based on the number of service desk tickets that are determined to have root cause associated with issued of integration and deployment of the service or capability through the DTRA IT Networks. |
The Seamless New Service Integration Rate = (Number of users who access the new service or application - # of users reporting issues with root cause determined to be integration issues) / Number of users who access the new service or application within the first 60 day.
The performance standard for the Seamless New Service Integration Rate is 95%, and will be calculated for each new service added to the Enterprise.
Note: the intent is to exclude service tickets associated with user error or unfamiliarity with new or replacement service. This metric will include new cloud services as well as non-cloud services.
| The AQL will be for the most recent 3- month period; Seamless New Service Integration Rate is met for all new services introduced and completing their first 60 days of service at least 90% of the time. |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.9.1 Service Validation – Consistency |
| The contractor shall perform systems functional and security testing as required to ensure new systems (services or capabilities) have satisfied all necessary security certifications and functional validations prior to deployment onto the DTRA IT Enterprise. |
| The performance measure for service validation consistency will compare the number of new capabilities or systems presented for deployment onto the network with the number of new systems rejected by the government due to lack of required validation (either security or performance). The calculation will be as follows: |
Service Validation Consistency rate = (# of new systems presented - # of new systems rejected) / # of new systems presented for deployment within the period of performance. (note: since the rate of introduction will vary, this metric will be calculated on actions within the previous 3-month period)
| The AQL for Service Validation Consistency shall be > 95% compliance |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |
| 3.10.1 Transition and Change Management – effectiveness of change management efforts |
| The contractor shall develop transition change management plans as appropriate to properly prepare the end user stakeholders to efficiently adopt the new system with minimum disruption of mission effectiveness. |
| The performance metric for Effectiveness of Change Management will be specific to each transition/deployment of a new system, and will be based on a customer survey targeted to the anticipated user population (identified stakeholders in the 3.7 transition analysis). The simple survey will ask the users to indicate (1) whether they were provided notice and instructions of the new system deployment in advance of the deployment, and (2) the extent to which this advanced notice was useful. |
Contractor shall develop and deliver for government approval, the customer survey before initiating the survey.
| AQL for Effectiveness of Change Management will be 80% of more favorable feedback received in survey. |
| The customer survey metric will be calculated monthly and included in the MSR. |
| 3.10.2 Transition and Change Management – End User Adoption |
| The contractor shall plan for and support the transition of new systems (services or capabilities) introduced to the DTRA network(s) to ensure a smooth deployment of the new system and efficient user adoption of the new system. The performance outcome is to promptly reach the anticipate user volume once the new system is deployed. |
| Based on anticipated user volume from the transition analysis in 3.7, the End User Adoption rate will measure the incremental progress toward reaching anticipated user volume of the newly deployed system. |
End User Adoption Rate = # of unique identifier hits per month / # of new system users defined in the transition analysis.
End User Adoption Rate should grow steadily in the early months after deployment and stabilize when anticipated user volume is reached.
AQL for End User Adoption rate will grow in monthly increments where;
AQL > 35% at end of month 1 (after deployment);
AQL > 50% at end of month 2 AQL > 75% at end of month 3 AQL > 90% after month 4 The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR for each new system deployed.
After the 4th month, or when the rate equals 90% or more, the metric will only be monitored and reported quarterly.
| 3.11.1 Transition and Integration Support - |
| The contractor shall plan for and support the transition of new systems, capabilities, and applications, into the IT enterprise. |
| The performance metric for this requirement will be the same as for 3.7.1 above: |
The Seamless New Service Integration Rate
| The AQL will be for the most recent 3- month period; Seamless New Service Integration Rate is met for all new cloud services introduced and completing their first 60 days of service at least 90% of the time. |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. (reported at 3.7.1) |
| 3.12.1 Transition Lessons Learned – consistent capture |
| The contractor shall plan for, develop and maintain a transition lessons learned repository or library to collect and reuse the positive and negative lessons learned with previous transition activities. |
| Lessons Learned capture rate will measure the instances of post-transition reflections, retrospectives, or after-action sessions as compared to the number of transition activities, where; |
Lessons Learned Capture Rate = # of documented post-transition “retrospectives” / total number of new service transitions from start of task order.
Metric will be a cumulative to date measure.
AQL=95%
This is a cumulative measure and recognizes that not all transitions may not complete the post-transition retrospective but most will.
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR.
| 3.13.2 Transition Lessons Learned – evidence of reuse |
| The contractor shall plan for, develop and maintain a transition lessons learned repository or library to collect and reuse the positive and negative lessons learned with previous transition activities. |
| The Contractor shall propose a logical and meaningful performance measure |
| The Contractor shall propose a logical and meaningful AQL |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR for each new system deployed. |
| 3.13.1 Transition-in – On-boarding progress |
| The contractor shall plan for and execute a transition-in strategy to provide for the on-boarding of appropriately qualified with the required DoD security clearances and eligibilities, needed to support a smooth and seamless transition from the incumbent support team to “full performance” within 60 calendar days of task order award. |
| The performance measure will reuse PRS 3.1.1: |
Staff Transition Metric = # of planned staff positions fully on-boarded at DTRA / # of staff positions scheduled to be onboarded at end of performance period.
1st Month AQL > 85% 2nd Month AQL > 95% 3rd Month AQL > 98%
The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR
| 3.14.1 Transition-out Planning and Support. |
| The contractor shall plan for and support the smooth and seamless transition-out at the end of the performance period. The contractor shall remain accountable for performance consistent with the PRS below until the end of the contract period of performance. |
| Reuse previous metric from PRS 3.1.3: Overall QA Performance Metric = (sum of all performance metrics in this PRS met or exceeded during the performance period) / Total number of active performance metrics within this PWS during the performance period) |
| Overall QA Performance Metric AQL > 95% |
| The contractor shall collect data to support this metric from their QA program and include the calculated metric in the MSR. |