HC102815R0031_QA_1.pdf
PDF 15 KB Posted
- Solicitation number
- HC1028-15-F-0031
- Issued by
-
Defense Information Systems Agency
About this file
This document provides Government responses to all offeror questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Questions_set__4.pdf | ||
| HC1028-15-R-0031-AMD0005.docx | DOCX document | |
| HC1028-15-R-0031-AMD04.docx | DOCX document | |
| HC1028-15-R-0031-AMD03.pdf | ||
| Solicitation_Questions_set__3.pdf | ||
| HC1028-15-R-0031_QA_2.pdf | ||
| Attachment_1__Price_Spreadsheet_AMD02.xlsx | XLSX spreadsheet | |
| HC1028-15-R-0031_AMD_0002.docx | DOCX document | |
| Attachment_4__Installation_Scenario.docx | DOCX document | |
| HC1028-15-R-0031-_AMD_01.docx | DOCX document | |
| Attachment_2_QASP.docx | DOCX document | |
| Attachment_1_Price_Spreadsheet.xlsx | XLSX spreadsheet | |
| Appendix_A_Facilities_Standards.docx | DOCX document | |
| HC1028-15-R-0031.docx | DOCX document | |
| Appendix_C_DIV_23_Instrumentation_and_Control.docx | DOCX document | |
| Appendix_D_Div_25_Integrated_Automation_6_June_13_rev_1.docx | DOCX document | |
| Attachment_5_Additional_Equipment_Scenario.docx | DOCX document | |
| Attachment_7_JA.pdf | ||
| Attachment_6_Repair_Scenario.docx | DOCX document | |
| Attachment_3_DD254.pdf | ||
| Appendix_B_DoDI_8500.2.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC1028-15-R-0031
Building Automation System (BAS) Enterprise-Wide Installation & Maintenance
Questions & Answers_1
Q1 Subfactor #2 has an Incorrect reference to Task 6.10 "Provide New Building Automation
System (BAS) Installations" is given as Task 6.8 on Page 65 of Solicitation.
A1 Technical management approach subfactor #2 mistakenly references task 6.10, the task reference should be task 6.8. The solicitation documentation has been updated.
Note that subfactor 4 has moved to subfactor 3 and subfactor 5 has moved to subfactor
4.
Q2 Subfactor #2 makes reference to Attachment #4 Scenario Document which was NOT supplied at the FBO website.
A2 Attachment 4 was erroneously left off of the FBO package. A solicitation amendment will be completed to upload the document to the FBO posting.
Q3 Subfactor #3 is an exact copy of Subfactor #2. It is recommended that Subfactor #3 refers to Task 6.7 "System Repairs & Replacements, Modifications & Additions with reference to
Attachment #5 Scenario Document for Addition of New Equipment.
A3 Subfactor #3 is a duplicate of subfactor #2 and has been removed from the solicitation.
Q4 Subfactor #5 has an incorrect reference to Task 6.5 and it should refer to Task 6.7 "System
Repairs & Replacements, Modifications & Additions with reference to Attachment #6
Scenario Document for BAS System Repair.
A4 Technical management approach subfactor #5 mistakenly references task 6.5, the task reference should be task 6.7, but attachment #5 and #6 both apply.
Q5 Please let me know if you are willing to grant a one week extension for solicitation #
HC1028-15-F-0031 for the submission of RFIs. We just received information for this solicitation and we???d like the chance to perform a thorough review and ask questions
A5 Currently the Government does not plan to extend the time for questions or proposals
Q6 Line Item # x002 Application Administrator: The Performance Requirements given in
Section 6.2 "Provide Application Administration Services" (Pages 58 to 60) do not mention a requirement to perform these services ONSITE at DISA Denver Headquarters.
Is it acceptable for these services to be provided remotely on a Government-furnished laptop?
A6 The application administrator shall perform the services onsite in Denver unless they are travelling or working an issue after normal business hours for the Denver facility.
Q7 Does this Solicitation have a requirement for the bidder to state a SPECIFIC "Mark-Up" on goods and services supplied?
A7 No. This is a firm fixed price contract therefore the offeror is not required to breakout their costs; however, offerors should be reminded that this requirement is being evaluated utilizing the lowest price technically acceptable methodology.
Q8 Does the Government have a required/recommended Rate of Inflation for the bidder to apply to Labor Rates and Cost of Materials for Option Years 1 through 4?
A8 This is a firm fixed price contract therefore the offeror is not required to breakout their costs nor will the Government provide an inflation rate.
Q9 Is this a follow-on requirement? If so, could you please provide the incumbent contract number for this opportunity? If not, is this a new requirement?
A9 This work was previously awarded by the General Services Administration under contract number GS08T10BPC0003.