Attachment 4_ Installation Scenario
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Questions_set__4.pdf | ||
| HC1028-15-R-0031-AMD0005.docx | DOCX document | |
| HC1028-15-R-0031-AMD04.docx | DOCX document | |
| HC1028-15-R-0031-AMD03.pdf | ||
| Solicitation_Questions_set__3.pdf | ||
| HC1028-15-R-0031_QA_2.pdf | ||
| Attachment_1__Price_Spreadsheet_AMD02.xlsx | XLSX spreadsheet | |
| HC1028-15-R-0031_AMD_0002.docx | DOCX document | |
| HC102815R0031_QA_1.pdf | ||
| HC1028-15-R-0031-_AMD_01.docx | DOCX document | |
| Attachment_2_QASP.docx | DOCX document | |
| Attachment_1_Price_Spreadsheet.xlsx | XLSX spreadsheet | |
| Appendix_A_Facilities_Standards.docx | DOCX document | |
| HC1028-15-R-0031.docx | DOCX document | |
| Appendix_C_DIV_23_Instrumentation_and_Control.docx | DOCX document | |
| Appendix_D_Div_25_Integrated_Automation_6_June_13_rev_1.docx | DOCX document | |
| Attachment_5_Additional_Equipment_Scenario.docx | DOCX document | |
| Attachment_7_JA.pdf | ||
| Attachment_6_Repair_Scenario.docx | DOCX document | |
| Attachment_3_DD254.pdf | ||
| Appendix_B_DoDI_8500.2.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4: Installation Scenario Statement of Work Date: TBD
Building Automation System Upgrade
SITE XYZ123,
Design/Build
Contract Number:
Task Order Number:
1. Customer Points of Contact
a. Primary
| Name: |
| TBD |
Organization:
Address:
Phone Number:
Fax Number:
E-Mail Address:
b. Alternate
| Name: |
| TBD |
Organization:
Address:
Phone Number:
Fax Number:
E-Mail Address:
2. Contract or Task Order Title: Building Automation System Upgrade
3. Background.
3.1 Acronyms
BAS is defined as the Building Automation System.
DISA is defined as the Defense Information Systems Agency
HVAC is defined as Heating Ventilation and Air Conditioning
O&M is defined as Operation and Maintenance
SOW is defined as the Statement of Work
IAW is defined as In Accordance With
3.2 General Narrative
The DISA Enterprise Computing Facility at Mechanicsburg, PA, is located in Building 308 in the center of the installation, Naval Support Activity Mechanicsburg. . Construction of the facility was completed in 1988. The building itself is a two story steel structure with concrete masonry outside walls which are covered with a light colored sheet metal finish. The facility is connected to Building 309, a WWII wooden warehouse that has been converted to an administration facility, by an enclosed passageway, at the ground level, that is commonly referred to as the link. The downstairs of the computer facility houses the major mechanical and electrical systems, a SCIF for the NDE, the building control center, a tape storage area, a loading dock, a main entrance guard area, an atrium, and the main building break room. Both floors of the facility have major restrooms for both sexes. There is one freight elevator in the atrium area. The upstairs of the facility is dedicated to the raised floor spaces. The main computer room is approximately 40,000 ft2. 6,500 ft2 of that is being subdivided to create a SCIF space for the NDE. There are three other small spaces in the upstairs that serve as controlled areas for communications. Four small offices are located immediately adjacent to the upstairs atrium area.
3.3 Existing Electrical
3.3.1 Existing Medium Voltage Electrical System
Utility power is fed to building 308 via the one and only base substation located near the South perimeter fence. Electrical power for the facility is provided via a 12,470-volt primary power service feed directly into the electrical room through an external high voltage automatic transfer switch. There is only one electrical feed coming into the building from an exterior switch located on the east side of the building. The building is supported by a redundant utility configuration, but is ultimately limited to a single feed into the building. The host installation has completed the additional circuit work providing an additional path of site power to the building. When the new feed is connected to the facility, we will not have a single point of failure due to both back up lines in the same physical space.
There are three (P-1, P-2, and P-3) 2500/3333 KVA Westinghouse transformers, Class AA/FF/. Buss duct is 4,000 amps. The transformers are 12,470 delta/480wye. P-1 and P-2 power the “critical load” through the UPS distribution system. P-3 is for the “non-critical” essential load. All three switchbanks have 4,000 amp main breakers.
3.3.2 Existing low Voltage (480 V) Electrical System
A UPS system upgrade was conducted with new equipment coming online in September 2001. Six new Powerware Plus 750kVA modules configured on two primary busses through a System Bypass Module (SBM) which contains five circuit breakers and a static switch. The system design allows the load to be split between the two output distribution systems (busses). The UPS Upgrade Project (FY10), added an additional two (2) 750kVA/675kW modules to each bus to maximize the capacity of the critical bus. Each new module installed separate and complete we-cell batteries to support the minimum battery duration of the system. The new UPS equipment matched the model of the existing UPS equipment in the building. As part of the project, all pending firmware upgrades were installed on the existing modules. The site is now supported with five (5) 750/675kW modules per critical bus to provide a 2N+1 configuration. There is currently enough UPS capacity to allow a hot-tie transfer between the two output distribution systems – meaning that if all UPS modules to one of the critical busses became inoperative, the tiebreaker could be manually closed and the entire critical bus (‘A’ and ‘B’) would be powered by the other critical buss. If the facility load increases to approximately 1800A on each of the output busses, the UPS system will only operate as a parallel-redundant system without the afore-mentioned capability.
The battery system consists of ten strings of C&D Technologies Model XT2LC-23 flooded cell batteries, with each string consisting of 192 cells. Each jar contains 2 cells, for a total of 96 jars per string. The UPS system is rated for 15 minutes of reserve time at the rated output of 750kVA. Each UPS module is equipped with a battery string that is connected to a common DC switchboard. The DC distribution system is divided between two (2) switchboards. The original UPS modules and associated DC switchboard is rated at 6000A, 500VDC and includes a center collector bus with six (6) 2000A breakers. The new UPS modules installed in 2010, include a switchboard rated at 2000A, 500VDC and includes a center collector bus with four (4) 2000A breakers. Each UPS DC feeder breaker contains a shunt trip device that is controlled from the UPS. This provides fault protection for the DC system in the unlikely event that a UPS rectifier fault condition is encountered. This switchboard configuration allows any combination of batteries or UPSs to be online while a battery string or UPS is out of service for maintenance. If utility power and generator power become unavailable, the batteries would support the critical loads until power is restored. An Alber BDS-256XL battery monitoring system (not fully compliant with Facilities Standards) was installed on the existing battery configuration between Sep and Dec 2008.
Each UPS bus has a planned total capacity of 3000kVA. The combined load on the two busses as of Dec 2011 was 1921kVA. Each UPS modified to increase power factor from .8 to .9 was completed in January 2009. As of December 2011, critical “A” UPS bus load is 990kVA/891kW, critical “B” bus load is 931kVA/838kW.
The essential electrical distribution system has two primary distribution buses. Bus ‘P-1’ and Bus ‘P-2’. Each bus feeds 5ea - 750kVA UPS modules that have a common output buss (critical buss A and B). Critical buss ‘A’ and ‘B’ are connected via a normally open tiebreaker. Each critical bus is totally independent of the other. The overall UPS output distribution system is comprised of six (6) output distribution panelboards per critical bus and in turn feeds all of the PDU’s located throughout the raised floor areas.
3.3.3 Generator System
There are five 750 KVA diesel powered emergency generators, model 3512 Caterpillar. They are aligned in a parallel redundant system. There are two Antron 750 KW loadbanks, model #K575D16882, that are permanently mounted and used for testing the generators and individual UPS modules. The generators were installed as a part of the original building construction in 1988.
3.3.4 Fuel System
The generator engines run on diesel fuel. The major reserve tank has a 10,000-gallon capacity. There is only one fuel supply system.
3.4 Existing Mechanical
3.4.1 Chilled Water Supply
The existing chillers and CHW pumps are new as of July 2007. There are 4 each, 540 ton, York, model YKDHDGQ7-CRFS, centrifugal chillers. The chiller system’s redundancy level is at 1080 ton at 2N.The chiller distribution system is run off of redundant chilled water pumps to feed chilled water to the facility cooling system. The distribution for the chilled water is fed to both the first and second floors. The 2nd floor has a loop under the raised floor as well as above the ceiling. The above ceiling loop was installed during the chiller project and the build out of the customer area on the 2nd floor in 2007.
3.4.2 Condenser Water System
The existing condenser towers are new as of July 2007. There are 4 ea. 500 ton, EVAPCO, model AT212-724 cooling towers. These towers have 2ea. 3030 gpm pumps that operate at 2N redundancy. The towers are on the 2nd floor of the facility and are connected together with a main sump which gravity feeds down through the roof to the condenser water pumps and to the chillers. This system is also 2N redundant with only 2 towers and 1 pump required at the current load in the facility; however because of the pipe routing all of the towers are activated when chilled water is required.
3.4.3 Hot Water System
The boiler was replaced with a new boiler in 1997. Heating is provided by a two-pipe hot water circulation system. The boiler is just serving the AHU at this time for comfort heating.
3.4.4 Computer Room Air Handlers
All of the existing or original CRAH units have or will be replaced. The CRAH units for the main computer room on the second floor, rooms 214, 203, and 203A, will be replaced by the end of FY14.
3.5 Existing Controls
In 2007 the chiller plant was updated to Delta controls. Several SKIF’s have been installed in the facility and need to be monitored by the BAS.
The existing controls for the rest of the facility are the existing pneumatics that are original to the facility.
4. Objective (For the Design/Bid/Build project).
Replace all of the original controls and pneumatics.
Bi-directionally interface with the delta controls for the chiller plant.
Monitor the SCIF’s located throughout the facility.
Connect and convert any of the existing controls that are currently not a part of the Delta BAS to it.
Install (3) workstations for the new Delta control system. The location of the workstations shall be coordinated with the site. One of the workstations shall be used for programming and modification of the mechanical operations, the other (2) workstations shall be for monitoring only.
5. Scope.
Replace all of the original controls and pneumatics.
A survey shall be accomplished prior to any submittals associated with this project. All of the information in this document shall be verified for accuracy and the contractor shall be responsible for any changes, location or additional, in equipment that has to be controlled associated with the operation of building 308.
Coordinate with all of the SCIF’s and connect to them the Delta control system to monitor their control system.
Bi-directionally interface with the delta controls for the chiller plant. Contractor shall re-program and add equipment as needed to mirror the control sequence in Ogden and meet the requirements in our Specification section 23 and 25.
6. General Notes.
6.1 General Intent: The resultant of this project will provide DISA with a design package for full demolition and installation (complete with project timelines, specifications, design calculations, drawings, O&M manuals, and training) processed through contracting as a single design contract. Demolition shall include the removal of the chilled water pumps, chilled water piping, valves, fittings, et cetera. Design shall include HVAC and plumbing systems to meet current applicable codes, standards and regulations. Design shall include an air cooled chiller plant, replacement of the existing chilled water pumps, digital controls, and associated piping and fittings.
6.2 DISA has a corporate goal (strengthen environmental & energy management) supporting Executive Order 13148 “Greening the Government Through Leadership in Environmental Management” (E.O. 13148) and Executive Order 13423, “Strengthening Federal Environmental, Energy, and Transportation Management” (E.O. 13423). In accordance with guidance from Executive Order 13423 § VI(A)(7), DISA CSD Facilities Engineering (CD521) intends to reduce the enterprise impact through reduced water consumption intensity (13423 Sections 2(a) & 3(a)(iii)) and reduction of toxic or hazardous chemical usage (13148 Sections 204, 205 and 206 and 13423 Sections 2(e)(i) & 3(a)(vi)).
6.3 All work shall be done in accordance with the latest version(s) and/or edition(s) of the following codes and standards:
1. National Electrical Code (NFPA 70)
1. Standard for Electrical Safety in the Workplace (NFPA 70E)
1. Grounding, Bonding and Shielding for Electronic Facilities and Equipment (MIL STD 188-124B)
1. Millitary Handbook for Grounding, Bonding and Shielding for Electronic Facilities and Equipment (MIL HDBK 419A)
1. National Fire Protection Association (NFPA)
1. International Building Code (IBC)
1. International Mechanical Code (IMC)
1. International Plumbing Code (IPC)
1. Institute of Electrical and Electronics Engineers (IEEE)
1. American Society for Testing and Materials (ASTM)
1. American National Standards Institute (ANSI)
1. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)
1. Unified Facilities Criteria (UFC)
1. DISA “Facilities Standards,” document number DISA CSI 360-95-3 (DISA Facilities Standards)
1. NFPA Life Safety Code
6.4 The codes, standards and publications most current at the date of contract acceptance shall be those referenced for the design.
6.5 DISA Operational States: The installation project shall be completed without any disruption of power to critical IT loads, thus the design shall take constructability into account. The design shall incorporate an installation sequence. Scheduled and coordinated HAZCONs (Hazardous Conditions) may be authorized during which individual power buses or components may be de-energized as long as an alternate power source is still providing critical power loads. (Reference the HAZCON definition provided in the DISA Facilities Standards for complete information). The contractor shall ensure that all HAZCONs are clearly noted in the design sequence of installation provided with the design. The contractor shall ensure that the installation documents include the requirement for the installer to provide a request and receive approval for the HAZCON at least 30 days prior to the HAZCON event. The designer shall ensure that all HAZCONs are clearly noted in the sequence of events provided with the design.
6.6 All technical questions and/or concerns with this SOW or project are to be addressed and answered by the DISA Facilities engineering team and coordinated through the appropriate Contracting channels.
6.7 All measurements on project drawings shall be in United States Customary System Units (USCS).
6.8 All equipment shall be designed/selected with its associated lifecycle from the DISA Facility Standard, Useful Life of Building Components.
6.9 All equipment shall be installed and designed per manufacturer’s recommendations.
6.10 The entire chiller plant for the building shall be rebalanced. That includes the new air cooled plant and all of the water cooled plant, pumps, towers, et cetera.
6.11 All equipment associated with the project must be labeled IAW Facilities Engineering Standards, (See Appendix A)
6.12 Drawings
6.12.1 Record drawings shall have the DISA standard border incorporated into them
6.12.2 The installation contractor shall maintain one complete set of design contractor documents on site during the installation of the project. These documents shall be redlined to record any changes that occurred during the installation process. At the completion of the work, record drawings shall be prepared and submitted meeting the requirements of DISA’s Drawing Configuration Management (CM) Specification (latest version), which includes the submission of AutoCAD drawings in a dwg format.
6.13 Commissioning
The designer shall include the commissioning requirements per the DISA Facilities standard, “Volume 2 – Consolidated Closeout-Commissioning” as part of their design submittal.
6.14 Operation & Maintenance Manuals:
The designer shall provide the correct procedure for creating an operation and maintenance manuals per the DISA Facilities standard, “Volume 2 – Consolidated Closeout-Commissioning” as part of their design submittal so the renovation contractor can provide the proper operation and maintenance manual at the project close-out.
6.15 Electrical
6.15.1 Electrical Safety: All work that requires the opening or internal investigations of electrical equipment is classified by DISA as work on or near energized equipment and any person associated with this work must comply with the attached (see DISA Electrical Safety Program Appendix C) DISA facilities engineering electrical safety program. The designer/contractor shall ensure that this electrical safety requirement is included in the design documents.
6.15.2 Design contractor shall verify all boxes have the capacity for all of the new equipment. If not, the contractor shall upgrade the junction box.
6.15.3 Design shall instruct installer to utilize electrical metal tubing (EMT) for new chiller, control and pump circuits. The installation shall not use any of the existing cable trays in the electrical rooms unless specifically approved by DISA.
6.15.4 All electrical wiring, conduit, et cetera required to properly operate the new equipment shall be part of this contract.
6.16 Training
Construction contractor to provide all required training to use/maintain all new equipment as identified in this SOW. Training shall include a course about the new equipment, taught at the project site within 30 days after completion of the installation for a period of one day. Course shall include:
· Use of the graphical interface
· Configuration, troubleshooting, and diagnostics procedures
· Repair instructions
· Preventative maintenance procedures and schedules
· Testing and calibration procedures (in DISA Facility Standards, Appendix A)
6.17 Warranty
6.17.1 The equipment manufacturer shall provide a minimum 1 year parts and labor warranty on the performance and operation of all new materials and equipment installed in the facility.
6.17.2 All warranty terms shall be subject to DISA review and approval.
6.18 Programming
6.18.1 Programming of the new controllers prior to their arrival to the site is encouraged, but not required. Once the controllers are delivered to the site and connected to the existing network, all programming of the system must occur from the new Delta workstation. At no time shall a BAS vendor connect their laptop to the existing network as this is a violation of DODI 8500.1 and DISA Facilities Standards Division 23.
6.18.2 The contractor shall program and establish security for the new Control software and hardware components as outlined by DISA Facilities Standards Division 23 and Division 25.
6.19 Any blemishes that exist or that are created over the course of the project shall be patched and or painted to match as an item under this project. Any damage incurred to the facility or its supporting systems during this project at the result of the contractor, the contractor shall be responsible to fix. Unless otherwise specified all items shall be installed to match existing.
6.20 Contractor shall use DISA’s specification “BACnet Direct Digital Controls System (DCC) for HVAC, Division 23 and 25” included in Appendix G: Control Specifications. Contractor shall not eliminate or add manufacturer’s to the existing specification. Contractor shall not remove or edit material types. Contractor shall only remove what is not needed from the specification or add items that are not included in the specification.
6.21 All controls, layouts, graphical displays, et cetera, shall be similar to the controls at the Ogden Utah. The only changes shall be those required by DISA or those that would be specific to the site.
7. Specific Tasks.
7.1 Controls
7.1.1 Electrical Systems
The electrical systems described in this section shall be monitored in the most efficient and effective manner to deliver the required information, monitoring, alarming, trending, and graphics. When available, the electrical equipment manufacturer provided communications portal will be utilized as the connection to the equipment unless it is deemed unreliable or inadequate to support the requirements. When the MECHANICSBURG BAS EQUIP REPLACE contractor deems the connection point, unreliable or inadequate a technical solution shall be generated and provided to the DISA facilities engineering team for review and approval prior to the solution being implemented.
7.1.1.1 The BAS shall display, and trend, at a minimum, the following information for all electrical components:
· Volts per phase
· Amps per phase to include neutral
· Power factor
· Kilowatts
· Kilovolt Amperes
7.1.1.2 The BAS shall at a minimum alarm for the following reasons:
· Loss of communication with an electrical device
· Breaker trip
· Alarms as defined by the 10% review
7.1.1.3 The BAS graphics shall display this equipment in an electrical one line fashion with a visual indicator of the components that are active and that are carrying load in the electrical system.
7.1.1.4 The BAS system shall record and provide the following monthly reports that are available for data transfer to a CD disk from the operator workstation.
· Total monthly and yearly kilowatt-hour consumption for the site. This needs to take into account operation on utility power as well as generator power.
· Hours of generator run time
· Data Center PUE
· Quantity and duration of utility failures
· Trend (data and graphically) of loading on all breakers in the switchgear infrastructure
· Energy consumption for rooms 203, 203A, and 214.
7.1.1.5 Computer Room Energy Consumption
The BAS system shall be designed to provide energy consumption, in kWH, for rooms 203, 203A, and 214. The consumption shall include PDU and CRAH loads.
7.1.1.6 Automatic Transfer Switches and Generators
The site has three automatic transfer switches (ATS) and five generator sets. Monitor the makeup air fans and dampers located in the generator room. Monitor the generator day tank for all available alarms, and fuel level.
Monitor the fans on the generator remote radiators and alarm when there is no confirmation of fan operation during generator operation.
Monitor the space temperature in the generator room. Provide a user adjustable alarm that alarms when room temperatures are:
| <40 deg F |
| >95 deg F |
Monitor the blower that is mounted on and designed to cool the internal switchgear components. Alarm when there is a positive loss of airflow through the switchgear that exceeds 5 minutes.
Monitor the switchgear room space temperature. Provide a user adjustable alarm that alarms when room temperatures are:
| <40 deg F |
| >90 deg F |
Monitor and control the switchgear room exhaust fan. Provide an alarm when there is positive confirmation that the exhaust fan has not been operating for five minutes consecutive minutes.
The BAS shall display all generator set engine parameters to included, but not limited to, the engine speed, fuel consumption, coolant temperature, oil temperature, oil pressure, fuel pressure, day tank level, battery voltage, engine control switch position and engine metering hours.
The BAS shall display all generator set electrical parameters to include, but not limited to, the generator voltage, frequency, and main circuit breaker position.
The BAS shall display the ATS position (normal or emergency) along with all available alarms, and electrical data.
7.1.1.7 Site UPS Infrastructure
The sites UPS infrastructure consists of five each UPS modules.
The BAS system shall constantly monitor the loading on A and B bus UPS systems and provide a ‘warning” alarm when the combined load, in kW, of the two systems is greater than 1670kW and provide a critical alarm with the combined amperage of the two systems is greater than 1900kW. The alarm setpoints/thresholds shall be user adjustable.
7.1.1.8 Battery Monitoring
The battery monitoring system shall graphically represent the monitoring systems status by utilizing site visits to gather the information as required to display the battery string, jar, and cell system installed locations. The system shall alarm and graphically display the battery monitoring system as follows:
Data Display and trending
1. Actual voltage, amperage and impedance values for each battery string jar, cell.
Alarm Conditions
1. Green – Normal condition
1. Yellow – string, jar, or cell in trouble condition, supervisory condition, loss of communication, pre alarm
1. Red – string, jar, or cell in alarm
7.1.1.9 Site Critical Distribution Infrastructure
The site has two critical bus switchboards that shall be monitored for loading and to assist in PUE calculation.
The BAS system shall constantly monitor the loading on switchboards and provide a ‘warning” alarm when the combined load, in amperage, of the two switchboards is greater than 1600 amps and provide a critical alarm with the combined amperage of the two switchboards is greater than 1800 amps. The alarm setpoints/thresholds shall be user adjustable.
The BAS system shall constantly monitor the loading on switchboards and provide a ‘warning” alarm when the combined load, in amperage, of the two switchboards is greater than 1600 amps and provide a critical alarm with the combined amperage of the two switchboards is greater than 1800 amps. The alarm setpoints/thresholds shall be user adjustable.
The BAS system shall also monitor panels “UPS Admin” breaker located in panel CP. The BAS system shall alarm when the load in amperage for this breaker exceeds 70% of the breakers rating.
7.1.1.10 Site Main Essential Switchboards for UPS systems A and B
The site has two essential switchboards that support the A and B UPS systems, these switchboards have a central BAS communications portal.
The two switchboards are equipment with MODBUS communication portals.
DISA requires an alarm to be generated by the BAS system when the summation of the current on any one or more electrical phases exceeds 50% of the rated current for one utility transformer.
The BAS system shall constantly monitor the loading on switchboards MDP-A and B and provide a ‘warning” alarm when the combined load, in amperage, of the two switchboards is greater than 3000 amps and provide a critical alarm with the combined amperage of the two switchboards is greater than 3400 amps. The alarm setpoints/thresholds shall be user adjustable.
The BAS system shall record and provide monthly reports that are available for printing and/or data transfer to a CD disk from the operator workstation.
· Trend (data and graphically) of loading on all monitored breakers in the switchboard infrastructure
· Trend of all alarms on breakers in the switchboard infrastructure
7.1.1.11 Site Main Essential Switchboards for Mechanical systems:
The sites essential switchboard that provides electrical support to the mechanical and administrative systems does not currently have a mechanism for monitoring by the BAS. A solution will have to be developed. The switchboard is labeled as:
· Main Distribution Panel –C (MDP-C)
Within switchboard MDP-C and its distribution, there are breakers that support mission essential HVAC components; a solution shall be developed to monitor these breakers for power consumption and assistance with PUE calculations. The MECHANICSBURG BAS EQUIP REPLACE designer shall coordinate with the chiller replacement project to ensure that all mechanical components necessary to provide an accurate PUE are included in either the chiller project or in the MECHANICSBURG BAS EQUIP REPLACEMENT design. They breakers that need to be monitored are:
| CRAC unit breakers |
| Chiller breakers |
| Pumps |
| Cooling Towers |
The BAS system shall provide a ‘warning” alarm when the load, in amperage, of MDP-C is greater than 1800 amps and provide a critical alarm with the amperage of the switchboard is greater than 2000 amps. The alarm setpoints/thresholds shall be user adjustable.
7.1.1.12 PDU Monitoring
The site has 66 PDU’s spread across the computer rooms. Contractor shall verify number and location prior to their bid.
The BAS system shall constantly monitor the a PDU pair and provide a ‘warning” alarm when the combined load, in kVA or kW, of the two zoned PDUs is greater than 80% of the nameplate rating of the smallest PDU in the pair and provide a critical alarm with the combined load of the two PDU’s is greater than 90% of the nameplate rating of the smallest PDU in the pair.
7.1.1.13 Surge Protection Device (SPD) monitoring
As part of the solicitation phase, the MECHANICSBURG BAS EQUIP REPLACE contractor shall evaluate the SPD’s in the utility and generator switchgear enclosures for alarming and system activation. Depending on the findings of the SPD evaluation the MECHANICSBURG BAS EQUIP REPLACE contractor shall develop a solution for monitoring the SPD’s.
7.1.2 Mechanical Systems
7.1.2.1 Air Handlers – Make Up Air Units – Fan Coil Units – Air Distribution
The site currently has (8) air handlers. Seven of which are operational and (1) is a standby.
The design shall incorporate the conversion of all air handlers, fan coil units, VAVs, FTU’s and all associated HVAC equipment from pneumatic to direct digital control.
Provide DDC static pressure sensors and control for the facility.
Provide CO2 sensors and control outside air intake to maintain ASHRAE CO2 guidelines while providing the most energy efficient air distribution.
As part of the conversion from pneumatic to DDC an air balancing study should be completed to ensure that the systems are commissioned successfully. Provide as a pricing option to have an air balancing study performed on the air distribution system.
The original design shows (3) Fan Coil Units with (2) way modulating valves and (3) VAV’s with (2) way modulating valves, and (2) unit heaters. The fan coils are dual temperature and the VAV’s have reheat. Contractor shall conduct a site visit and verify the number of each piece of equipment.
7.1.2.2 Condenser, Hot Water and Chilled Water Make Up and Filtration
Provide metering on the makeup systems for the condenser water, chilled water. Provide alarm that indicates when the systems are replenishing water for longer than two consecutive hours and when the weekly average is greater than 5% of the historical average for a week.
Bi-directionally interface with the delta controls for the chiller plant. Contractor shall re-program and add equipment as needed to mirror the control sequence in Ogden and meet the requirements in our Specification section 23 and 25.
The site has (4) 540 ton chillers, (4) 500 ton cooling towers, (3) chilled water pumps (2 active and 1 standby), and (3) condenser water pumps (2 active and 1 standby).
The site has a single boiler with (2) hot water pumps.
7.1.2.3 Computer Room Air Handler (CRAH) unit monitoring:
The site has approximately 68 CRAH units that require control and monitoring.
The BAS vendor shall evaluate and provide a solution to monitor the sites CRAH units located in the computer rooms. The DISA preferred solution is to incorporate an interface that is provided by the systems manufacturer. If there is no solution available from the manufacturer, the solution must be reviewed and approved by DISA prior to its implementation.
The MECHANICSBURG BAS EQUIP REPLACE ELEC BAS contractor shall provide a method to remotely control the CRAH start and stop via the operator work station.
7.1.2.4 Water Leak Detection Monitoring
The BAS vendor shall provide a solution to monitor the sites leak detection systems. The DISA preferred solution is to incorporate an interface that is provided by the systems manufacturer. If there is no solution available from the manufacturer, the solution must be reviewed and approved by DISA prior to its implementation.
The leak detection system shall graphically represent the leak detection systems status by utilizing the as built documentation to display the leak detection system installed locations. The system shall alarm and graphically display the water leak detection system as follows:
· Green – Normal zone
· Yellow – zone in trouble condition, supervisory condition, loss of communication, pre alarm
· Red – Zone in alarm
7.1.2.5 Exhaust Fans
The site currently has (2) exhaust fans for the restroom ventilation and a battery room exhaust. Contractor shall conduct a site visit and verify the number of exhaust fans.
The MECHANICSBURG BAS EQUIP REPLACE contractor shall obtain control and electrical monitoring of all the exhaust fans. The control schemes for these exhaust fans shall be evaluated for energy efficiency reduction sequence of operations.
The MECHANICSBURG BAS EQUIP REPLACE ELEC BAS contractor shall ensure that the exhaust fans in the battery room shall operate at 1 CFM per ft2 while controlling make up dampers to maintain the battery room temperature at 77 deg F. The design shall eliminate all manual control of the exhaust fans.
8. Performance Standards.
8.1 Electrical Controls
A complete operable BAS, per this document and specifications that is graphically displayed on the operator workstations, commissioned and approved by DISA.
8.2 Mechanical Controls
A complete operable BAS, per this document and specifications that is graphically displayed on the operator workstations, commissioned and approved by DISA.
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Submittal Documents |
| 100% submittal approval |
| 100% Design review. |
8.1 Electrical Controls
| Performance occurs with no required re-work 100% of the time. |
| Routine inspection during installation; 100% completion inspection prior to acceptance. |
| 8.2 Mechanical Controls |
| Performance occurs with no required re-work 100% of the time. |
| Routine inspection during installation; 100% completion inspection prior to acceptance. |
| Test and Balance |
| All air shall be balanced within 10% of the designed/specified airflow value. All water shall be balanced within 5% of the designed/specified gpm. |
| Test and Balance report. |
Table 1 – Performance Standards
9. Place of Performance.
SMC Mechanicsburg 5450 Carlisle Pike, Building 308 Mechanicsburg, PA 17050
10. Period of Performance.
The Period of Performance shall be a total of 180 calendar days from the award of the contact for the design and 180 days after award of the contract to the construction contractor for the 100% design drawings for the construction.
11. Delivery Schedule.
| Task |
| Deliverable Title |
| Format |
| Due Date(s) |
| Distribution/Copies |
| Frequency and Remarks |
| 11.2 |
| Submittals/ |
Construction
| See DISA Commissioning Standards Appendix E |
| 180 days from award of contract |
| Standard Distribution** |
| As needed during site visits |
| 11.3 |
| Record Drawings |
| See Facilities Engineering Standards Appendix A |
| 30 Days after substantial completion |
| Standard Distribution** |
| 30 Days after substantial completion |
1. Reviews and approval will be provided at the design intervals. DISA shall have a minimum of 10 working days from the time they receive drawings and specifications to perform each design review.
1. Progress reports will be provided to the Contracting office via e-mail. Frequency shall be determined during the design and installation period.
** Standard Distribution: Record Drawings
Site: 1E, 2H Denver: 1E, 3H
KO: 1E, 1H
(E = Electronic Copy) (H = Hard Copy) 1.
Table 2 – Delivery Schedule
11.4 Appendixes/Attachments
Appendix A – DISA Facilities Engineering Standards Appendix B – Bldg 308 Floor Plans Appendix C – DISA Electrical Safety Program Appendix D – DISA Labeling Standard Appendix E – DISA Commissioning Standards Appendix F – DISA Drawing Configuration Management (CM) Specification Appendix G – Division 23 and 25 specifications
12. Bid Requirements:
The cost for the project shall be provided on the bid documents as the following:
13.1 BAS Upgrade Design/Build (CLIN 1)
The contractor shall identify all costs associated with the equipment and labor for each item. CLIN, above. This will allow the government a direct comparison of costs associated with this project.
13. Monthly Progress Reports
A monthly report needs to be provided to the COR and TPOC at the end of every month after the award of the project until the project is completed and it shall include the following:
14.1 Invoiced Costs
14.2 Percent of Project Complete (The Design and Installation phase will have separate Percent of Project Completion)
The report shall include a table with the relevant cost and completion percentage values as well as graphs showing costs and percentage of project completion. The report shall also include a schedule that is constantly updated with an anticipated completion date for both the design and the installation phase of the project.
14. Security. UNCLASSIFIED.
Security Classification Requirements: Performance under this contract will involve access to and work in a secure area. The work to be accomplished in this contract is unclassified. Although there will be no generation, creation, processing, storage of, or access to classified material, performance under this contract may involve occasional contact with said material based on the performance location of contract tasks.
Facility Access: Unescorted access to the facilities is strictly limited to Contractor personnel who have a valid contract and a favorably completed NACLC with at least an Interim Secret security clearance, or a finalized Secret security clearance (or higher). Unescorted access, and therefore facility and personnel security investigations, shall not be ordered for convenience purposes to support the performance of this contract.
Contractor personnel without a favorably completed NACLC shall NOT be granted access to the access-controlled locations without a Government-assigned escort.
The Government customer will assign an escort for uncleared Contractor personnel.
A representative of the Government shall be on the premises during the Contractor’s performance of contract services.
Contractor Facility Security Clearance (FCL): If an FCL and personnel clearances are required and the Contractor does not currently hold such, the costs for obtaining these shall be paid or reimbursed by the Government with no markup (for example, using a dedicated cost reimbursement CLIN). Individual clearance investigations are intended to develop long-term, stable employee relationships. The costs for individual clearance investigations for Contractor personnel who are no longer assigned to contract performance within 1 calendar year of submittal of investigation paperwork to the clearing agency (except due to death) will be the responsibility of the Contractor and shall be recovered by the Government through reduction of payments.
No FCL is necessary for this effort. The Government shall assign security escort personnel for Contractor personnel as needed to support the work described.
Statement for Position of Trust Sensitivity Designation: If this is a classified contract with FCL and personnel clearance requirements, the following sample statement is applicable. “This contract provides the following contracted personnel unescorted access to a DISA facility to perform various services. All persons performing these types of services under this contract require a favorably completed National Agency Check with Local Record Check (NACLC) and an Interim Secret clearance granted prior to performance. Required requests for investigation, for each employee without a current, favorable NACLC, will be submitted within 15 calendar days after award of the contract to the local DISA Security Manager for Interim building access determination prior to performance.”
The Contractor shall forward a Visit Authorization Letter (VAL) to the Government Representative for all employees prior to the beginning of performance. The VAL shall be on company letterhead or pre-fabricated form and contain the following information:
1. Contract number with start and end dates
1. Company Point of Contact (POC) and telephone number
1. Government Task Monitor name and telephone number
1. Complete legal name of employee(s)
1. Social Security Number
1. Security Clearance level, date granted, and
1. Adjudication facility name, i.e. DISCO
1. Type of Personnel Security Investigation (PSI) pending or completed
1. Date PSI completed
Physical Security: To control unauthorized entry/penetration during the performance of this contract, the Contractor shall not prop doors open at the perimeter of the computer room controlled area. With the award of this contract, the Contractor accepts responsibility to protect the physical security of the building and prevent unauthorized entry, when prevention of such violation is under the Contractor’s control. A Security Pre-Brief of the Contractors responsibility will be provided upon contract award.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
/// Nothing Follows /// image1.emf