Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Solicitation number
HC1028-15-F-0031
Issued by

About this file

Attachment 2 - QASP

View the file

Other files

File Type Posted
Solicitation_Questions_set__4.pdf PDF
HC1028-15-R-0031-AMD0005.docx DOCX document
HC1028-15-R-0031-AMD04.docx DOCX document
HC1028-15-R-0031-AMD03.pdf PDF
Solicitation_Questions_set__3.pdf PDF
HC1028-15-R-0031_QA_2.pdf PDF
Attachment_1__Price_Spreadsheet_AMD02.xlsx XLSX spreadsheet
HC1028-15-R-0031_AMD_0002.docx DOCX document
HC102815R0031_QA_1.pdf PDF
Attachment_4__Installation_Scenario.docx DOCX document
HC1028-15-R-0031-_AMD_01.docx DOCX document
Attachment_1_Price_Spreadsheet.xlsx XLSX spreadsheet
Appendix_A_Facilities_Standards.docx DOCX document
HC1028-15-R-0031.docx DOCX document
Appendix_C_DIV_23_Instrumentation_and_Control.docx DOCX document
Appendix_D_Div_25_Integrated_Automation_6_June_13_rev_1.docx DOCX document
Attachment_5_Additional_Equipment_Scenario.docx DOCX document
Attachment_7_JA.pdf PDF
Attachment_6_Repair_Scenario.docx DOCX document
Attachment_3_DD254.pdf PDF
Appendix_B_DoDI_8500.2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title. Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services

2. Work Requirements:

· Task 6.1 – Provide Preventative Maintenance Services

· Task 6.2 – Provide Application Administration Services

· Task 6.3 – Provide Ongoing System Documentation

· Task 6.4 – Provide Enterprise Supportworx – Iconics Support

· Task 6.5 – Unscheduled Maintenance, Repair, and Replacement Parts

· Task 6.6 – Emergency Onsite Service Calls

· Task 6.7 – Systems Repairs and Replacements, Modifications and Additions (Technical Requirements)

· Task 6.8 – Provide New BAS Installations

· Task 6.9 – Provide Consulting/Design of New BAS

3. Primary Method of Surveillance: See method of surveillance for specific tasks under Section 5 - Performance Standards.

· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.

· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.

· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.

· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.

The facility manager or alternate facility representative should know when Contractor personnel are performing services in support of the facility, whether routine, emergency, or in support of a Technical Requirement (TR). The Contractor personnel shall sign in to the supported facility IAW established security and visitor protocols, and shall physically notify the facility manager or alternate facility representative of their arrival and departure. As a QA representative for the Government, the project engineer or facility manager may, for any service visit, request the Contractor personnel to demonstrate what work was accomplished during the visit, discuss the condition of the serviced equipment, and/or inspect with the Contractor personnel the services rendered for compliance with guidance and instructions for the specific services. All demonstration/inspections shall be documented with a signed QA form.

Note: Expect to receive GSA approval this week on the updated QA Surveillance Form.

4. Scope of Performance:

The contractor shall provide maintenance and installation services, onsite application administration support, O&M manual updates, enterprise level support from Iconics, contract management and quality control, technical assistance, training, and certifications, accreditations, and authorizations, all within specified timeframes.

Maintenance is defined to include service, including parts replacement, as necessary to restore equipment that is in an inoperable or degraded condition to normal operating effectiveness. The contract reference is Section 5.

5. Performance Standards:

Task

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

Task 6.1 - Provide Preventative Maintenance (PM) Services

Subtask 6.1.2 - Semi-annual PM services
Complete 100% of semi-annual PM services (two (2) times per year) for each BAS
100% of requested task performed
100% Inspection
Subtask 6.1.2 - List of PM tasks
Provide list of planned PM tasks 30 days after award or execution of a option period
100% of requested task performed
100% Inspection
Subtask 6.1.3 - PM visit during heating/cooling season
Complete one annual PM visit/service (per site) coincident with heating/cooling season changeover
100% of requested task performed
Periodic Inspection – Annual
Subtask 6.1.5 - DISA mandatory training
Conduct 100% DISA annual training a minimum of two (2) hours per site
100% of requested task performed
Periodic Inspection – Annual
Subtask 6.1.6 - PM Scheduling
Develop an approved yearly PM schedule 30 days award or execution of a option period
100% of requested task performed
100% Inspection
Subtask 6.1.6 - PM Scheduling
Update and submit the PM schedule as dates change
100% of requested task performed
Periodic Inspection - Quarterly
Subtask 6.1.7 - PM Reporting
Within seven (7) calendar days of a site visit, provide PM Report
100% of requested task performed
100% Inspection
Subtask 6.1.8 - PM QA Report
Within seven (7) calendar days of a site visit, provide signed QA Surveillance Form
100% of requested task performed
100% Inspection

Task 6.2 - Provide Application Administration Services

Task
Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
Subtask 6.2.1 - Application Administration
Provide 100% application administration 24 hours per week
100% of requested task performed
Customer Input
Subtask 6.2.3 - Application Administration
Provide 100% application administration availability 24x7x365
100% of requested task performed
Customer Input
Subtask 6.2.4 - Weekly Activity Report (WAR)
Provide 100% weekly WAR
100% of requested task performed
100% Inspection
Subtask 6.2.5 - Security and uptime
Maintain 90% application security and uptime
90% Accuracy
Periodic Inspection - Quarterly
Subtask 6.2.6 - BAS user validation
Validate 100% of BAS users monthly
100% of requested task performed
Random Inspection

Task 6.3 - Provide Ongoing System Documentation

Subtask 6.3.1 – O&M manuals
BAS O&M manuals updated within 30 days of service, modification, or upgrade to a system or system components
95% of requested task performed
Random Inspection - Quarterly

Task 6.4 - Provide Enterprise Supportworx – Iconics Support

Subtask 6.4.1 - Supportworx renewal
100% availability of Supportworx
100% of requested task performed
100% Inspection

5.25 - Provide Quality Control

Subtask 5.25.1 - Quality Control Plan (QCP)
Provide QC Plan within 30 days of contract award
100% of requested task performed
100% Inspection
Subtask 5.25.2.1 - Quality Control Plan (QCP)
Provide QC Plan update within 30 days of option year
100% of requested task performed
100% Inspection
Subtask 5.25.2
Provide QA form for all PM and TR work.
100% of requested task performed
100% Inspection

Task 6.5 - Unscheduled Maintenance, Repair, and Replacement Parts

Subtask 6.5.1 - Invoices
Replaced parts invoiced 100% monthly
100% Accuracy
Random Inspection
Subtask 6.5.2 - OEM trained and licensed provider
Utilize 100% OEM trained and licensed distributor/installer/service provider
100% Accuracy
Random Inspection

Task 6.6 - Emergency Onsite Service Calls

Subtask 6.6 - Response
Respond to emergency or critical BAS system failures within two (2) hours
95% Accuracy
100% Inspection
Subtask 6.6.2 - Replacement components
Obtain replacement components within eight (8) business hours of notice for repair actions
95% Accuracy
Random Inspection
Task
Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
Subtask 6.6.5.3.3 - OEM trained and licensed provider
Utilize 100% OEM trained and licensed distributor/installer/service provider
100% Accuracy
Random Inspection
Subtasks 6.7.3.12 - Provide new components
New component systems are in good working order, completed in time allotted, in compliance with the TR, and follow DISA facility standards
95% of requested task performed
Random Inspection
Subtask 6.7.12.4 - Remove unused items
Remove all unused devices and conductors from BAS control panels
100% of requested task performed
Random Inspection

Task 6.7 - System Repairs and Replacements, Modifications and Additions (Technical Requirements)

Subtask 6.7.3 - BAS standards
Work accomplished 100% within DISA BAS standards
100% Accuracy
Periodic Inspection - Quarterly
Subtasks 6.7.5- Repairs and replacements, modifications and additions
BAS is in good working order, work is completed in time allotted, in compliance with the TR, and follow DISA facility standards
95% of requested task performed
Random Inspection
Subtask 6.7.5 - Remove unused items
Remove all unused devices and conductors from BAS control panels
100% of requested task performed
Random Inspection

Task 6.8 - Provide New BAS Installations

Subtasks 6.8 - Provide new BAS
New BAS is in good working order, completed in time allotted, in compliance with the TR, and follow DISA facility standards
100% of requested task performed
Random Inspection
Subtask 6.8.6.2 - Systems, Equipment, and Components (SEC) Inventory
Provide SEC Inventory update within seven (7) days of work completion
100% Accuracy
100% Inspection
Subtask 6.8`.6 - SEC Labels
Submit SEC labels for review/approval; label all new SEC within seven (7) days of work completion
100% Accuracy
100% Inspection

6. Mandatory or Regulatory Compliance Items:

The contractor shall provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer’s Representative (COR) and the contracting officer (KO) will evaluate the initial submission. The COR and KO will conduct ad hoc reviews of the contractor’s compliance throughout the remainder of the contract.

7. Acceptable Quality Level (AQL):

Majority of AQLs are 100% due to the critical support provided by the BAS. See Section 5 - Performance Standards for specific AQLs.

8. Evaluation Method:

The COR will document the time of verbal notification to the contractor. The on-site government representative will document and notify the COR and the contractor on the following:

· Random sampling of Preventive Maintenance and 100% inspect of the summary reports of Preventive Maintenance (PM) performed and notification of all firmware updates.

· 100% inspection of all Emergency Maintenance Services.

· Periodic inspection of all system repair and replacements, modifications and additions.

· Periodic inspection of all new system installations

· Periodic inspection of all operation and maintenance documentation.

· Site government representative will acknowledge and concur on a QA Surveillance Form with 100% inspection on all technical requirements work performed for realignment, additions and modifications to security system equipment.

The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the system is restored to full operational status. The COR will confirm the date and time of problem resolution in the record.

9. Incentives (Positive and/or Negative): Both positive and negative performance will be documented in past performance reports/database, (Contractor Performance Assessment Reporting System (CPARS), as appropriate and will be taken into consideration for follow-on work.

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

Enclosure 6, QASP Page 1 of 6 Pages v3 – 21 Apr 2015 QA Surveillance Form

4b. MODEL 4c. SERIAL NO.

ACCEPTABLE UNACCEPTABLE

13c. DATE

14c. DATE

Compliance with Schedule Requirements:

Other Observation: _________________________________________

9. WORK ORDER TIME COMPLETE

(if applicable)

8. WORK ORDER TIME REPORTED

(if applicable)

12. DESCRIPTION OF SURVEILLANCE RESULTS (Note all results, both positive and negative, in qualitative and quantitative terms where possible. Use specific examples, locations, actions, and personnel where possible.)

CD521-2178 (REV 022812)

Incomplete (Document under block 12.)

14a. QUALITY ASSURANCE SPECIALIST

(PRINT NAME)

13a. CONTRACTOR REPRESENTATIVE

(PRINT NAME)

11. OBSERVATION(S)

Quality of Service(s) Provided:

Quality and/or Suitability of Material(s) Used:

Technical Proficiency and/or Supervision of Personnel:

13b. SIGNATURE

14b. SIGNATURE

5. WORK PRIORITY

This line intentionally blank.

xxxxRoutine(Recurring Work) xxxxRoutine Work Order xxxxPriority Work Order xxxxUrgent Work Order

Complete

3. TECHNICAL REQUIREMENT NO. (if applicable)

QUALITY ASSURANCE (QA) SURVEILLANCE

Government Representative's (GR) Observations Form

Instructions: An authorized GR shall complete all applicable portions of the form and obtain an acknowledgement from the Service Provider of the QA observation in block 13. Provide an electronic copy of the completed document to (1) the Service Provider/contract manager, (2) the CD521 Facilities Engineering COTR for the contract, and (3) the contracting office (or assigned Contracting Officer's Representative (COR)).

1. SURVEILLANCE DATE & TIME

2. CONTRACT NO.

10. WORK STATUS (Select One)

4a. SYSTEM SURVEILLED

6. NAME AND ADDRESS OF CONTRACTOR

7. WORK LOCATION/PROJECT

FAS2178 QA Surveillance Form

1 SURVEILLANCE DATE TIME:

2 CONTRACT NO:

3 TECHNICAL REQUIREMENT NO if applicable:

4a SYSTEM SURVEILLED:

4b MODEL:

4c SERIAL NO:

6 NAME AND ADDRESS OF CONTRACTOR:

7 WORK LOCATIONPROJECT:

8 WORK ORDER TIME REPORTED if applicable:

9 WORK ORDER TIME COMPLETE if applicable:

Other Observation:

12 DESCRIPTION OF SURVEILLANCE RESULTS Note all results both positive and negative in qualitative and quantitative terms where possible Use specific examples locations actions and personnel where possible:

13a CONTRACTOR REPRESENTATIVE PRINT NAME:

13c DATE:

14a QUALITY ASSURANCE SPECIALIST PRINT NAME:

14c DATE:

Check Box2: Off

Check Box3: Off

Check Box4: Off

Check Box5: Off

Check Box6: Off

Check Box7: Off

Check Box8: Off

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box12: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off image1.emf

File details come from the government source that posted it. Updated .