Appendix_A_Facilities_Standards.docx

DOCX document 5 MB Posted

Attached to
Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Solicitation number
HC1028-15-F-0031
Issued by

About this file

Appendix A

View the file

Other files

File Type Posted
Solicitation_Questions_set__4.pdf PDF
HC1028-15-R-0031-AMD0005.docx DOCX document
HC1028-15-R-0031-AMD04.docx DOCX document
HC1028-15-R-0031-AMD03.pdf PDF
Solicitation_Questions_set__3.pdf PDF
HC1028-15-R-0031_QA_2.pdf PDF
Attachment_1__Price_Spreadsheet_AMD02.xlsx XLSX spreadsheet
HC1028-15-R-0031_AMD_0002.docx DOCX document
HC102815R0031_QA_1.pdf PDF
Attachment_4__Installation_Scenario.docx DOCX document
HC1028-15-R-0031-_AMD_01.docx DOCX document
Attachment_2_QASP.docx DOCX document
Attachment_1_Price_Spreadsheet.xlsx XLSX spreadsheet
HC1028-15-R-0031.docx DOCX document
Appendix_C_DIV_23_Instrumentation_and_Control.docx DOCX document
Appendix_D_Div_25_Integrated_Automation_6_June_13_rev_1.docx DOCX document
Attachment_5_Additional_Equipment_Scenario.docx DOCX document
Attachment_7_JA.pdf PDF
Attachment_6_Repair_Scenario.docx DOCX document
Attachment_3_DD254.pdf PDF
Appendix_B_DoDI_8500.2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE INFORMATION SYSTEMS AGENCY

P.O. BOX 549

FORT MEADE, MARYLAND 20755-0549

DISA EIS CIRCULAR 360-95-3 12 December 2014

FACILITIES ENGINEERING STANDARDS for Defense Enterprise Computing Centers (DECCs)

1. Purpose. This Circular prescribes policy, assigns responsibilities and provides procedures for Facility Operations and Maintenance, and Infrastructure Design and Equipment Installation that support Department of Defense Information Network (DODIN) and Core Data Center (CDC) Information Technology infrastructure support equipment.

2. Applicability. This Circular applies to DISA and to all activities responsible for the construction and equipment installation projects and the operation and maintenance (O&M) of telecommunications and information processing components of the DODIN and CDC locations that are assigned an operational or direct operational support missions which are equipped with auxiliary power systems (standby generators and Uninterruptible Power Systems [UPS]).

3. Authority. This Circular is published in accordance with the DOD Directive 5105.19, Defense Information Systems Agency (DISA).

4. References. See Enclosure 1

5. Objectives. The objectives of this Circular are to: (1) Ensure a high state of operational performance and redundancy of the DECC facility infrastructure’s critical systems, equipment and components that support the Core Data Center (CDC) locations, (2) Maintain facility infrastructure reliability for operational mission support, (3) Determine and monitor the capability of existing facility infrastructure systems, equipment and components to satisfy operational mission requirements, and (4) Provide operational and technical information to form the basis for timely correction of noted deficiencies.

6. Responsibilities.

6.1 Heads of the military departments and defense agencies ensure compliance with the provisions of this Circular and implement actions to adhere to these standards.

6.2 DISA Principal Director for Enterprise Services (ES) (for the Defense Enterprise Computing Centers), and the DISA Principal Director for Operations (OPS) (for telecommunications facilities in CONUS, Central and South America, and the Central Area [Southwest Asia]) and Commanders of DISA-PAC, DISA-EUR, DISA-CONUS, shall:

6.2.1 Establish guidelines for reporting the results of electric power exercises.

6.2.2 Monitor, within their geographical area of responsibility (AOR), DODIN and CDC compliance with the procedures contained in this Circular.

6.2.3 Provide, as necessary, specific implementing guidance to subordinate DISA activities and O&M agencies to meet unique circumstances within an individual AOR.

6.2.4 Recommend to O&M agencies appropriate corrective actions for noted deficiencies in facility infrastructure critical systems and equipment.

6.2.5 Provide support and direction, as needed, to resolve scheduling conflicts with operational requirements created by facility engineering activities and operational procedures.

6.3 Core Data Center (CDC) Commanders and Chiefs shall:

6.3.1 Ensure that the prescribed inspections, tests, and exercises, described in the facility standards, are scheduled and conducted by qualified facility personnel, qualified contractors, or by personnel from the host installation. It is the responsibility of the O&M agency to properly conduct these tests and exercises, or to ensure its agent, in the case of contracted O&M, to do so.

6.3.2 Document, report, and retain the results of inspections, tests, and exercises, as prescribed in the O&M agency’s facility engineering program.

6.3.3 Fully coordinate with subordinate, lateral, higher headquarters, and all connected facilities and local users on dates and times for facility engineering infrastructure upgrade, maintenance and repair projects.

6.3.4 Provide documented results of inspections, tests, and exercises to both the EIS Chief, Facilities Maintenance (ES621), Enterprise Services Directorate and Chief, Quality Management Branch (OP5), Operations Directorate for tracking the trends and analysis of facility operations and maintenance issues.

7. Standards. (See Enclosure 2)

7.1. This DISA Facilities Engineering Standards Circular provides the technical requirements for optimum reliability, system redundancy, operations and maintenance of critical infrastructure and safety within the DISA computing centers.

7.2. The standards at enclosure 2 are formatted in-line with the MasterFormat guide to allow ease of use and direct cross-reference to the engineering, construction and maintenance industry specifications. MasterFormat is a master list of numbers and titles classified by industry standard work results or construction practices, primarily used to organize project documents, operations and maintenance manuals, correlate with detailed cost information and relate drawing notations to specifications. The MasterFormat is produced by the Construction Specifications Institute.

7.3. The standards are based upon the National Electrical Code (NEC), National Fire Protection Association (NFPA), including the Life Safety Code, DOD standards and nationally recognized standards of design and construction.

7.4. The standards provide the minimum requirements for computer center infrastructure redundancy for power and cooling, access raised flooring, fire detection and extinguishing systems, and the safety requirements of the National Electric Code. The standards specify electrical grounding, power, lighting, emergency backup power and redundancy requirements, as well as the criteria for energy management, alternative paths for power supply, ventilation or cooling.

8. Exemptions

8.1 An exemption to comply to the Facility Standards specified in the enclosure may be obtained from the Commanders of DISA-PAC, DISA-EUR, DISA-CONUS, the DISA Principal Director for Enterprise Services, or the DISA Principal Director for Operations, as appropriate. Complete justification must be provided to substantiate the request. Inspections, reporting, and record keeping are still required. In all cases, temporary exemptions shall be revalidated annually.

8.2 The auxiliary electric power system successfully transferred load to the system supported by the intended generator loads and lasted for a minimum of one hour and occurred within 14 days of the scheduled operational test. In this case, the scheduled operational test is not required, although all reporting and record keeping requirements still pertain.

9. Changes. Recommended changes to this Circular, together with full and complete supporting rationale, should be sent to Chief, Facilities Maintenance, Enterprise Services Directorate Attn: Facilities Engineering, (ES521), P.O. Box 4598, Greenwood Village, Colorado, 80155-4598, or e-mail to: disa.denver.esd.list.dl-facilities@mail.mil.

10. Additional Guidance. The Commanders of DISA-PAC, DISA-EUR, DISA-CONUS, DISA Principal Director for Enterprise Services, and divisions within the DISA Principal Director for Operations may provide additional specific implementation guidance to DODIN and CDC locations within their AOR. Such guidance must be provided to Enterprise Information Services Directorate (EIS), Facilities Maintenance (ES621) for approval, prior to publication.

FREDERICK A. HENRY
Brigadier General, USA
Chief of Staff

SUMMARY OF SIGNIFICANT CHANGES. This revision expands the focus from EIS computing centers to include all facility infrastructure critical systems, equipment and components of DISA Core Data Center locations. The standards outline minimum critical infrastructure redundancies, preventive maintenance programs and follows commercial and industry best practices, operational testing and training requirements is included.

*This Circular replaces DISA EIS Facility Standard document 350-195-3, dated 14 December 2012 and must be reissued, cancelled, or certified current within five years of its publication. If not, it will expire 10 years from its publication date and be removed from the D1SA Issuance postings.

OPR: ESD disa.denver.esd.list.dl-facilities@mail.mil

DISTRIBUTION: P

Enclosure 1

REFERENCES

ANSI/NFPA 75, Fire Protection of Information Technology Equipment, “CURRENT EDITION.”

DODI 6055.1, DoD Safety and Occupational Health (SOH) Program, “CURRENT EDITION.”

MIL-HDBK-470A, Designing and Developing Maintainable Products and Systems (Volume I), “CURRENT EDITION.”

MIL-STD-882D, Standard Practice: System Safety, “CURRENT EDITION.”

NFPA 70, National Electrical Code, “CURRENT EDITION.”

NFPA 70B, Recommended Practice for Electrical Equipment Maintenance, “CURRENT EDITION.”

NFPA 70E, Standard for Electrical Safety in the Workplace, “CURRENT EDITION.”

NFPA 110, Standard for Emergency and Standby Power Systems, dated, “CURRENT EDITION.”

UFC 1-200-01 General Building Requirements, with Change 2, “CURRENT EDITION.”

UFC 1-200-02 High Performance and Sustainable Building Requirements, with Change 3, “CURRENT EDITION.”

UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems, with Change 1Revised, “CURRENT EDITION.”

UFC 3-520-01, Interior Electrical Systems, “CURRENT EDITION.”

UFC 3-540-01 Engine-Driven Generator Systems for Backup Power Applications, “CURRENT EDITION.”

UFC 3-550-01 Exterior Electrical Power Distribution with Change 1, “CURRENT EDITION.”

UFC 3-575-01 Lightning and Static Electricity Protection Systems, “CURRENT EDITION.”

UFC 3-600-01 Fire Protection Engineering for Facilities, with Change 3, “CURRENT EDITION.”

UFC 4-020-01 DoD Security Engineering Facilities Planning Manual, “CURRENT EDITION.”

UFC 4-021-02 Electronic Security Systems, “CURRENT EDITION.”

TIA-942, Telecommunications Infrastructure Standard for Data Center, “CURRENT EDITION.”

DISAC 360-95-3

FACILITIES ENGINEERING STANDARDS

Table of Contents

DISA EIS CIRCULAR 360-95-31
Table of Figuresxvii
Table of Attachmentsxix
SPECIFICATIONS GROUP23
General Requirements Subgroup23
Div 01General Requirements23
01 10 00 Summary23
01 11 00 Summary of Work23
01 11 13 Work Covered by Contract Documents23
01 14 00 Work Restrictions23
01 14 13 Access to Site23
01 14 16 Coordination with Occupants24
01 14 19 Use of Site24
01 20 00 Price and Payment Procedures24
01 24 00 Value Engineering24
01 30 00 Administrative Requirements24
01 31 00 Project Management and Coordination24
01 31 13 Project Coordination24
01 32 00 Construction Project Documentation24
01 32 16 Construction Progress Schedule24
01 33 00 Submittal Procedures24
01 33 23 Shop Drawings, Product Data, and Samples24
01 35 00 Special Procedures24
01 35 53 Security Procedures24
01 40 00 Quality Requirements26
01 41 00 Regulatory Requirements26
01 41 13 Codes26
01 41 30 Occupational Health & Safety Requirements and Controls27
01 42 00 References28
01 42 16 Definitions28
01 43 00 Quality Assurance30
01 43 40 Quality Assurance Procedures30
01 43 41 Quality Assurance Personnel (QAP)31
01 43 42 Primary Surveillance31
01 43 42.10 Primary Surveillance Reporting31
01 43 43 Other Surveillance Observations31
01 43 44 Customer Observation Procedures32
01 43 50 Project Closeout Procedures32
01 45 00 Quality Control32
01 45 16 Field Quality Control Procedures33
01 45 50 Project Closeout Procedures33
01 60 00 Product Requirements33
01 61 00 Common Product Requirements33
01 61 13 Software Licensing Requirement33
01 62 00 Product Options33
01 67 00 Facility and Device Labeling and Identification33
01 70 00 Execution and Closeout Requirements33
01 77 00 Closeout Procedures33
01 78 00 Closeout Submittals33
01 78 39 Project Record Documents33
01 80 00 Performance Requirements34
01 81 00 Facility Performance Requirements35
01 81 13 Sustainable Design Requirements35
01 81 16 Facility Environmental Requirements35
01 81 19 Indoor Air Quality Requirements35
01 82 00 Facility Substructure Performance Requirements35
01 82 13 Foundation Performance Requirements35
01 83 00 Facility Shell Performance Requirements35
01 83 13 Superstructure Performance Requirements35
01 83 16 Exterior Enclosure Performance Requirements35
01 83 19 Roofing Performance Requirements35
01 83 25 Modular Component Performance Requirements36
01 84 00 Interiors Performance Requirements36
01 84 13 Interior Construction Performance Requirements36
01 84 16 Stairways Performance Requirements36
01 84 19 Interior Finishes Performance Requirements36
01 85 00 Conveying Equipment Performance Requirements36
01 86 00 Facility Services Performance Requirements36
01 86 10 Planned System Redundancy Levels37
01 86 11 Datacenter Redundancy Requirements38
01 86 11.10 Cost of End-User Downtime39
01 86 12 System Redundancy Performance Requirements39
01 86 13 Fire Suppression Performance Requirements40
01 86 16 Plumbing Performance Requirements40
01 86 19 HVAC Performance Requirements40
01 86 23 Integrated Automation Performance Requirements40
01 86 26 Electrical Performance Requirements41
01 86 29 Communications Performance Requirements41
01 86 33 Electronic Safety and Security Performance Requirements41
01 87 00 Equipment and Furnishings Performance Requirements42
01 87 13 Equipment Performance Requirements42
01 87 16 Furnishings Performance Requirements42
01 88 00 Other Facility Construction Performance Requirements42
01 88 13 Special Construction Performance Requirements42
01 88 13.10 Anti-Terrorism/Force Protection (ATFP) Performance Requirements42
01 88 13.20 Raised (Access) Flooring Performance Requirements42
01 88 13.30 High-Altitude Electro-Magnetic Pulse (HEMP) Hardening Performance Requirements42
01 88 16 Selective Construction Performance Requirements42
01 88 20 Space and System Isolation Design Goals42
01 89 00 Site Construction Performance Requirements43
01 89 13 Site Preparation Performance Requirements43
01 89 16 Site Improvements Performance Requirements43
01 89 19 Site Plumbing Utilities Performance Requirements43
01 89 23 Site HVAC Utilities Performance Requirements43
01 89 26 Site Electrical Utilities Performance Requirements43
01 89 29 Other Site Construction Performance Requirements44
01 90 00 Life Cycle Activities44
01 90 10 Return On Investment (ROI)44
01 91 00 Commissioning45
01 92 00 Facility Operation45
01 92 10 Facilities Work Level Authorities45
01 92 10.10 “Work Order” Services45
01 92 10.20 Other Traditional BOS Services45
01 92 10.30 COTR/ACOTR Responsibilities & Limitations46
01 92 13 Facility Operation Procedures46
01 92 14 Facility Operations – Equipment Lifecycle Estimates47
01 92 15 Administrative Space Planning Considerations47
01 92 20 Facility Operations – Continuity of Operations (COOP)47
01 92 50 Role & Responsibilities of the Facility Manager48
01 93 00 Facility Maintenance49
01 93 11 Facility Equipment Testing Plan49
01 93 13 Facility Maintenance Procedures50
01 93 16 Recycling Programs50
01 93 20 Cleanliness & Condition of Facilities50
01 93 24 Bench Stock52
01 93 25 Critical Spares52
01 94 00 Facility Decommissioning53
01 94 13 Facility Decommissioning Procedures53
01 95 00 Facility Maintenance Automation Systems53
01 95 10 Facility Maintenance Automation Network54
01 95 20 Facility Maintenance Automation Systems Integration54
01 95 30 Facility Maintenance Automation System & Database Design54
01 95 40 Facility Maintenance Automation Reporting Systems & Metrics55
01 95 50 Facility Maintenance Automation Operation55
01 95 60 Automation Systems Security Accreditation Requirements56
01 96 00 Equipment Identification Automation Systems56
01 96 60 Automation Systems Security Accreditation Requirements57
Facility Construction Subgroup58
Div 02Existing Conditions58
02 80 00 Facility Remediation58
02 81 00 Transportation and Disposal of Hazardous Materials58
02 82 00 Asbestos Remediation58
02 83 00 Lead Remediation58
02 84 00 Polychlorinated Biphenyl Remediation58
02 85 00 Mold Remediation58
02 86 00 Hazardous Waste Drum Handling58
Div 05Metals59
05 80 00 Metal Work59
05 80 01 Metal Fastening/Welding59
Div 07Thermal and Moisture Protection60
07 01 00 Operation and Maintenance of Thermal and Moisture Protection60
07 01 50 Maintenance of Membrane Roofing60
07 01 50.13 Roof Moisture Survey60
07 01 50.16 Roof Maintenance Program60
07 01 50.19 Preparation for Re-Roofing60
07 01 50.23 Roof Removal60
07 01 50.61 Roof Re-Coating60
07 01 50.81 Roof Replacement60
07 01 50.91 Roofing Restoration60
07 10 00 Dampproofing and Waterproofing60
07 18 00 Traffic Coatings61
07 30 00 Steep Slope Roofing61
07 33 00 Natural Roof Coverings61
07 50 00 Membrane Roofing61
07 70 00 Roof and Wall Specialties and Accessories61
07 72 00 Roof Accessories61
07 72 33 Roof Hatches61
Div 08Openings62
08 10 00 Doors and Frames62
Minimum size for computer room doorways is a double door entry of 60”x84”.62
08 50 00 Windows62
Computer rooms shall have no windows.62
08 70 00 Hardware62
08 80 00 Glazing62
08 85 00 Glazing Accessories62
08 85 10 Blast Resistant Window Retention Devices62
08 87 00 Glazing Surface Films63
08 87 13 Solar Control Films63
08 87 16 Safety Films63
08 87 53 Security Films63
Div 09Finishes64
09 01 00 Maintenance of Finishes64
Maintenance of finishes shall follow industry best practices.64
09 01 30 Maintenance of Tiling64
09 01 50 Maintenance of Ceilings64
09 01 60 Maintenance of Flooring64
09 01 70 Maintenance of Wall Finishes64
09 01 90 Maintenance of Painting and Coating64
09 01 90.52 Maintenance Repainting64
09 50 00 Ceilings64
09 51 00 Acoustical Ceilings64
09 51 23 Acoustical Tile Ceilings64
09 51 53 Direct-Applied Acoustical Ceilings65
09 53 00 Acoustical Ceiling Suspension Assemblies65
09 53 23 Metal Acoustical Ceiling Suspension Assemblies65
09 60 00 Flooring65
09 62 00 Specialty Flooring65
09 62 01 Conductive Solid Flooring65
09 68 00 Carpeting65
09 68 13 Tile Carpeting65
09 68 16 Sheet Carpeting66
09 69 00 Access Flooring66
09 69 50 Access Flooring Penetrations73
09 69 53 Access Flooring Accessories73
09 90 00 PAINTING AND COATING74
09 91 00 Painting75
09 91 13 Exterior Painting75
09 91 23 Interior Painting75
09 94 00 Decorative Finishing76
09 94 19 Multicolor Interior Finishing76
09 96 00 High-Performance Coatings76
09 96 56 Epoxy Coatings76
Div 10Specialties78
10 40 00 Safety Specialties78
10 43 00 Emergency Aid Specialties78
10 43 13 Defibrillator Cabinets78
10 43 16 First Aid Cabinets78
10 44 00 Fire Protection Specialties78
10 44 13 Fire Extinguisher Cabinets78
10 44 16 Fire Extinguishers78
10 44 16.13 Portable Fire Extinguishers78
Div 11Equipment84
Div 12Furnishings84
12 40 00 Furnishings and Accessories84
12 48 00 Rugs and Mats84
12 48 13 Entrance Floor Mats and Frames84
12 48 13.13 Entrance Floor Mats84
12 48 13.16 Entrance Floor Mat Frames84
12 50 00 Furniture84
12 59 00 Systems Furniture84
Div 13Special Construction84
13 01 00 Operation and Maintenance of Special Construction85
13 01 20 Operation and Maintenance of Special Purpose Rooms85
13 01 21 Operation and Maintenance of Controlled Environment Rooms85
13 01 21.10 Datacenter Modularity86
13 01 21.20 Infrastructure Support Equipment Layout86
13 01 21.30 Hot & Cold Aisle Layout86
13 01 21.40 IT Equipment Rack ‘Strings’ & Rows87
13 01 21.50 Standardized IT Equipment Racks87
13 05 00 Common Work Results for Special Construction87
13 05 01 Handicapped Accessibility Requirements87
13 05 02 Life Safety Code Requirements88
13 05 03 Acoustic Ceiling Fastening89
13 05 04 Friable Materials89
13 20 00 Special Purpose Rooms89
13 21 00 Controlled Environment Rooms89
13 21 01 Firewall-Separated Computer Facilities89
13 21 02 Firewall-Separated Utility Rooms90
13 21 03 Mechanical & Electrical Infrastructure Equipment Rooms90
13 21 50 Datacenter Administrative Areas92
13 21 60 Datacenter Staging Areas93
13 27 00 Vaults93
13 27 53 Security Vaults93
13 40 00 Integrated Construction93
13 48 00 Sound, Vibration, and Seismic Control93
Div 14Conveying Equipment95
14 20 00 Elevators95
Div 21Fire Suppression95
21 01 00 Operation and Maintenance of Fire Suppression97
21 01 10 Operation and Maintenance of Water-Based Fire-Suppression Systems97
21 01 20 Operation and Maintenance of Fire-Extinguishing Systems97
21 01 30 Operation and Maintenance of Fire-Suppression Equipment97
21 08 00 Commissioning of Fire Suppression97
21 10 00 Water-based Fire-suppression Systems97
21 13 00 Fire-Suppression Sprinkler Systems97
21 13 13 Wet-Pipe Sprinkler Systems97
21 20 00 Fire-extinguishing Systems97
21 22 00 Clean-Agent Fire-Extinguishing Systems97
21 24 00 Dry-Chemical Fire-Extinguishing Systems97
21 25 00 Gaseous (Total-Flooding) Fire-Extinguishing Systems97
22 00 00 Plumbing99
22 08 00 Commissioning of Plumbing99
22 40 00 Plumbing Fixtures99
22 45 00 Emergency Plumbing Fixtures99
22 45 13 Emergency Showers99
22 45 16 Eyewash Equipment99
22 45 19 Self-Contained Eyewash Equipment99
22 45 23 Personal Eyewash Equipment99
22 45 26 Eye/Face Wash Equipment99
22 45 29 Hand-Held Emergency Drench99
Div 23Heating Ventilating & Air Conditioning (HVAC)100
23 00 00 Heating Ventilation & Air Conditioning (HVAC)100
23 05 00 Common Work Results for HVAC100
23 05 90 Contractor Coordination with Testing, Adjusting, and Balancing100
23 05 93 System Testing, Adjusting, and Balancing (TAB)100
23 08 00 Commissioning of HVAC100
23 09 00 Instrumentation and Control for HVAC100
23 09 23 Direct Digital Control Systems for HVAC100
23 09 23.13 BACnet Direct Digital Control Systems for HVAC100
23 10 00 Facility Fuel Systems102
23 11 00 Facility Fuel Piping102
23 11 13 Facility Fuel-Oil Piping102
23 11 16 Facility Gasoline Piping102
23 11 23 Facility Natural-Gas Piping102
23 11 26 Facility Liquefied-Petroleum Gas Piping102
23 12 00 Facility Fuel Pumps102
23 12 13 Facility Fuel-Oil Pumps102
23 12 16 Facility Gasoline Dispensing Pumps102
23 13 00 Facility Fuel-Storage Tanks102
23 20 00 HVAC Piping and Pumps102
23 21 00 Hydronic Piping and Pumps103
23 21 13 Hydronic Piping103
23 21 13.13 Underground Hydronic Piping103
23 21 13.23 Aboveground Hydronic Piping103
23 21 13.33 Ground-Loop Heat-Pump Piping103
23 21 23 Hydronic Pumps103
23 21 23.13 In-Line Centrifugal Hydronic Pumps103
23 21 23.16 Base-Mounted, Centrifugal Hydronic Pumps103
23 21 23.19 Vertical-Mounted, Double-Suction Centrifugal Hydronic Pumps103
23 21 23.23 Vertical-Turbine Hydronic Pumps103
23 21 29 Automatic Condensate Pump Units103
23 25 00 HVAC Water Treatment103
23 25 10 Water Treatment Program Goals & Guidance103
23 25 30 Chemical-Free Water Treatment System Specification104
23 25 50 Legacy Chemical Water Treatment Systems107
23 26 00 Leak (Water) Detection Systems107
23 30 00 HVAC AIR DISTRIBUTION109
23 30 05 Computer Room (Class I) Temperature and Humidity Control109
23 32 00 Air Plenums and Chases111
23 32 13 Fabricated, Metal Air Plenums111
23 32 33 Air-Distribution Ceiling Plenums111
23 32 36 Air-Distribution Floor Plenums111
23 40 00 HVAC Air Cleaning Devices111
23 41 00 Particulate Air Filtration111
23 50 00 Central Heating Equipment112
23 60 00 Central Cooling Equipment112
23 61 00 Refrigerant Compressors113
23 62 00 Packaged Compressor and Condenser Units115
23 64 00 Packaged Water Chillers115
23 65 00 Cooling Towers115
23 80 00 Decentralized HVAC Equipment116
23 81 00 Decentralized Unitary HVAC Equipment116
23 81 13 Packaged Terminal Air Conditioners116
23 81 16 Room Air Conditioners116
23 81 19 Self-Contained Air Conditioners116
23 81 19.13 Small-Capacity Self-Contained Air Conditioners116
23 81 19.16 Large-Capacity Self-Contained Air Conditioners116
23 81 23 Computer Room Air Conditioners (CRAC Units)116
23 81 26 Split-System Air-Conditioners117
23 84 00 Humidity Control Equipment117
23 84 13 Humidifiers117
23 84 16 Dehumidifiers117
Div 25Integrated Automation118
25 00 00 Integrated Automation118
25 01 00 Installation, Operation and Maintenance of Integrated Automation119
25 01 20 Installation, Operation and Maintenance of Integrated Automation Network Equipment120
25 01 30 Installation, Operation and Maintenance of Integrated Equipment120
25 05 00 Common Work Results for Integrated Automation120
25 05 13 Conductors and Cables for Integrated Automation122
25 05 28 Pathways for Integrated Automation124
25 05 28.29 Hanger and Supports for Integrated Automation124
25 05 28.33 Conduits for Integrated Automation124
25 05 28.36 Cable Trays for Integrated Automation124
25 08 00 Commissioning, Training and Warranty of Integrated Automation124
25 10 00 Integrated Automation Network and Equipment124
25 10 10 Network Equipment Installation128
25 11 00 Integrated Automation Network Devices129
25 11 13 Integrated Automation Network Servers129
25 11 16 Integrated Automation Network Routers, Bridges, Switches, Hubs and Modems129
25 11 19 Integrated Automation Operator Workstations129
25 15 00 Integrated Automation Software130
25 50 00 Integrated Automation Facility Controls132
25 58 00 Integrated Automation Control of Electronic Safety and Security Systems132
25 90 00 Integrated Automation Control Sequences132
25 91 00 Integrated Automation Control Sequences for Facility Equipment132
Div 26Electrical160
26 01 00 Operation and Maintenance of Electrical Systems160
26 01 01 Arc Flash Hazard Communication160
26 01 01.10 Arc Flash Hazard Personal Protective Equipment (PPE)160
26 01 10 Operation and Maintenance of Medium-Voltage Electrical Distribution161
26 01 20 Operation and Maintenance of Low-Voltage Electrical Distribution161
26 01 26 Maintenance Testing of Electrical Systems161
26 01 30 Operation and Maintenance of Electrical Power Generating and Storing Equipment161
26 01 50 Operation and Maintenance of Lighting161
26 05 00 Common Work Results for Electrical161
26 05 19 Low-Voltage Electrical Power Conductors and Cables161
26 05 23 Control-Voltage Electrical Power Cables162
26 05 26 Grounding and Bonding for Electrical Systems163
26 05 29 Hangers and Supports for Electrical Systems163
26 05 33 Raceway and Boxes for Electrical Systems163
26 05 36 Cable Trays for Electrical Systems163
26 05 53 Identification for Electrical Systems163
26 05 73 Overcurrent Protective Device Coordination Study163
26 06 00 Schedules for Electrical163
26 01 50 Operation and Maintenance of Lighting163
26 06 20 Schedules for Low-Voltage Electrical Distribution163
26 06 40 Schedules for Electrical and Cathodic Protection Systems164
26 06 50 Schedules for Lighting164
26 08 00 Commissioning of Electrical Systems164
26 09 00 Instrumentation and Control for Electrical Systems164
26 09 13 Electrical Power Monitoring and Control164
26 09 23 Lighting Control Devices164
26 10 00 Medium-Voltage Electrical Distribution166
26 11 00 Substations166
26 12 00 Medium-Voltage Transformers166
26 20 00 Low-Voltage Electrical Distribution166
26 21 00 Low-Voltage Overhead Electrical Power Systems166
26 22 00 Low-Voltage Transformers166
26 23 00 Low-Voltage Switchgear166
26 23 13 Paralleling Low-Voltage Switchgear166
26 24 00 Switchboards and Panelboards166
26 24 13 Switchboards166
26 24 16 Panelboards166
26 24 19 Motor-Control Centers167
26 25 00 Enclosed Bus Assemblies167
26 26 00 Power Distribution Units (PDUs)167
26 27 00 Low-Voltage Distribution Equipment168
26 27 13 Electricity Metering168
26 27 13.10 Electricity Metering - Europe168
26 27 16 Electrical Cabinets and Enclosures168
26 27 16.10 Electrical Cabinets and Enclosures - Europe168
26 28 00 Low-Voltage Circuit Protective Devices168
26 28 13 Fuses168
26 28 16 Enclosed Switches and Circuit Breakers168
26 28 20 Emergency Power Off (EPO) Systems168
26 30 00 Facility Electrical Power Generating and Storing Equipment172
26 31 00 Photovoltaic Collectors172
26 32 00 Packaged Generator Assemblies172
26 32 13 Engine Generators172
26 32 33 Rotary Uninterruptible Power Units173
26 33 13 Batteries173
26 33 16 Battery Racks175
26 33 19 Battery Units175
26 33 23 Central Battery Equipment175
26 33 33 Static Power Converters175
26 33 43 Battery Chargers175
26 33 46 Battery Monitoring175
26 33 53 Static Uninterruptible Power Supply176
26 35 00 Power Filters and Conditioners178
26 35 13 Capacitors178
26 35 16 Chokes and Inductors178
26 35 23 Electromagnetic -Interference Filters178
26 35 26 Harmonic Filters178
26 36 00 Transfer Switches178
26 36 13 Manual Transfer Switches178
26 36 23 Automatic Transfer Switches178
26 40 00 Electrical and Cathodic Protection178
26 41 00 Facility Lightning Protection178
26 41 13 Lightning Protection for Structures178
26 41 13.13 Lightning Protection for Buildings178
26 41 16 Lightning Prevention and Dissipation179
26 41 19 Early Streamer Emission Lightning Protection179
26 41 23 Lightning Protection Surge Arresters and Suppressors179
26 42 00 Cathodic Protection179
26 43 00 Transient Voltage Suppression Systems (TVSS)179
26 43 13 Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits179
26 44 00 Signal Reference Ground (SRG)179
26 50 00 Lighting181
26 51 00 Interior Lighting181
26 51 10 Interior Lighting Technology183
26 51 10.10 Luminaires183
26 51 10.20 Lamps184
26 51 10.30 Ballasts184
26 51 10.40 Wall Sconces184
26 51 10.50 Emergency Lights184
26 51 20 Daylighting185
26 51 30 Zoning, Circuiting, Switching, & Lighting Controls185
26 52 00 Emergency Lighting186
26 53 00 Exit Signs187
26 60 00 Electrical Distribution to IT Equipment187
26 60 10 Rack Power Distribution (MPDUs)187
26 60 20 European Rack Power Distribution (MPDUs)188
Div 27Communications189
27 05 00 Common Work Results for Communications189
27 05 26 Grounding and Bonding for Communications Systems189
27 05 28 Pathways for Communications Systems189
27 05 28.29 Hangers and Supports for Communications Systems189
27 05 28.33 Conduits and Backboxes for Communications Systems189
27 05 28.36 Cable Trays for Communications Systems189
27 05 53 Identification for Communications Systems189
27 10 00 Structured Cabling189
27 10 01 IT & Network Equipment Racks (Raised Floor Equipment)189
27 10 02 Brushed Floor Grommets (Raised Floor Equipment)190
27 10 03 Blanking Panels (Raised Floor Equipment)190
27 10 04 Accessory Equipment (Raised Floor Equipment)190
27 11 00 Communications Equipment Room Fittings190
27 11 23 Communications Cable Management and Ladder Rack190
27 11 26 Communications Rack Mounted Power Protection and Power Strips190
Div 28Electronic Safety and Security191
28 01 00 Operation and Maintenance of Electronic Safety and Security191
28 01 10 Operation and Maintenance of Electronic Access Control and Intrusion Detection191
28 01 10.51 Maintenance and Administration of Electronic Access Control and Intrusion Detection191
28 01 10.71 Revisions and Upgrades of Electronic Access Control and Intrusion Detection191
28 01 20 Operation and Maintenance of Electronic Surveillance191
28 01 30 Critical Power Distribution for Electronic Security Systems192
28 10 00 Electronic Access Control and Intrusion Detection193
28 13 00 Access Control193
28 13 13 Access Control Global Applications193
28 13 19 Access Control Systems Infrastructure193
28 13 19.10 Access Control Systems Head-End Equipment194
28 13 19.20 Access Control Systems Operations Terminal Equipment194
28 13 19.30 Access Control Systems Imaging & Badging Equipment194
28 13 26 Access Control Remote Devices194
28 16 00 Intrusion Detection194
28 16 13 Intrusion Detection Control, GUI, and Logic Systems195
28 16 16 Intrusion Detection Systems Infrastructure195
28 20 00 Electronic Surveillance195
28 23 00 Video Surveillance195
28 23 13 Video Surveillance Control and Management Systems195
28 23 19 Digital Video Recorders and Analog Recording Devices195
28 23 23 Video Surveillance Systems Infrastructure195
28 23 26 Video Surveillance Remote Positioning Equipment196
28 23 29 Video Surveillance Remote Devices and Sensors196
28 30 00 Electronic Detection and Alarm196
28 31 00 Fire Detection and Alarm196
28 31 13 Fire Detection and Alarm Control, GUI, and Logic Systems196
28 31 23 Fire Detection and Alarm Annunciation Panels and Fire Stations196
28 31 33 Fire Detection and Alarm Interfaces196
28 31 33.13 Fire Detection and Alarm Interfaces to Remote Monitoring196
28 31 33.16 Fire Detection and Alarm Interfaces to Access Control Hardware196
28 31 33.23 Fire Detection and Alarm Interfaces to Access Control System196
28 31 33.26 Fire Detection and Alarm Interfaces to Intrusion Detection196
28 31 33.33 Fire Detection and Alarm Interfaces to Video Surveillance196
28 31 33.43 Fire Detection and Alarm Interfaces to Elevator Control196
28 31 43 Fire Detection Sensors196
28 31 46 Smoke Detection Sensors197
28 31 49 Carbon-Monoxide Detection Sensors197
28 31 53 Fire Alarm Initiating Devices197
28 31 53.13 Fire Alarm Pull Stations197
28 31 53.23 Fire Alarm Level Detectors Switches197
28 31 53.33 Fire Alarm Flow Switches197
28 31 53.43 Fire Alarm Pressure Sensors197
28 31 63 Fire Alarm Integrated Audio Visual Evacuation Systems197
28 31 63.13 Fire Alarm Horns and Strobes197
28 35 00 Refrigerant Detection and Alarm197
28 35 13 Refrigerant Detection and Alarm Control, GUI, and Logic Systems197
28 35 33 Refrigerant Detection Sensors197
28 36 00 Combustible Gas & Vapor Detection and Alarm198
Div 44Pollution Control Equipment199
44 10 00 Air Pollution Control199
44 11 00 Air Pollution Control Equipment199
44 11 16 Industrial Dust Collectors199
44 20 00 Noise Pollution Control199
44 21 00 Noise Pollution Control Equipment199
44 21 05 Noise Pollution Measurement Equipment & Procedures199
44 21 10 Noise Pollution Personal Protective Equipment (PPE)199

Table of Figures

Figure 01-06: Security References25
Figure 01-07: Planned System Redundancy Levels37
Figure 01-09: Tier Classification Performance Standards38
Figure 09-01: Airflow69
Figure 09-02: Lifecycle of Wall Coverings75
Figure 13-02: Seismic Zone Map94
Figure 23-01: Chemical Water Treatment107
Figure 23-02: Comparison of 2004 and 2008 Recommended Operating Envelope109
Figure 23-03: Environmental Envelope Psychrometric Chart110
Figure 23-04: Typical mechanical system layout for center chilled water cooling plant112
Figure 25 05 00: Graphical representation of BAS subsystem and Application interrelationships.122
Table 25 05 13: Network Wire Insulation and Jacket Color123
Table 25 05 13a: Power Wire Jacket/Insulation Color124
Figure 25 10 00: Typical High-Level Network Architecture126
Table 25 91 00: Iconics Alarm Categories135
Table 25 91 00a: BAS Alarm Color Code135
Table 25 91 00c: BAS Alarm Categorization and Communication139
Table 25 91 00d: Electrical Device Spreadsheet Tabs141
Table 25 91 00e: Mechanical Device Spreadsheet Tabs142
Table 25 91 00f: Legend Graphic Example144
Table 25 91 00g: Enterprise Graphic Example145
Table 25 91 00h: System Level Graphic Example146
Table 25 91 00i: Site Utility Graphic Example147
Table 25 91 00j: Site Layout Graphic Example148
Table 25 91 00k: UPS System Graphic Example148
Table 25 91 00l: UPS Detail Graphic Example149
Table 25 91 00m: UPS Battery Graphic Example149
Table 25 91 00n: Critical Power Distribution Graphic Example150
Table 25 91 00o: Critical Power Circuit Breaker Graphic Example150
Table 25 91 00p: Essential Power Distribution Graphic Example151
Table 25 91 00q: Essential Power Circuit Breaker Graphic Example151
Table 25 91 00r: HVAC System Graphic Example152
Table 25 91 00s: HVAC Setpoint Graphic Example152
Table 25 91 00t: Condenser Water Graphic Example153
Table 25 91 00u: AHU Graphic Example153
Table 25 91 00v: Air Distribution System Graphic Example154
Table 25 91 00w: Air Distribution Component Graphic Example154
Table 25 91 00x: CRAH Graphic Example155
Table 25 91 00y: Air Distribution Active Alarm Graphic Example155
Table 25 91 00z: Hot Water System Graphic Example156
Table 25 91 00aa: PDU Graphic Example156
Table 25 91 00ab: PDU Metering Graphic Example157
Table 25 91 00ac: PDU Active Event Graphic Example158
Table 25 91 00ad: Generator Graphic Example158
Table 25 91 00ae: Point Trending Graphic Example159
Figure 26-01: Emergency Power Off (EPO) Systems169
Figure 26-03: Signal Reference Ground180
Table 26 51 00: Lighting Requirements by Space Type183

Table of Attachments

Number
Title
Paragraph Number
01-01
Joint kW and area cost model
01-20-00
01-02
CD521-2178 QA Surveillance form
01-43-40
01-03
DD250 Material Installation and Receiving Report
01-43-40
01-04
DD1716 Contract Deficiency Report
01-43-40
01-05
Labeling and Identification Specification
01-67-00
01-06
Uniformat II Levels 4&5 Classification
01-67-00
01-07
Record Drawing CM Specification
01-78-39
01-08
DECC Equivalency and Standards
01-80-00
01-09
Modular Data Center Concept Specification
01-83-25
01-10
Maintenance, Repair and Construction
01-90-00
01-11
Commissioning
01-91-00
01-16
Responsibilities of the COTR
01-92-50
09-01
Carpet Tile Specification
09-68-13
12-01
Space Planning-Bulk Square Footages
12-59-00
13-01
Physical Security Construction
DIV 13
13-02
IC Tech Spec for ICD-ICS-705
DIV 13
21-01
Gaseous Fire Suppression
21-25-00
21-02
Hydrogen Fluoride Corrosion
21-25-00
23-01
CRAC Specification
23-81-23
23-02
BACnet Direct Digital Control Systems for HVAC Specification
23-09-23
25-01
UFGS 15910n DDC Specification
25-10-00
26-01
CD521 Electrical Safety Program
26-01-00
26-02
Energized Electrical Work Permit
26-01-00
26-03
Electrical PPE Worksheet
26-01-00
26-04
ESP Proposal Clarification Form
26-01-00
26-05
Dry-Type Transformer Standard
26-22-00
26-06
PDU Specification
26-26-00
26-07
RDC Specifications
26-26-00
26-08
PDU Preventive Maintenance Guidelines
26-26-00
26-12
SPD Specification
26-43-13
26-13
SRG Designs
26-44-00
26-14
ITIC Grounding Guidelines
26-44-00
27-01
Cable tray Specifications
27-05-28.36
27-02
IT Equipment Rack Specification
27-10-01
27-03
ZDC Specifications
27-10-01
28-01
Combustible Gas Detection
28-36-00

Table of Acronyms

Abbreviation
Definition
1PH 1P
Single Phase Single Pole
1PH 2P
Single Phase Two Pole
3PH 3W
Three Phase Three Wire
3PH 4W
Three Phase Four Wire
AC
Actual Cost (see EVM)
AC
Alternating Current
ACS
Access Control System
ACU
Air Conditioning Unit (see also FCU, RTU)
A/E
Architect/Engineer
ADAAG
Americans with Disabilities Act Accessibility Guidelines
ADPE
Automatic Data Processing Equipment (see IT)
ANSI
American National Standards Institute.
ASHRAE
American Society of Heating, Refrigeration, and Air Conditioning Engineers
ASTM
American Society for Testing Materials
ATS
Automatic Transfer Switch
AWG
American Wire Gage
BAS
Building Automation System (replaces “CMCS” and “EMCS”)
BAT
Battery String (UPS Battery Strings)
BDS
Battery Disconnect Switch
BMS
Battery Monitoring System (UPS Battery String Monitor)
BOS
Base Operating Support
CAV
Constant Air Volume (system)
CBB
Common Battery Bus
CCTV
Closed Circuit Television
CFR
Code of Federal Regulations
CLIN
Contract Line Item Number
CMCS
Computerized Monitoring & Control System (see “BAS”)
CMMS
Computerized Maintenance Management System
CO
Contracting Officer (see also “KO”)
CONT
Contactor
CONUS
Contiguous United States
COR
Contracting Officer’s Representative
CRAC
Computer Room Air Conditioning
CRAH
Computer Room Air Handler
CSD
Computing Services Directorate (Obsolete, see ESD)
CUBES
Critical UPS & Battery Equipment Support
DC
Direct Current
DDC
Direct Digital Controls
DECC
Defense Enterprise Computing Center (DISA Entity)
DISA
Defense Information Systems Agency
DoD
Department of Defense
DP
Distribution Panel
DX
Direct Exchange
EASE
Electronically Activated Streamer Emitting
EF
Exhaust Fan
EIN
Equipment Identification Number
EMCS
Environmental Monitoring & Control System (see “BAS”)
EPA
Environmental Protection Agency.
EPO
Emergency Power Off
ESD
Electro Static Discharge
ESD
Enterprise Services Directorate (see CSD)
EV
Earned Value (see EVM)
EVM
Earned Value Management
FAR
Federal Acquisition Regulation
FCI
Facility Condition Index
FCL
Facility Security Clearance
FCU
Fan Coil Unit
FIPS
Federal Information Publication Service
FOUO
For Official Use Only
GFE
Government-Furnished Equipment
HAZCON
Hazardous Condition
HVAC
Heating, Ventilation, and Air Conditioning
HX
Heat Exchanger
IAW
In Accordance With
IDS
Intrusion Detection System
IR
Infrared
ISC
Infrastructure Support Center (DISA Entity)
IT
Information Technology (replaces “ADPE”)
JTR
Joint Travel Regulation
KO
Contracting Officer (see also “CO”)
KVA
Kilo-Volt-Ampere
KW
Kilowatt
LEL
Lower Exposure Limit
LOE
Level of Effort (see EVM)
LOTO
Lock Out-Tag Out
LP
Lighting Panel
LPS
Lightning Protection System
MCC
Motor Control Center
MDP
Main Distribution Panel
MEP
Mechanical, Electrical, & Plumbing
MIL
Maintenance Impact Level
MILCON
Military Construction
MPDU
Modular Power Distribution Unit (aka “power strip”)
NACLC
National Agency Check with Local Record Check
NEC
National Electrical Code
NFPA
National Fire Protection Association
O&M
Operations & Maintenance
OCONUS
Outside Contiguous United States
OEM
Original Equipment Manufacturer
OSHA
Occupational Safety and Health Act
PCCIE
Power Conditioning and Continuation Interfacing Equipment
PCL
Personnel Security Clearance
PdM
Predictive Maintenance
PDU
Power Distribution Unit
PE
Processing Element (DISA Entity)
PFA
Process Failure Analysis
PM
Preventative Maintenance
POC
Point of Contact
PP
Power Panel (no longer used – replaced by “DP”)
PPE
Personal Protective Equipment
PSI
Personnel Security Investigation
PV
Planned Value (see EVM)
PWS
Performance Work Statement
QA
Quality Assurance
QAP
Quality Assurance Personnel
QASP
Quality Assurance Surveillance Plan
QC
Quality Control
RA
Return Air (Fan)
RAM
Roof Asset Management
RDC
Remote Distribution Cabinet (aka: “sidecar” or “expansion cabinet”)
RW
Raceway
RWP
Recurring Work Program
SBM
System Bypass Module (UPS System)
SMC
Systems Management Center (DISA Entity)
SOP
Standard Operating Procedure
SOW
Statement of Work
SPD
Surge Protective Device (replaces “TVSS”)
SPOF
Single Point of Failure
SR&M
Sustainment, Restoration, & Modernization
SRG
Signal Reference Grid
SWBD
Switchboard
SWGR
Switchgear
THD
Total Harmonic Distortion
TIM
Tiered Infrastructure Maintenance
TM
Task Monitor
TO
Task Order
TR
Technical Requirement
TVSS
Transient Voltage Surge Suppression (outdated; see also “SPD”)
UFAS
Uniform Federal Accessibility Standards
UPS
Uninterruptible Power Supply
USWGR
UPS Switchgear, including Paralleling Equipment, Hot Tie Equipment, (integral) Maintenance Bypass Cabinets, and similar components
UV
Ultraviolet
VAL
Visit Authorization Letter (formerly “Visit Authorization Request or VAR”)
VAV
Variable Air Volume
VFD
Variable Frequency Drive
XFMR
Transformer
ZDC
Zone Distribution Center

Enclosure 2 DISAC 360-95-3

FOR OFFICIAL USE ONLY (FOUO)

SPECIFICATIONS GROUP

General Requirements Subgroup Div 01 General Requirements 01 10 00 Summary 01 11 00 Summary of Work 01 11 13 Work Covered by Contract Documents Work accomplished at DISA datacenters is accomplished by a number of different contract vehicles, All work shall use standardized Statements of Work (SOW) or Performance Work Statements (PWS) using boilerplate components from other internal DISA organizations. These boilerplate statements ensure that other standards and requirements are met Statements of work for all facility or construction contracts shall cite or reference all applicable standards, specifications, and codes, as well as rules, regulations and policies Sensitive information including site addresses and points of contact will not be included on SOWs and PWSs until after award of a contract.

01 14 00 Work Restrictions 01 14 13 Access to Site Access to DISA datacenter locations is strictly limited to authorized personnel, and to contractors/vendors with awarded government contracts. The DISA Field Security Office (FSO) is the proponent for all security-related access inquiries.

The criteria for determining whether a contract needs to be classified (i.e., requires a DD254 and FCL (Facility Security Clearance), with clearances for personnel) is: 'Will the contractor personnel come into contact with classified information during performance of job duties?” The following is the list of necessary and sufficient conditions, all of which must be reasonably met, in order to have a facilities contract request security clearances:

a. Is it reasonably likely that contractor personnel will come into contact with classified information?

b. Are contractor personnel going to be working in controlled areas more than 16 hours per week?

c. Is the contract requirement long-term (multiple performance periods) and on-going?

d. Are the functions being performed historically services performed by host agency BOS programs, where host agency personnel would have had clearances as a result of their military/government employment?

Sponsorship for new FCLs are reserved for site-wide or enterprise-wide O&M contractors Sponsorship for these FCLs is conducted by the Government Contracting

01 14 16 Coordination with Occupants 01 14 19 Use of Site 01 20 00 Price and Payment Procedures Cost estimating for datacenter construction and replacement shall be conducted using both PACES (Parametric Cost Estimating System) and R.S. Means Cost Estimating tools.

01 24 00 Value Engineering Value Engineering shall be conducted on all capital improvement projects in the design and construction phases to determine cost savings and efficiencies in the project execution.

01 30 00 Administrative Requirements 01 31 00 Project Management and Coordination 01 31 13 Project Coordination The standards used for design, construction, operation and maintenance of the DISA datacenter facilities are the same as the standards used by the host installation except as described herein. The DISA Facility Standards may be more restrictive than host installation standards. The DISA Facility Managers will ensure compliance with both the host installation and DISA Facility Standards. This includes but is not limited to advising host installation engineering organizations of DISA requirements and stopping work that is not in compliance.

01 32 00 Construction Project Documentation 01 32 16 Construction Progress Schedule Planned progress schedules for projects are required submissions in technical and cost proposals from vendors for all work.

Progress schedules shall be updated and submitted in association with the deliverable requirements in that section, not less than monthly during the period of performance of projects (from date of award until final acceptance by the Government).

01 33 00 Submittal Procedures 01 33 23 Shop Drawings, Product Data, and Samples Drawings and drawing packages submitted for progress and design reviews shall conform to the requirements of the Record Drawing Configuration Management (CM) Specification in section 01 78 39.

01 35 00 Special Procedures 01 35 53 Security Procedures All Information Technology (IT) systems designed, implemented, and operated in the DISA environment are subject to a strict set of Information Assurance (IA) requirements before those systems are allowed to operate or connect to any other system. Prior to operation or connection of any system, the Service Provider for that system shall obtain all necessary certification(s), accreditation(s), and authorization(s). This requirement applies to services covering:

a. Building Automation Systems (BAS)

b. Access Control & Closed Circuit Television Systems

c. Computerized Maintenance Management Systems (CMMS) The contracted Service Provider shall conduct all necessary IA activities to achieve and maintain certification and accreditation of any IT systems during the performance of any contract involving the operations and maintenance of IT systems.

Security System Accreditation Agreement (SSAA) worksheets submitted for the DoD Information Assurance Certification and Accreditation Process (DIACAP) Implementation Plan must take into account modular updates to the systems, patches and how they will be tested and installed, access to out-of-band (OOB) network systems for LAN access, who will be designated as the system administrator(s) for the system(s), how backups will be performed, et cetera..

The processes involved in obtaining and maintaining certification and accreditation are complex and beyond the scope of this Standard to fully define. The publications listed herein and other mandatory guidance that can be obtained from http://iase.disa.mil/ are critical to ensuring that IT systems supporting the enterprise are safe.

Publication Number
Title
Date/Version
Mandatory/Advisory
DoDI 8510.01
DoD Information Assurance Certification and Accreditation Process (DIACAP)
(current)
Mandatory
DIACAP Workflow
DIACAP Workflow
(current)
Mandatory
Access Control STIG
Access Control STIG
(current)
Mandatory
Wireless STIG
Wireless STIG
(current)
Mandatory
Database STIG
Database STIG
(current)
Mandatory
NSA Windows XP Security Guide Addendum
NSA Windows XP Security Guide Addendum
(current)
Mandatory
Web Server STIG
Web Server STIG
(current)
Mandatory
VMS General Information
VMS General Information
(current)
Mandatory

Figure 01-06: Security References

01 40 00 Quality Requirements 01 41 00 Regulatory Requirements Offices that write, control and/or implement standards for DISA Enterprise Services Facilities:

a. DISA Director

b. Principal Director for DISA Enterprise Services

c. DISA Enterprise Services, Operations

d. DISA Enterprise Services, Operations Denver, Facilities Engineering

e. DISA CS Site Facility Managers

f. Military Departments

g. Major Commands

h. Major Command Engineers

i. Host Base Engineers or Installation Public Works Officers

j. GSA and GSA Contractors

k. Local, state and federal laws, ordinances, and procedural requirements

01 41 13 Codes References listed herein may impact scope, design, and/or schedule and are listed for reference. All references are (U) unless noted otherwise.

Deviations and Conflicts in Standards

a. This DISA Facility Standards apply to all DISA Enterprise Services sites for all repair, remodeling, new construction, operation and maintenance. DISA Facility Engineering may authorize variances/waivers from the standards. Some waivers may be time specific and may be rescinded by the authority having jurisdiction (AHJ).

b. All references herein are mandatory unless otherwise stated. . The current version of all references is implied.

c. More stringent guidance shall survive in case of conflicting standards within…

This is the start of the file's text. The full file is on GovTribe.