About this file

GSM-O Amendment 00004

View the file

Other files

File Type Posted
Amd 0006.pdf PDF
GSM-O Amd 0005.doc DOC document
DD254_GSM-O v2.pdf PDF
Atch 1 GSM-O PWS 02-24-2011.pdf PDF
Amend 0003.pdf PDF
GSM-O Release 3 - QAs 63-65.pdf PDF
GSM-O Task Order-2 Final RFP 02-24-2011.pdf PDF
GSM-O Task Order-1 Final RFP 02-24-2011.pdf PDF
HC1028-10-R-2000-Amend 0002.doc DOC document
GSM-O Task Order-1 Final RFP 02-16-2011.pdf PDF
Atch 12 - GSM-O PP Questionnaire.doc DOC document
SF33.pdf PDF
FRFP RELEASE NO 2 - QA 44-62.pdf PDF
GSM-O Task Order-3 Final RFP 02-09-2011.pdf PDF
Atch 1 GSM-O PWS 02-18-2011v2.pdf PDF
GSM-O Task Order-3 Final RFP 01-10-2011.pdf PDF
GSM-O Task Order-1 Final RFP 02-09-2011.pdf PDF
Atch 12 - GSM-O PP Questionnaire - Amend 0001.pdf PDF
Atch 5 - GSM-O QASP 02-09-2011.pdf PDF
GSM-O Amendment 0001.pdf PDF
GSM-O Task Order-2 Final RFP 02-09-2011.pdf PDF
Atch 11- GSM-O Client Auth Letter - Amend 0001.pdf PDF
FRFP QUESTIONS - Release 1- 1-43.pdf PDF
Atch 1 GSM-O PWS 02-09-2011.pdf PDF
Atch 8 - GSM-O Task Order-3.pdf PDF
Atch 11- GSM-O Client Authorization Letter.pdf PDF
HC1028-10-R-2000 - FINAL RFP FOR GSM-O 14 JAN 2011.pdf PDF
Atch 5 - GSM-O QASP 01-08-2011c.pdf PDF
Atch 2 -GSM-O DD254.pdf PDF
Atch 3 - GSM-O CDRLs Final RFP 01-10-2011.pdf PDF
Atch 9 - Past Performance Information for GSM-O.pdf PDF
Atch 4 GSM-O Task Order Procedure.pdf PDF
Atch 12 - GSM-O PP Questionnaire.pdf PDF
Atch 6 - GSM-O Task Order 01.pdf PDF
Atch 10 - GSM-O Subcontractor_Teaming Partner Consent Ltr - GSM-O.pdf PDF
DISN Labor Category and Descriptions Example.pdf PDF
Matrix of GSMO Ques- Answers posted on FedBizOpz.doc DOC document
Atch 7 - GSM-O Task Order-02.pdf PDF
Atch 1 GSM-O PWS 01-10-2011c.pdf PDF
07 Jan 2011 - Questions Answers 422 - 433.doc DOC document
Provisioning Actions.xls XLS spreadsheet
Release No. 5 - Questions 389-421.doc DOC document
GSM-O 22 Oct 2010 Q As.doc DOC document
24 SEP 2010 Q As.doc DOC document
GSM-O Release 2 Question-Answers.doc DOC document
Pre-Solicitation Q A's posted 8-9-10_round 1.doc DOC document
Sop310-85-01-Rev1.doc DOC document
SOP100-55-01 GNSC TMS —
9 - NS6_DISN Maintenance Support_v2 Read-Only .pdf PDF
B- KO Pre-Solicitation Briefing Slides 28 jun 10.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISAGSMOPS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Update L8.4.1.1

2) Delete L8.4.1.2 in it's entirety

3) Update L8.4.3 and L8.4.3.2.2.3 to reflect "GSM" vice "GMS"

4) Delete L8.4.5.1 in it's entirety

5) Update M1.3 to reflect "unreasonably high or low in cost" vice "unrealistically high or low in cost"

5) Provide Revised DD254

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC1028-10-R-2000

X 9B. DATED (SEE ITEM 11)

14-Jan-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Mar-2011

CODE

DISA/DITCO-SCOTT-PL83

2300 EAST DRIVE

SCOTT AFB IL 62225-5406

HC1028 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HC1028-10-R-2000

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L8.4

Volume IV - Cost/Price Proposal.

L8.4.1 General Instructions

L8.4.1.1 Cost/Price Reasonableness and Realism. This section is to assist you in submitting information other than cost or pricing data that is required to evaluate the reasonableness of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal. The

Government will determine the reasonableness of the overall price based the proposal analysis techniques contained in FAR 15.404-1. Note that unrealistically low or high proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or has submitted an unrealistic proposal. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed costs/prices rests with the offeror.

L8.4.1.2 DELETED

L8.4.1.3 Cost/Price Information. Information beyond that required by this instruction shall not be submitted, unless you consider it essential to document or support your cost/price position. All information relating to the proposed price, including all required supporting documentation must be included in the section of the proposal designated as the Cost/Price volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal.

L8.4.1.4 Cost or Pricing Information Requirements. It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are initially not required to submit certified cost or pricing data. If, after receipt of proposals, the CO determines that there is insufficient information available to determine price reasonableness and none of the exceptions in FAR Part 15.403-1 apply, the offeror shall be required to submit cost or pricing data. Information shall be provided in accordance with FAR Part 15.403-5.

L8.4.2 The offeror shall comply with instructions contained herein for development of its cost/price proposal. The offeror is required to submit all pricing data for all task orders provided as HC1028-10-R-2000, Attachment 6 through HC1028-10-R-2000, Attachment 8.

L8.4.3 Volume IV Organization. The Cost/Price volume shall consist of the following sections:

Part A – Introduction

- Glossary of Abbreviations and Acronyms

- Additional Information as stated in Paragraph L8.4.3.1.2 through Paragraph L8.4.3.1.5, below.

Part B – Microsoft Excel Spreadsheets

- Summary Spreadsheet

- Individual Microsoft Excel Spreadsheets for:

Task Order #GSM-O-01

Task Order #GSM-O-02

Task Order #GSM-O-03

Part C – Table of Labor Categories and Labor Rates for:

CONUS Contractor Facility

CONUS Government Facility

O-CONUS Contractor Facility

O-CONUS Government Facility

Part D – Other information.

Part E – Final Proposal Revision (FPR). This part shall apply only if the

Contracting officer requests a final proposal.

L8.4.3.1 Part A – Introduction. Include table of contents; glossary of abbreviations and acronyms; summary descriptions of accounting, estimating, and purchasing systems; and changes to estimating, accounting practices, or

Cost Accounting Standards (CAS) Disclosure.

L8.4.3.1.1 Glossary of Abbreviations and Acronyms. If necessary, provide a glossary of abbreviations and acronyms used with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

L8.4.3.1.2 Accounting System. Indicate whether you have Government acceptance of your accounting system and, if so, provide evidence of such acceptance. Also, identify any deviations from your standard procedures in preparing this proposal.

L8.4.3.1.3 Estimating System. Provide a summary description of your standard estimating system or methods for the CPFF and CPIF CLINs. Also, identify any deviations from your standard estimating procedures in preparing this proposal volume. Indicate whether you have Government acceptance of your system and, if so, provide evidence of such acceptance.

L8.4.3.1.4 Purchasing System. Provide a summary description of your purchasing system or methods (e.g., how material requirements are determined, how sources are selected, when firm quotes are obtained, what provision is made to ensure quantity and other discounts). Also, identify any deviations from your standard procedures in preparing this proposal. Indicate whether you have Government acceptance of your system and, if so, provide evidence of such acceptance.

L8.4.3.1.5 Cost Accounting Standards (CAS) Disclosure Statement. The offeror shall provide current status of its

Cost Accounting Standards (CAS) Disclosure Statement and explain any inadequacies or non-compliances.

L8.4.3.2 Part B – Microsoft Excel Spreadsheets. The cost proposal shall be submitted using Microsoft Excel and shall include all formulas and calculations.

L8.4.3.2.1 Summary Spreadsheet. Provide a summary spreadsheet of the task order proposals. The summary spreadsheet shall include the total proposed firm fixed price for each task order, as well as the proposed aggregate total for all task orders. The summary spreadsheet should include all calculations/formulas used to develop final firm fixed price.

L8.4.3.2.2 Individual Task Order Spreadsheets.

L8.4.3.2.2.1 The offeror shall proposed firm fixed prices for requirements reflected in the task orders, HC1028-10-

R-2000, Section J, Attachment 6 through Attachment 8 in Microsoft Excel version 2003. For proposal pricing purposes only, offerors shall not assume any use of the existing Government supply of spare/repair parts, but instead shall assume that all parts used for request fulfillment and repair/maintenance actions are to be obtained from the offeror's supplier(s).

L8.4.3.2.2.2 The offeror’s proposal for each of the task orders shall include detailed cost/price amounts of all resources required to accomplish the task, (i.e. labor categories, labor hours, number of employees for each labor category, rates, On-Site and Off-Site, travel, incidental equipment, etc.). Labor and overhead rates should include sufficient detail to sustain a DCAA audit (e.g. Direct Labor Rates, Overhead, Fringe Benefits, G&A, and Fee, etc.).

All travel must show the specific detail, if known (i.e., number of days, locations, number of personnel, etc.). All

ODC’s shall annotate the specific detail (quantity, part number, manufacturer, etc.) to justify the cost (i.e., vendor quotes, price history, etc.) and shall be made available upon request from the Government. If a subcontractor relationship exists, the subcontractor must break out their costs, in accordance with the above requirements. If needed, the subcontractor may submit their cost breakout directly to the Contracting Officer. If applicable, travel shall be authorized by the Contracting Officer’s Representative (COR) or Task Monitor (TM), in writing, prior to performance and will be paid IAW FAR Part 31.205-46 and the Joint Federal Travel Regulations. The contractor will be authorized to invoice monthly for all incurred travel costs approved by the COR or TM.

L8.4.3.2.2.3 The offeror’s proposed firm fixed price for each task order shall reflect the period of performance for each task order as follows:

Task Order #GSM-O-01

Base Period

Option Period 1

Option Period 2

Option Period 3

Option Period 4

Option Period 5

Option Period 6

Month 1-12

Month 13-24

Month 25-36

Month 37-48

Month 49-60

Month 61-72

Month 73-84

01Oct 2011 - 30 Sep2012

01Oct 2012 - 30 Sep2013

01Oct 2013 - 30 Sep2014

01Oct 2014 - 30 Sep2015

01Oct 2015 - 30 Sep2016

01Oct 2016 - 30 Sep2017

01Oct 2017 - 30 Sep2018

Task Order #GSM-O-02

Base Period

Option Period 1

Option Period 2

Option Period 3

Option Period 4

Month 25-36

Month 37-48

Month 49-60

01Oct 2013 - 30 Sep2014

01Oct 2014 - 30 Sep2015

01Oct 2015 - 30 Sep2016

01Oct 2016 - 30 Sep2017

01Oct 2017 - 30 Sep2018

Task Order #GSM-O-03

Base Period

Option Period 1

Option Period 2

Option Period 3

Option Period 4

Month 25-36

Month 37-48

Month 49-60

01Oct 2013 - 30 Sep2014

01Oct 2014 - 30 Sep2015

01Oct 2015 - 30 Sep2016

01Oct 2016 - 30 Sep2017

01Oct 2017 - 30 Sep2018

L8.4.3.2.3 Rounding. All costs or prices provided shall be rounded to the nearest dollar.

L8.4.3.2.4 Percentages. Percentages should be limited to two decimal points; for example 25 percent shall be reflected as .25

L8.4.3.2.5 Additional Criteria. All proposal amounts shall be proposed in U.S. currency.

L8.4.4 Part C – Table of Labor Categories and Labor Rates. Offerors shall include a table reflecting Labor

Categories and applicable Labor Rates used in the development of the task order proposals. A separate table shall be prepared for each period of performance (i.e., Months 1-12, 13-24, etc.). The complete Table of Labor

Categories and Labor Rates shall be incorporated into the resultant contract as an attachment to Section B and will become the basis for determining price reasonableness in subsequent task order requirements.

L8.4.5 Part D – Other Information.

L8.4.5.1 DELETED

L8.4.5.2 DCAA and DCMA Point of Contact Information. The offeror shall submit the name, address, Field Audit

Office (FAO) number, and phone number of its cognizant Defense Contract Audit Agency (DCAA) and Defense

Contract Management Agency (DCMA) office. If your rates are based on a formal budgetary forecast, please provide effective date(s). State if they have been provided to the cognizant ACO/DCAA office for review or negotiation; if not, please explain.

L8.4.6 Part E - Final Proposal Revision (FPR). This part shall apply only if the CO requests a Final Proposal

Revision. It is not necessary to provide the same level of detail in the final cost revision proposal as provided in the original cost proposal. However, all cost changes in the final cost revision proposal must be fully substantiated and explained. Provide a SUMMARY SCHEDULE OF CHANGES (Was-Is). This shall reflect all significant cost changes by major cost by period, i.e. basic and options. Identify the significant cost increases as well as the significant cost decreases. Explain the reasons for the cost changes consistent with changes to technical/management approach, and provide appropriate rationale so that an explanation can be provided to the SSA.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

M1

SOURCE SELECTION

M1.1 Basis For Award. This is a best value source selection conducted in accordance with Federal Acquisition

Regulation (FAR) Part 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation

Supplement (DFARS), and the DISA Acquisition Regulation Supplement (DARS). These regulations are available electronically at http://farsite.hill.af.mil. The Government will select the best overall offer, based upon an integrated assessment of technical/management, past performance, and cost/price. The GSM-O contract may be awarded to the offeror who is deemed responsible in accordance with the FAR, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors to represent the best value to the Government. The Government seeks to award to the offeror who gives DISA the greatest confidence that it will best meet, or exceed, the requirements. This may result in an award to a higher rated and/or higher priced offeror, where the decision is consistent with the evaluation factors as long as the Source

Selection Authority (SSA) reasonably determines that the higher ranked technical/management, overall business approach, and/or greater past performance of the higher price offeror outweighs the cost difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below).

M1.2 Number of Contracts to be Awarded. The Government intends to award one single Indefinite

Delivery/Indefinite Quantity contract for the Global Information Grid Services Management-Operations (GSM-O) effort; however, the Government reserves the right to make no award at all.

M1.3 Rejection of Unrealistic Offers. The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, contract terms and conditions, or unreasonably high or low in cost when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

(End of Summary of Changes)