GUS HARRISON BLDGS 200-300 SPECIFICATION BOOK-011124REV.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ - 171 - 240000000186
- Issued by
- Lenawee County, Michigan
About this file
This document is an Invitation to Bid (ITB) issued by the State of Michigan Department of Technology, Management and Budget (DTMB) for the GUS HARRISON CORRECTIONAL FACILITY - BLDG 200 BOILER REPLACEMENT & BLDG 300 HVAC REPLACEMENT project. The work includes demolition and replacement of boilers, pumps, air handling unit coils and pumps, as well as one air cooled condenser and associated systems in Building 200, and demolition and replacement of pumps, air handling unit coils and pumps, one remote air cooled condenser, DX coil and associated systems in Building 300. The project also includes demolition of existing pneumatic temperature controls and integration of new temperature controls into the existing building management system in both buildings. Bids are due electronically through the SIGMA VSS website by 2:00 p.m. ET on 3/6/2024. A mandatory pre-bid conference and site visit will be held on 1/30/2024. The awarded contractor will be required to comply with Soil Erosion and Sedimentation Control regulations. The Contract Time and associated liquidated damages are specified in the agreement. Bidders will be required to provide 5% Bid Security and must include Michigan sales and use taxes, and the cost of all permits, approvals, licenses and fees in their bid prices.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with
Bidding Requirements
FILE NUMBERS
472-22350.MNB
FUNDING CODE:
171CODOC7325 & ARFMaintProj
MICHIGAN DEPARTMENT OF CORRECTIONS
GUS HARRISON CORRECTIONAL FACILITY
BLDG 200 BOILER REPLACEMENT
BLDG 300 HVAC REPLACEMENT
ADRIAN, MICHIGAN
JANUARY 2024
1997 Edition/R 03/22 Version
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY .................................... 00020 - 1
SECTION 00030 ADVERTISEMENT ......................... 00030 - 1
SECTION 00100 INSTRUCTIONS TO BIDDERS ...... 00100 - 1
ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS
...................................................................................... 00100 - 1
ARTICLE 2 QUALIFICATIONS OF BIDDERS ............ 00100 - 1
ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS;
SAFETY REQUIREMENTS; LAWS ............................... 00100 - 2
ARTICLE 4 INTERPRETATIONS; ADDENDA ........... 00100 - 3
ARTICLE 5 BID SECURITY ....................................... 00100 - 3
ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES
...................................................................................... 00100 - 4
ARTICLE 7 MATERIALS AND EQUIPMENT ............. 00100 - 4
ARTICLE 8 SUBCONTRACTORS ............................. 00100 - 5
ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS
...................................................................................... 00100 - 5
ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS
...................................................................................... 00100 - 6
ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION 00100 - 6
ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD
...................................................................................... 00100 - 7
ARTICLE 13 BIDS TO REMAIN OPEN ......................... 00100 - 7
ARTICLE 14 AWARD OF THE CONTRACT ................. 00100 - 7
ARTICLE 15 EXECUTION OF THE AGREEMENT ....... 00100 - 9
ARTICLE 16 MOBILIZATION PAY ITEM .................... 00100 -10
ARTICLE 17 SOIL EROSION AND SEDIMENTATION
CONTROL–FINE FOR NON-COMPLIANCE................ 00100 -10
ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK
LIST ............................................................................... 00110 - 1
SECTION 00120 SUPPLEMENTARY INSTRUCTIONS . 00120
- 1
SECTION 00210 INFORMATION FOR BIDDERS ..... 00210 - 1
SECTION 00300 BID SUMMARY .............. 00300 - SUMMARY
SECTION 00300 BID FORM ...................................... 00300 - 1
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF
MICHIGAN ("THE OWNER"). ........................................ 00300 - 1
ARTICLE 2 THE BIDDER'S REPRESENTATIONS ...... 00300 - 1
ARTICLE 3 TIME OF COMPLETION ............................ 00300 - 2
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID 00300
- 2
ARTICLE 5 DEFINED TERMS ...................................... 00300 - 2
ARTICLE 6 BID SCHEDULE ......................................... 00300 - 3
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES 00300 -
ARTICLE 8 BID SUBMITTED ON ................................ 00300 - 6
SECTION 00310 BID BOND ...................................... 00310 - 1
SECTION 00320 NONCOLLUSION AFFIDAVIT ....... 00320 - 1
SECTION 00410 BID BREAKDOWN ........................ 00410 - 1
SECTION 00420 QUESTIONNAIRE .......................... 00420 - 1
ARTICLE 1 ORGANIZATION ...................................... 00420 - 1
ARTICLE 2 SPECIALTY CONTRACTOR LICENSES . 00420 - 1
ARTICLE 3 EXPERIENCE .......................................... 00420 - 1
ARTICLE 4 ADDITIONAL QUALIFICATIONS ............. 00420 - 2
ARTICLE 5 REFERENCES ......................................... 00420 - 2
REFERENCES ATTACHMENT ................ 00420 - 3
SECTION 00430 LIST OF SUBCONTRACTORS ..... 00430 - 1
SECTION 00440 SCHEDULE OF MATERIALS AND
EQUIPMENT ................................................................. 00440 - 1
ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED
(NAMED OR SPECIFIED) ITEMS ................................. 00440 - 1
ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN
SPECIFICATIONS......................................................... 00440 - 3
SECTION 00500 AGREEMENT ................................. 00500 - 1
ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK
...................................................................................... 00500 - 1
ARTICLE 2 CONTRACT DOCUMENTS ..................... 00500 - 1
ARTICLE 3 CONTRACT PRICE.................................. 00500 - 2
ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES
...................................................................................... 00500 - 2
ARTICLE 5 PAYMENTS TO CONTRACTOR ............. 00500 - 3
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR
...................................................................................... 00500 - 3
ARTICLE 7 CONTRACTOR'S REPRESENTATIONS 00500 - 3
ARTICLE 8 MISCELLANEOUS ................................... 00500 - 3
ARTICLE 9 NOTICE AND SERVICE ........................... 00500 - 4
SECTION 00520 ATTACHMENT “A” TO AGREEMENT 00520
- 1
SECTION 00610 PERFORMANCE BOND ............... 00610 - 1
SECTION 00620 PAYMENT BOND .......................... 00620 - 1
SECTION 00700 GENERAL CONDITIONS ............... 00700 - 1
ARTICLE 1 INTERPRETATIONS .................................. 00700 - 1
1.1 Section 00020 Glossary: ..................................... 00700 - 1
1.2 Intent of the Contract Documents: ....................... 00700 - 1
1.3 Priority of the Contract Documents: ..................... 00700 - 2
1.4 Interpretation of Indemnification Provisions: ........ 00700 - 2
1.5 Additional Interpretations: .................................... 00700 - 2
1.6 Ownership and Use of the Contract Documents: 00700 - 3.
1.7 Copies of the Contract Documents: ...................... 00700 - 3
ARTICLE 2 THE OWNERGENERAL PROVISIONS . 00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities:
...................................................................................... 00700 - 3
2.2 Reference Points; Base Lines and Benchmarks:. 00700 - 3
2.3 Stop Work Order: ................................................ 00700 - 3.
2.4 Limitations on the Owner’s Responsibilities: ...... 00700 - 4
2.5 Additional General Provisions:............................. 00700 - 4
2.6 Partnering Charter: ............................................. 00700 - 4.
ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS
...................................................................................... 00700 - 4
3.1 Owner’s Representative: .................................... 00700 - 4
3.2 Clarifications and Interpretations: ........................ 00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays:
...................................................................................... 00700 - 5
3.4 Determinations by the Professional: .................. 00700 - 5
3.5 Limitations on the Professional’s Responsibilities: . 00700 -
ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS
...................................................................................... 00700 - 5
4.1 Review of the Contract Documents: .................... 00700 - 5
4.2 Management, Supervision, and Personnel: ......... 00700 - 5
4.3 Materials and Equipment: .................................... 00700 - 6
4.4 Concerning Control of Work: .............................. 00700 - 6.
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 2 (R 03/22)
4.5 Patent Fees and Royalties: .................................. 00700 - 7
4.6 Use of Premises: ................................................. 00700 - 7
4.7 Record Documents: ............................................. 00700 - 7
4.8 Emergencies: ....................................................... 00700 - 8
4.9 Indemnification: ................................................... 00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS . 00700 - 8
5.1 Employment of Subcontractors: ........................... 00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment: 00700
- 9
5.3 The Contractor’s Continuing Responsibilities: ... 00700 - 9
ARTICLE 6 SUBMITTALS ........................................... 00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals:
...................................................................................... 00700 - 9
6.2 Review and Return of Technical Submittals: .... 00700 - 10.
6.3 Progress Schedule Submittals: .......................... 00700 - 10
6.4 Review and Return of Progress Schedule Submittals:
................................................................................... 00700 - 10.
6.5 Additional Provisions Concerning Submittals: .. 00700 - 10.
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE 00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses):
................................................................................... 00700 - 11.
7.2 Sales and Use Tax and Other Similar Taxes: ... 00700 - 12.
7.3 Safety and Protection: ....................................... 00700 - 12
7.4 Bonds and Insurance - General Requirements: . 00700 - 12
7.5 The Contractor’s Liability Insurance:................ 00700 - 12
7.6 Pollution Liability Insurance: .............................. 00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance): .. 00700 -
7.8 Waiver of Rights: ............................................... 00700 - 13
7.9 Receipt and Application of Proceeds: ................ 00700 - 13
7.10 Unfair Labor Practice: ........................................ 00700 - 13
7.11 Michigan Right-To-Know Law: .......................... 00700 - 13.
7.12 Nondiscrimination: ............................................. 00700 - 14
7.13 Michigan Residency for Employees: .................. 00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION
.................................................................................... 00700 - 15
8.1 Starting the Work: ............................................. 00700 - 15.
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: 00700 -
8.3 Compliance with Contract Time Requirements: . 00700 - 15
8.4 Substantial Completion: ..................................... 00700 - 15
8.5 Partial Use: ........................................................ 00700 - 16
8.6 Division of Responsibilities: ............................... 00700 - 16
8.7 Suspension of Work: ......................................... 00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths: ..... 00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK ... 00700 -
9.1 Warranty: .......................................................... 00700 - 17
9.2 Tests, Inspections and Approvals: .................... 00700 - 17
9.3 Uncovering Work: ............................................. 00700 - 17
9.4 Correction of Work: ........................................... 00700 - 17
9.5 Special Correction Period Requirements: ......... 00700 - 18
9.6 Special Maintenance Requirements: ................ 00700 - 18
ARTICLE 10 CHANGES ............................................ 00700 - 19
10.1 Changes in the Work: ....................................... 00700 - 19
10.2 Differing Subsurface or Physical Site Conditions: .. 00700 - 19.
10.3 Responsibilities for Underground Utilities: ........ 00700 - 20
10.4 Hazardous Material Conditions: ........................ 00700 - 20
10.5 Incidents with Archaeological Features: ........... 00700 - 20
10.6 Unit Price Work: ................................................ 00700 - 21
10.7 Cash Allowances; Provisionary Allowances: .... 00700 - 21
10.8 Change Orders; Change Authorizations: .......... 00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME ................................ 00700 - 22
11.1 General Provisions: .......................................... 00700 - 22
11.2 Changes in Contract Time: ............................... 00700 - 22
11.3 Methods for Making Adjustments in Contract Price: 00700
- 22.
11.4 Labor, Subcontract and Material/Equipment Costs: 00700
- 23
11.5 Construction Equipment Costs: ........................ 00700 - 23
11.6 Rented or Leased Construction Equipment: ..... 00700 - 23
11.7 Owned Construction Equipment: ...................... 00700 - 24
11.8 General Conditions Costs: ................................ 00700 - 24
11.9 Limitations on Allowable Costs: ........................ 00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ................... 00700 - 24.
11.11 Limits on the Fee for the Work Involved: .......... 00700 - 25.
11.12 Fee for Unabsorbed Home Office Overhead: .... 00700 - 25
11.13 Changes in Contract Time for Early Completion:.... 00700 -
11.14 Access to Records: ............................................ 00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data:
.................................................................................... 00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT
.................................................................................... 00700 - 26
12.1. Schedule of Values: .......................................... 00700 - 26
12.2 Requests for Payment: ..................................... 00700 - 27
12.3 Review of Request for Payment; Intent of Review: 00700 -
12.4 Refusal to Make or to Recommend Payment: . 00700 - 27.
12.5 Final Request for Payment: .............................. 00700 - 27
12.6 Final Payment and Acceptance: ....................... 00700 - 28
12.7 Contractor’s Continuing Obligation: ................ 00700 - 28
12.8 Waiver of Claims: ............................................. 00700 - 28
ARTICLE 13 OTHER WORK ..................................... 00700 - 28
13.1 Related Work at Site: ........................................ 00700 - 28
13.2 Coordination Requirements: ............................. 00700 - 29
13.3 Claims Between the Contractor and Other Parties: 00700
- 29
ARTICLE 14 TERMINATION ..................................... 00700 - 29
14.1 Notice Requiring Assurance of Due Performance: 00700 -
29.
14.2 Contractor Default and Termination for Cause:.... 00700 -
14.3 Surety Default: .................................................. 00700 - 31
14.4 Termination for Convenience of the Owner: .... 00700 - 31
14.5 The Contractor May Suspend Work: ............. 00700 – 31.
ARTICLE 15 DISPUTES ........................................... 00700 - 31
15.1 Claims Under This Article: ................................ 00700 - 31
15.2 Requirement for Certification of Contractor Claims: 00700
- 32
15.3 Recommendations or Decisions from the Professional:
.................................................................................... 00700 - 32
15.4 Determinations by the Director-DCD: .............. 00700 - 32
15.5 Supplements to AAA Arbitration: ...................... 00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: 00700 - 33
15.7 Venue; Flow-Through Provision: ...................... 00700 - 33
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1
SECTION 01310 PROGRESS SCHEDULE ...................................................................................................................... 01310 - 1
DIVISION 01 00 00 GENERAL REQUIREMENTS
011000 SUMMARY OF WORK
012119 COORDINATION & MEETINGS
016100 PRODUCT REQUIREMENTS
017719 CONTRACT CLOSE OUT
DIVISIONS 02 40 00 DEMOLITION AND STRUCTURE MOVING
024119 SELECTIVE DEMOLITION
DIVISION 04 00 00 MASONRY
042000 UNIT MASONRY
DIVISIN 05 00 00 METALS
055000 METAL FABRICATIONS
DIVISION 07 90 00 JOINT PROTECTION
079200 JOINT SEALANTS
DIVISION 08 10 00 DOORS AND FRAMES
081100 STEEL DOORS AND FRAMES
087100 DOOR HARDWARE
DIVISION 09 00 00 FINISHES
099100 PAINTING
DIVISION 22 07 00 PLUMBING INSULATION
220719 PLUMBING PIPING INSULATION
DIVISION 22 10 00 PLUMBING PIPING
221116 DOMESTIC WATER PIPING
DIVISION 23 05 COMMON WORK RESULTS FOR HVAC
230500 BASIC MECHANICAL REQUIREMENTS
230505 SELECTIVE DEMOLITION FOR HVAC
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230519 METERS AND GAUGES FOR HVAC PIPING
230523 GENERAL DUTY VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING ADJUSTING AND BALANCING FOR HVAC
DIVISION 23 07 00 HVAC INSULATION
230716 HVAC EQUIPMENT INSULATION
230719 HVAC PIPING INSULATION
DIVISION 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
230913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
230993 SEQUENCE OF OPERATION FOR HVAC CONTROLS
DIVISION 23 10 00 FACILITY FUEL SYSTEMS
231123 FACILITY NATURAL GAS PIPING
DIVISION 23 21 00 HYDRONIC PIPING AND PUMPS
232113 HYDRONIC PIPING
232116 HRDRONIC PIPING SPECIALTIES
232123 HYDRONIC PUMPS
DIVISION 23 23 00 REFRIGERANT PIPING
232313 REFRIGERANT PIPING AND VALVES
232316 REFRIGERANT PIPING SPECIALTIES
DIVISION 23 25 00 HVAC WATER TREATMENT
232513 WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS
DIVISION 23 31 00 HVAC DUCTS AND CASINGS
233113 METAL DUCTS
DIVISION 23 33 00 AIR DUCT ACCESSORIES
233313 DAMPERS
DIVISION 23 36 00 TERMINAL UNITS
233616 VARIABLE AIR VOLUME UNITS
DIVISION 23 51 00 BREECHINGS, CHIMNEYS AND STACKS
235123 GAS VENTS
DIVISION 23 52 00 HEATING BOILERS
235216 CONDENSING BOILERS
DIVISION 23 62 00 PACKAGED COMPRESSOR AND CONDENSER UNITS
236213 PACKAGED AIR-COOLED REFRIGERANT COMPRESSOR AND CONDENSER UNITS.
DIVISION 23 82 00 CONVECTION HEATING AND COOLING UNITS
238216 AIR COILS
DIVISIONS 26 ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
262913 MANUAL AND MAGNETIC MOTOR CONTROLLERS
DIVISIONS 28 00 00 ELECTRONIC SAFETY
28 00 10 TECHNOLOGY AND INSTALLATION STARDARDS
DIVISION 40 90 00 PRIMARY CONTROL DEVICES409700 VARAIBLE FREQUENCY DRIVES
DRAWINGS - BOUND SEPARATELY
GUS HARRISON CORRECTIONAL FACILITY BUILDING 200 & 300
COVER SHEET & DRAWING INDEX
ARCHITECTURAL
A1 MD-200 MECH RM ARCHITECTURAL DEMO
A2 M-200 MECH RM ARCHITECTURAL
MECHANICAL
MS-200.1 B-200 MECHANICAL EQUIPMENT SCHEDULES
MS-200.2 B-200 MECHANICAL EQUIPMENT SCHEDULES
MD-201.0 B-200 FIRST FLOOR COMPLETE
MD-201.1 B-200 1ST FLR PARTIAL DEMO
MD-201.2 B-200 1ST FLR PARTIAL DEMO
MD-201.3 B-200 1ST FLR PARTIAL DEMO
MD-201.4 B-200 1ST FLR PARTIAL DEMO
MD-202 B-200 2ND FLR REFERENCE
MD-200-M B-200 MECH DEMO
MD-200-R B-200 ROOF DEMO
M-201.1 B-200 1ST FLR PARTIAL NEW WORK
M-201.2 B-200 1ST FLR PARTIAL NEW WORK
M-201.3 B-200 1ST FLR PARTIAL NEW WORK
M-201.4 B-200 1ST FLR PARTIAL NEW WORK
M-200 B-200 MECH ROOM NEW WORK
M-200-R B-200 ROOF NEW WORK
MS-300.1 B-300 MECHANCIAL EQUIPMENT SCHEDULES
MS-300.2 B-300 MECHANCIAL EQUIPMENT SCHEDULES
MD-301.0 B-300 FIRST FLOOR COMPLETE
MD-301.1 B-300 1ST FLR PARTIAL DEMO
MD-301.2 B-300 1ST FLR PARTIAL DEMO
MD-301.3 B-300 1ST FLR PARTIAL DEMO
MD-301.4 B-300 1ST FLR PARTIAL DEMO
MD-301.5 B-300 1ST FLR PARTIAL DEMO
MD-300-M B-300 MECH DEMO
MD-300-R B-300 ROOF DEMO
M-301.1 B-300 1ST FLR PARTIAL NEW WORK
M-301.2 B-300 1ST FLR PARTIAL NEW WORK
M-301.3 B-300 1ST FLR PARTIAL NEW WORK
M-301.4 B-300 1ST FLR PARTIAL NEW WORK
M-301.5 B-300 1ST FLR PARTIAL NEW WORK
M-300-M B-300 MECH ROOM NEW WORK
M-300-R B-300 ROOF NEW WORK
TEMPERATURE CONTROLS
M-200-TC-D1 EXIST AHU-1 CONTROLS DEMO
M-200-TC-D2 EXIST AHU-2 CONTROLS DEMO
M-200-TC-D3 EXIST AHU-3 CONTROLS DEMO
M-200-TC-D4 EXIST AHU-4 CONTROLS DEMO
M-200-TC-D5 EXIST BOILER, MISC CONTROLS DEMO
M-200-TC-D6 EXIST UH, CUH, FTR CONTROLS DEMO
M-200-TC-D7 EXIST FAN CONTROLS DEMO
M-200-TC-1 AHU-1 CONTROLS
M-200-TC-2 AHU-2 CONTROLS
M-200-TC-3 AHU-3 CONTROLS
M-200-TC-4 AHU-4 CONTROLS
M-200-TC-5 BOILER, MISC CONTROLS
M-200-TC-6 UH, CUH, FTR CONTROLS
M-200-TC-7 FAN CONTROLS
M-300-TC-D1 EXIST AHU-1 CONTROLS DEMO
M-300-TC-D2 EXIST AHU-2 CONTROLS DEMO
M-300-TC-D3 EXIST AHU-3 CONTROLS DEMO
M-300-TC-D4 EXIST AHU-4 CONTROLS DEMO
M-300-TC-D5 EXIST AHU-5 CONTROLS DEMO
M-300-TC-D6 EXIST HHWS/R CONTROLS DEMO
M-300-TC-D7 EXIST FAN CONTROLS DEMO
M-300-TC-1 AHU-1 CONTROLS
M-300-TC-2 AHU-2 CONTROLS
M-300-TC-3 AHU-3 CONTROLS
M-300-TC-4 AHU-4 CONTROLS
M-300-TC-5 AHU-5 CONTROLS
M-300-TC-6 HHWS/R CONTROLS
M-300-TC-7 FAN & MISC CONTROLS
ELECTRICAL
E001 ELECTRICAL DRAWING INDEX, SYMBOL LIST AND GENERAL ELECTRICAL NOTES
ED100.1 B200 MECHANICAL ROOM FLOOR PLAN – ELECTRICAL DEMOLITION
MICHSPEC DTMB 00020 - 3 (R 03/22)
E100.1 B200 MECHANICAL ROOM FLOOR PLAN – ELECTRICAL NEW WORK
E200.1 B200 ELECTRICAL SCHEDULES AND MISCELLANEOUS WIRING DIAGRAMS
ED100.2 B300 MECHANICAL ROOM FLOOR PLAN – ELECTRICAL DEMOLITION
E100.2 B300 MECHANICAL ROOM FLOOR PLAN – ELECTRICAL NEW WORK
E200.2 B300 ELECTRICAL SCHEDULES AND MISCELLANEOUS
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.
Bidder The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board The Administrative Board of the State of Michigan.
Bonds Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Contact Person Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Contract Award The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.
Contract Documents Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.
Contract Float Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.
Contract Price The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).
Contract Times The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.
Contractor Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.
Correction Period The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.
Cost of the Work Involved The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.
CPM Schedule Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
Critical Path Method (CPM) The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.
Date of Commencement of the Contract Time The date when the Contract Time starts to run.
Defective An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.
Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.
Delay Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.
*Department (DTMB) Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.
Director-SFA- The Director of DTMB State Facilities Administration.
Director-DCD- The Director of DTMB State Facilities Administration, Design and Construction Division
Division Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.
Drawings Part of the Contract Documents showing the Work.
Drawings shall neither serve nor be used as Shop Drawings.
Early (Late) Dates Early (late) times of performance for the Activities.
MICHSPEC DTMB 00020 - 3 (R 03/22)
Emergency A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.
Fee for the Work Involved (Fee) A negotiated, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.
General Requirements Division 1 of the Specifications.
Hazardous Material Asbestos, ACBMs, PCBs, petroleum products, such construction materials as paint thinners, solvents, gasoline, oil, etc., and any other like material the manufacture, use, treatment, storage, transportation, or disposal of which is regulated by federal, State, or local Laws governing the protection of public health, natural resources, or the environment.
State Facilities Administration- Entity in the Department of Technology, Management and Budget responsible for design, construction, and operations and maintenance of facilities and capital renewal.
State Facilities Administration Representative- Designated DTMB-SFA Design and Construction Division Project Director (a) Responsible for directing and supervising the Professional’s services during the period allowed for completion of the Work; and/or (b) Acting as representative for the Owner and for the enforcement of the Contract Documents, approving payment to the Contractor and coordinating the activities of the State, Owner, Professional and Contractor.
Law(s) Means federal, state, and local statutes, ordinances, orders, rules and/or regulations.
MCL The Michigan Compiled Laws of the State of Michigan.
Means and Methods Includes means, methods, techniques, sequences and/or procedures applicable to the Work.
Notice of Award Written notice accepting the Bid to the lowest responsive, responsible Bidder and designating the Contract Price (and establishing the Alternates accepted by the Owner).
Notice to Proceed Written notice authorizing the Contractor to proceed with the Work, or a designated portion of the Work, and establishing the Date of Commencement of the Contract Time.
On-Site Inspection– The Professional’s on-site examination of the Contractor’s completed or in progress Work to determine and verify to the State Facilities Administration Representative that the quantity and quality of all Work is in accordance with the requirements of the Contract Documents.
Owner The State of Michigan, named "the Owner" in Section 00500 Agreement, with whom the Contractor has entered into the Contract and for whom the Work is to be provided. The State of Michigan includes its departments, agencies, boards, commissions, officers, employees, and agents.
Partial Use The use, by the Owner, of a designated portion of the Work before accomplishing Substantial Completion of the entire Work. Partial Use does not implicate or refer to Substantial Completion of the portion of the Work placed in use by the Owner.
Person Individuals, partnerships, corporations, receivers, trustees, joint ventures, and any combinations of any of them.
Political Subdivision Any county, city, village, or other local unit of the State, including any agency, department, or instrumentality of any such county, city, village, or other local unit.
PreAward Schedule A Qualification Submittal required of the Apparent Low Bidder before Contract Award, and which is used by the Owner in the evaluation of the Apparent Low Bidder’s Bid.
Professional Services Contractor (Professional) The Person or its authorized representative licensed to practice architecture and/or engineering, named as "Professional" in Section 00500 Agreement, who has the right and authority assigned in the Contract Documents. The term Professional includes the Professional's consultants practicing the disciplines required by the Contract Documents. If the Owner will function as the Professional, such information will be noted in Section 00800 Supplementary Conditions or at the pre-construction conference.
Progress Schedule Work Schedule that shows the Contractor's approach to planning, scheduling, and execution of the Work and that accurately portrays completed Work as to sequencing and timing, as provided in the Contract Documents.
Project The total construction, which includes the Work and possibly other work, as indicated in the Contract Documents.
Project Field Representative A DTMB-SFA Design and Construction employee or consultant, acting in collaboration and with direction from the DTMB-SFA-DCD Project Director, providing on-site, periodic observation and documentation of the Work for compliance with the Contract Documents.
Project Manual– The Book of Specifications, containing Division 0 of the Specifications and the technical Specifications.
Provisionary or Contingency Allowance An amount included within the Contract Price to reimburse the Contractor for the cost to furnish and perform Work that is uncertain, i.e., may not be required, or is of indeterminate scope, i.e., design information and quantities, complexity, etc. are neither shown nor detailed in the Contract Documents. Work authorized under any Provisionary Allowance may consist of (a) changes required by actual conditions, as determined by the Professional, that are incorporated into the Work in accordance with Section 00700 General Conditions, and (b) any other Work authorized and completed under the pertinent provisions of the Contract Documents. Unlike a Cash Allowance, payments under a Provisionary Allowance shall include not only the purchase/furnished cost of the materials
MICHSPEC DTMB 00020 - 4 (R 03/22)
and equipment involved, but also all related labor costs, Subcontract costs, construction equipment costs, general conditions costs and Fee, provided they are calculated in accordance with the requirements of Articles 10 and 11 of Section 00700 General Conditions.
Public Utility Any utility company, utility department or agency of a Political Subdivision, natural gas pipeline company, cable TV company, or any other owner/operator of utilities that are operated or maintained in, on, under, over or across public right-of-way or public or private easements and which is defined as “Public Utility” under the provisions of 1974 PA 53, as amended, MCL 460.701.
Punch List A list of minor items to be completed or corrected by the Contractor, any one of which do not materially impair the use of the Work, or the portion of the Work inspected, for its intended purpose. A Punch List shall be prepared by the Professional upon having decided that the Work, or portion of the Work inspected, is substantially complete and shall be attached to the respective certificate of Substantial Completion.
Qualification Submittals Data concerning a Bidder's qualifications and eligibility, as specified in the Bidding Requirements.
Rebid A revised or new Bid submitted by a Bidder on the Section 00300 Bid Summary and Bid Form and the Bid Form Attachments made available through post-Bid Addenda, in the event the Work is rebid without readvertising, as allowed by post-Bid Addenda.
Record Documents Drawings, Specifications, Addenda, Change Orders, Change Authorizations, Bulletins, inspection, test and approval documentation, photographs, written clarifications and interpretations and all other documents recording, or annotated to show, all revisions and deviations between the as-built installation and the Contract Documents, all approved Submittals and all clarifications and interpretations.
Records Books, reports, documents, and other evidence relating to the bidding, award and furnishing and performance of the Work.
Record Schedule A Progress Schedule Revision Submittal returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
*Recycled Material Recycled paper products, structural materials made from recycled plastics, refined lubricating oils, reclaimed solvents, recycled asphalt and concrete, recycled glass products, retreaded tires, ferrous metals containing recycled scrap metals and all other materials that contain (a) waste materials generated by a business or consumer, (b) materials that have served their intended purpose, and/or (c) materials that have been separated from solid waste for collection, recycling and disposition in the percentage determined by the State as provided by Law.
Request for Payment The form provided by the Owner (Payment Request DMB-440) to be used by the Contractor in requesting payment for Work completed, which shall enclose all supporting information required by the Contract Documents.
Resident Project Representative The authorized representative of the Professional who is assigned to the site.
Schedule of Values A schedule of pay items, which subdivides the Work into its various parts and which details, for each itemized part, cost and pricing information required for making payments for Work performed. The sum of all pay item costs in the Schedule of Values shall equal the Contract Price for the Work.
Shop Drawings Includes drawings, diagrams, illustrations, standard schedules, performance charts, instructions and other data prepared by or for the Contractor to illustrate some part of the Work, or by a Supplier and submitted by the Contractor to illustrate items of material or equipment.
Soil Erosion and Sedimentation Control– The planning, design and installation of appropriate Best Management Practices designed and engineered specifically to reduce or eliminate the off-site migration of soils via water runoff, wind, vehicle tracking, etc. Soil erosion and sedimentation control in the State of Michigan is regulated under The Natural Resources Environmental Protection Act; Soil Erosion and Sedimentation Control, 1994 PA 451, Part 91, as amended, MCL 324.9101 et seq. Soil erosion and sedimentation control associated with this Contract is monitored and enforced by the Department of Technology, Management and Budget, State Facilities Administration.
Specifications Parts of the Contract Documents organized into Divisions. "Technical Specifications" means Divisions of the Specifications consisting of technical descriptions of materials, equipment, construction systems, standards, and workmanship.
State The State of Michigan in its governmental capacity, including its departments, agencies, boards, commissions, officers, employees, and agents. Non-capitalized references to a state refer to a state other than the State of Michigan.
*State Construction Code The Michigan State Construction Code Act, 1972 PA 230, as amended, MCL 125.1501 et seq.
Sub agreement A subcontract or purchase order awarding a part of the Work to a Subcontractor or Supplier.
Subcontractor A Person having a Sub agreement for providing labor at the site, or for providing labor at the site and furnishing materials and/or equipment for incorporation into the Work.
Submittals Includes technical Submittals, Progress Schedules and those other documents required for submission by the Contract Documents. The term "technical Submittal" includes Shop Drawings, brochures, samples, Operation and Maintenance (O&M) Manuals, test procedures and any other Submittal the Contract Documents require the Contractor to submit to demonstrate how the items covered, after installation or incorporation into the Work, will conform to the information given in the Contract Documents and be
MICHSPEC DTMB 00020 - 5 (R 03/22)
compatible with the design of the completed Work as a functioning whole as indicated in the Contract Documents.
Substantial Completion The Work, or a portion of the Work designated in the Contract Documents as eligible for separate Substantial Completion, has been completed in accordance with the Contract Documents, to the extent that the Owner can use or occupy the entire Work, or the designated portion of the Work, for the use intended without any outstanding, concurrent Work at the site, except as may be required to complete or correct Punch List items. Prerequisites for Substantial Completion, over and above the extent of Work completion required, include (a) receipt by the Owner of operating and maintenance documentation, (b) all systems have been successfully tested and demonstrated by the Contractor for their intended use, and (c) the Owner having received all required certifications and/or occupancy approvals from the State and those Political Subdivisions having jurisdiction over the Work. Receipt of all certifications and/or occupancy approvals from those Political Subdivisions with jurisdiction in and of itself does not necessarily connote Substantial Completion.
Supplementary Conditions Section 00800 within Division 0 of the Specifications that amends and/or supplements Section 00700 General Conditions and other designated Contract Documents.
Supplementary Instructions Section 00120 within Division 0 of the Specifications that amends and/or supplements Section 00100 Instructions to Bidders and any other designated Bidding Requirement.
Supplier A manufacturer or fabricator, or a distributor, material man or vendor representing a manufacturer or fabricator, who has a Sub agreement for furnishing materials and/or equipment.
Target A point of progress for a key part of the Work, which is identified for monitoring progress of the Work. Target Times are not Contract Times.
Total Float Number of Calendar Days by which the Work or any part of the Work may be delayed from its Early Dates without necessarily causing an overrun in a pertinent Contract Time. Total Float is by definition at least equal to Contract Float.
Underground Utilities Pipelines, piping, conduit, duct, cables, wells, tanks, tunnels and appurtenances, or other similar facilities, installed underground to convey or support conveyance of potable water, sprinkler or irrigation water, fire protection systems, electricity, gases, steam, petroleum products, sewerage and drainage removal, telephone, communications, cable TV, traffic, or control systems.
Unit Price Work, Contingent Work involving specified but undefined quantities (i.e., related Work quantities are not detailed in the Contract Documents) which when performed is measured by the Professional and paid using the measured quantities and unit prices contained in the Contract Documents. Performance of such Unit Price Work is contingent upon conditions encountered at the site, as determined, and authorized by the Professional.
Unit Price Work, Specified Work of specified and defined quantities (i.e., quantities are detailed in, and can be taken-off from, the Contract Documents) that when performed is measured by the Professional and paid based on the measured quantities and unit prices contained in the Contract Documents.
Work (as in “the Work,” "the entire Work) The entire completed Construction required by the Contract Documents.
The Work results from furnishing and performing all services, obligations, responsibilities, management, supervision, labor, materials, equipment, construction equipment, general conditions, permits, taxes, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, field supplies, Bonds, insurance, mobilization, close-out, overhead and all connections, devices and incidental items of any kind or nature required and/or made necessary by the Contract Documents.
Work Involved, any Work InvolvedExisting or prospective Work (a) reflected in any notice, proposal, or claim, or (b) reflected in changes ordered or in process, or (c) affected by Delay.
1.1.2. Other defined terms used in Division 0 but not
assigned intent and meanings in this Section 00020 Glossary have the intent and meanings set forth in MCL or Section 00800 Supplementary Conditions.
1.1.3. Terms defined in this Section 00020 Glossary and
used in other Specifications and/or in the Drawings in lower cases, or as capitalized terms, have the intent and meanings assigned to them in this Section 00020 Glossary if the context will permit.
1.2 Division 0 Rules of Construction:
1.2.1. Each Article in a Section in Division 0 contains
“sub-articles,” numbered as this sub-article 1.2 is numbered;
“parts,” numbered as this part 1.2.1 is numbered, and “sub-parts,” all of which are considered "paragraphs." A reference to a paragraph means a reference to the sub-article, part or sub-part, or any combination of any of them, if the context will permit.
1.2.2. Any reference to an Article or a paragraph in a
Section within Division 0 means a reference to an Article or a paragraph in the very Section in which the reference is made, unless that reference specifically names another Section.
1.2.3. Whenever the context of any provision requires, the
singular number includes the plural number and vice versa, and the use of any gender includes all genders
END OF SECTION 00020
STATE OF MICHIGAN (OWNER AND CONTRACTOR) ADVERTISEMENT
MICHSPEC DTMB 00030 - 1 (R 03/22)
SECTION 00030 ADVERTISEMENT
1. Invitation to Bid (ITB) Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService until 2:00 p.m., ET, on 3/6/2024. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.
2. Work Description The Work, GUS HARRISON
CORRECTIONAL FACILITY – BLDG 200 BOILER
REPLACEMENT & BLDG 300 HVAC REPLACEMENT,
Agency No. MDOC, File No. 472-22350.MNB includes, but is not necessarily limited to DEMOLITION AND
REPLACEMENT OF BOILERS, PUMPS, AIR HANDLING
UNIT COILS AND PUMPS AND ASSOCIATED SYSTEMS
AS WELL AS ONE AIR COOLED CONDENSER AND
ASSOCIATED SYSTEMS IN BLDG 200. DEMOLITION AND
REPLACEMENT OF PUMPS, AIR HANDLING UNIT COILS
AND PUMPS, ONE REMOTE AIR COOLED CONDENSER,
DX COIL AND ASSOCIATED SYSTEMS IN BLDG 300.
DEMOLITION OF EXISTING PNEUMATIC TEMPERATURE
CONTROLS AND INTEGRATION OF NEW TEMPERATURE
CONTROLS INTO THE EXISTING BUILDING
MANAGEMENT SYSTEM IN BUILDINGS 200 AND 300.
The site is located at 2727 East Beecher St., Adrian, MI 49221, as shown on the Drawings.
3. Bidding Documents Sets of Bidding Documents may be obtained at:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
4. Bid Security Each Bid shall enclose Bid Security, as specified in…
This is the start of the file's text. The full file is on GovTribe.