Construction Add 2 472_22350.pdf
PDF 169 KB Posted
- Solicitation number
- RFQ - 171 - 240000000186
- Issued by
- Lenawee County, Michigan
About this file
This document is a Construction Bid Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division, regarding a project for the Gus Harrison Correctional Facility. The project involves the replacement of the boiler in Building 200 and the HVAC system in Building 300 at the facility. The bid opening date is scheduled for March 6, 2024. A pre-bid walkthrough meeting will be held on January 30, 2024, at the facility. Bidders are required to acknowledge receipt of this addendum in their bid submissions.
The contract opportunity is for the state of Michigan, specifically Lenawee County. Bidders are instructed not to submit questions through the SIGMA VSS system, but rather to email them directly to the project contact, JoAn Kutylowski Mende. Bid attachments must be uploaded to the SIGMA VSS system, and individual attachments cannot exceed 6 MB in size. Bidders experiencing issues with the SIGMA VSS system should contact the SIGMA Help Desk and notify the Office of Design and Construction.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
1/22/2023
PROJECT NAME
GUS HARRISON CORRECTIONAL FACILITY
BLDG 200 BOILER REPLACEMENT
BLDG 300 HVAC REPLACEMENT
FILE NUMBER
472/22350.MNB
PROFESSIONAL
JoAn Kutylowski Mende
PROJECT DIRECTOR
Chris Bahjet
BID OPENING DATE:
3/6/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Pre Bid Walkthrough meeting time is 10:00 AM on January 30th, 2024 at the Gus Harrison Facility site.
Meet at the Administration Building at Gus Harrison Correctional Facility.
2727 East Beecher St. Adrian, MI 49221
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE: Click to enter date
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date http://www.michigan.gov/SIGMAVSS
File details come from the government source that posted it. Updated .