Construction Add 5 472-22350.pdf
PDF 144 KB Posted
- Solicitation number
- RFQ - 171 - 240000000186
- Issued by
- Lenawee County, Michigan
About this file
This document is a Construction Bid Addendum No. 5 issued by the Michigan Department of Technology, Management and Budget (DTMB) for the GUS HARRISON CORRECTIONAL FACILITY B200 BOILER REPLACEMENT & B300 HVAC REPLACEMENT project, with the project file number 472-22350.MNB. The addendum advises that the proposed Riello AR4000 condensing boiler will not be accepted for the project. The bid opening date is 3/6/2024, and bidders must acknowledge this addendum as part of the bid submittal.
The related state and local contract opportunity is for the 472/22350. MNB; GHCF - BLDG 200 Boiler Replacement project, located in Lenawee County, Michigan. Bidders are instructed to email questions to the project engineer, JoAn Kutylowski Mende, and to upload bid attachments to the SIGMA VSS system. Emailed submissions will be handled on a case-by-case basis and must be received prior to the 2:00 p.m. deadline to be considered responsive.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 5
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/15/2024
PROJECT NAME
GUS HARRISON CORRECTIONAL FACILITY
B200 BOILER REPLACEMENT & B300 HVAC REPLACEMENT
FILE NUMBER
472-22350.MNB
PROFESSIONAL
MENDE ENGINEERING SOLUTIONS
PROJECT DIRECTOR
CHRIS BAHJET, PE
BID OPENING DATE:
3/6/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
The proposed Riello AR4000 condensing boiler will not be accepted for the project.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: JoAn Kutylowski Mende, PE DATE: 2/15/2024
APPROVED BY:
PROJECT DIRECTOR: Chris Bahjet, PE DATE: 2/15/2024 http://www.michigan.gov/SIGMAVSS