Construction Add 6 472-22350.pdf

PDF 166 KB Posted

Attached to
472/22350. MNB; GHCF - BLDG 200 Boiler Replacement
Solicitation number
RFQ - 171 - 240000000186
Issued by
Lenawee County, Michigan

About this file

This document is a Construction Bid Addendum No. 6 issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Gus Harrison Correctional Facility B200 Boiler Replacement & B300 HVAC Replacement project, file number 472-22350.MNB. The addendum provides clarification that equipment noted on the drawings is to be replaced, and the bid opening date is set for March 6, 2024. The project is located in Lenawee County, Michigan.

The bid documents indicate that all questions should be emailed to the project engineer, and bid attachments must be uploaded to the SIGMA VSS system, as hard copies will not be accepted. Bidders are instructed to contact the SIGMA Help Desk if they experience any issues with the electronic submission process, and they may be asked to email their proposal if approved by the Office of Design and Construction. Emailed submissions must be received prior to the 2:00 p.m. bid deadline to be considered responsive and responsible.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 10/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 6

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

2/22/2024

PROJECT NAME

GUS HARRISON CORRECTIONAL FACILITY

B200 BOILER REPLACEMENT & B300 HVAC REPLACEMENT

FILE NUMBER

472-22350.MNB

PROFESSIONAL

MENDE ENGINEERING SOLUTIONS

PROJECT DIRECTOR

CHRIS BAHJET, PE

BID OPENING DATE:

3/6/2024

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

CLARIFICATION: NOTE 1 ON EQUIPMENT SCHEDULES FOR VAV AND VVR ON SHEET MS-300.1

SHOULD READ:

“NOTE 1. EQUIPMENT TO BE REPLACED. REFER TO PLANS FOR LOCATIONS.”

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: JoAn Kutylowski Mende, PE DATE: 2/22/2024

APPROVED BY:

PROJECT DIRECTOR: Chris Bahjet, PE DATE: 2/22/2024 http://www.michigan.gov/SIGMAVSS