0018-IDIQ-SpecQuestforAmend.docx
DOCX document 16 KB Posted
- Attached to
- Multiple Award, Indefinite Delivery/Indefinite Quantity (IDIQ) for WV & VA Federal contract opportunity
- Solicitation number
- GS-03P-13-CD-D-0018
About this file
0018-IDIQ-SpecQuestforAmend
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0018-IDIQ-WVVA
Amendment 8/12/13
Questions from bidders
1. Q. On factor #3, Project Specific Knowledge there is a 3 page maximum, with the project schedule include that gives you only 2 pages of text. Is the project schedule included in the 3 page maximum or not?
A. Offerors shall provide a narrative (3 pages maximum) of text, the Preliminary Schedule will be a separate page outside of text
2. Q. Can you clarify bonding requirements?
A. A 20% bid bond for the seed project along with 100% payment and performance bonds for the seed project are required after award. Additional bonding will be per task order.
3. Q. Will a West Virginia business license be required for bidding on this or can one be acquired upon award?
ANSWER: ALL LICENSES APPLICABLE TO CONSTRUCTION CAN BE ACQUIRED UPON AWARD AND WILL BE REQUIRED BY THE CONTRACTING OFFICER PRIOR TO NTP. ALL CONTRACTORS INCLUDING SUBCONTRACTORS MUST BE LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED WHETHER WEST VIRGINIA OR VIRGINIA. THE IDIQ TERM CONSTRUCTION CONTRACT WILL INVOLVE WORK IN BOTH STATES.
4. Q. Is there an anticipated amount of fire alarm, security system, or electrical work to be completed?
ANSWER: PLEASE REVIEW THE CONTRACT DOCUMENTS ENTITLED,” ABINDGDON FEDERAL BUILDING & COURTHOUSE-FIRST & SECOND FLOOR RENOVATIONS DATED 5/24/2013, AS PREPARED BY THE A/E OF RECORD, AECOM TECHNICAL SERVICES INC. FOR DESCRIPTIONS AND SPECIFICATIONS FOR THESE SCOPES OF WORK.
5. Q.1 On page 7 of solicitation says projects within the last 7 years (2005-2012), should this time period be 2006-2013?
A. The timeframe of past performance of projects should be from 2006-2013.
6. Q. How should the Owner Reference Evaluation Form be submitted?
A. The forms should be separately sealed and submitted along with the technical proposal. Use forms uploaded on www.fbo.gov on 7/24/13 or indicate on forms both evaluator & evaluatee names.
NOTES:
ALL EXISTING SHELVING, BOOKCASES & BOOKS AS CURRENTLY LOCATED IN THE 1STFLOOR LAW LIBRARY A118 WILL BECOME THE PROPERTY OF THE CONTRACTOR UPON CONTRACT AWARD. THESE ITEMS ARE TO BE REMOVED FROM THE SPACE UPON MOBILIZATION AND COMMENCEMENT OF DEMOLITION.
THE ATTACHED BID FORM IS TO BE COMPLETED IN ADDITION TO THE SF 1442.
THE EVALUATED BID PRICE WILL BE BASED UPON THE ADDITION OF BASE BID, PLUS OPTIONS 1-4, PLUS UNIT PRICES 1-7.