0018-ADD'LBIDFORM.pdf
PDF 14 KB Posted
- Attached to
- Multiple Award, Indefinite Delivery/Indefinite Quantity (IDIQ) for WV & VA Federal contract opportunity
- Solicitation number
- GS-03P-13-CD-D-0018
About this file
previously uploaded 0018-ADD'LBIDFORM
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Unit Quantity Total Cost
THE BASE PROJECT SCOPE OF WORK WILL CONSIST OF ALL RENOVATIONS WORK
ASSOCIATED WITH THE INSTALLATION OF A NEW USMS SALLEY PORT AND HOLDING CELL
AREAS AND NEW TRIAL JURY CONFERENCE ROOM AND ASSOCIATED RESTROOMS
ON THE FIRST FLOOR OF THE OF THE FEDERAL BUILDING.
ALSO INCLUDED IS THE RENOVATION IS A NEW GRAND JURY HEARING ROOM
AND ASSOCIATED HOLDING CELLS AND RESTROOMS ON THE SECOND FLOOR OF THE
FEDERAL BUILDING. THIS WORK WILL ALSO INCLUDE ALL ASSOCIATED ABATEMENT,
DEMOLTION, ORNAMENTAL WOOD WORK, FINISHES, FURNISHINGS AND MEP WORK
FOR THESE AREAS PER CONTRACT DOCUMENTS DATED 5/06/2013, AS PREPARED BY AECOM.
LS 1
Subtotal: -$
THIS SOW WILL CONSIST OF THE SUPPLY AND INSTALLATION OF TWENTY-THREE
FIXED JURY BASE CHAIRS WITH WOOD TABLET ARMS IN GRAND JURY ROOM 243
PER SPECIFICATIONS. EA 23 -$
Subtotal: -$
THIS SOW WILL CONSIST OF THE SUPPLY AND INSTALLATION OF ONE
REMOVABE JURY CHAIR WITH WOOD TABLET ARMS IN GRAND JURY ROOM 243
PER SPECIFICATIONS. EA 1 -$
Abingdon Federal Building & U.S. Courthouse
First & Second Floor Renovation Project
BID FORM
Abingdon, Virginia
Bid Option No. 2 - Removable Jury Chair
Bid Option No. 1 -Fixed Jury Base Chair
Plaza Site Elements-BASE BID
SOLICITATION #GS-03P-13-CD-D-0018
PER SPECIFICATIONS. EA 1
Subtotal: -$
THIS SOW WILL CONSIST OF NEW FINISHES & LIGHTING IN THE MAIN 2ND FLOOR PUBLIC
CORRIDOR TO MATCH THE FINISHES AS SCHEDULED FOR SECURED COORIDOR R239. THE
FLOOR FINISH FOR PUBLIC CORRIDOR WILL BE RESISLIENT TILE & BASE PER SPECIFICATION
SECTIONS 096513 & 096519. SOW WILL ALSO INCLUDE ALL APPLICABLE DEMOLITION,
PAINTING OF ALL EXISTING WALLS & CEILING & APPLICABLE DOORS PER SECTION 099123.
PROVIDE (11) TYPE B LIGHTING FIXTURES & (4) TYPE Be ALL WITH APPLICABLE TRIM.
THE SOW WILL ENCOMPASS ENTIRE CORRIDOR FROM DOOR R239 TO ELEVATOR LOBBY. LS 1 -$
Subtotal: -$
THIS SOW WILL CONSIST OF SUBSTITUTING FLOOR FINISH TZ1 FOR CPT3 IN
R160 SECURED CORRIDOR & R167 SALLEYPORT. LS 1 -$
Subtotal: -$
Unit Price #1- Removal & Disposal of Abestos-containing Floor Tile SF 100 -$
Unit Price #2- Removal & Disposal of Abestos-containing Floor Tile Mastic Material SF 100 -$
Unit Price #3-Removal & Disposal of Abestos-containing Carpet Mastic Material SF 100 -$
Unit Price #4- Removal & Disposal of Abestos-containing Base Board Adhesive Material SF 100 -$ Unit Price #5- Removal & Disposal of Abestos-containing Base Terrazzo Flooring Material SF 100 -$ Unit Price #6- Removal & Disposal of PCB Ballasts EA 100 -$ Unit Price #7- Removal & Disposal of Mercury-containing Fluorescent Bulb EA 100 -$
Subtotal: -$
* ALL PRICES TO INCLUDE APPLICABLE OH&P
Total Bid -$
Unit Prices #1-#7
Bid Option No. 3 - 2nd Floor Corridor A200
Bid Option No. 4 - FLOOR FINISHES R160 & R167