GeoXO Spacecraft Final RFP Cover Letter.pdf
PDF 593 KB Posted
- Attached to
- Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP Federal contract opportunity
- Solicitation number
- 80GSFC23R0010F
About this file
This request for proposal issued by the National Aeronautics and Space Administration Goddard Space Flight Center solicits proposals for the implementation of the Geostationary Extended Observations spacecraft program. The RFP seeks the design, development, fabrication, integration, testing, evaluation, launch support, and mission operations of seven spacecraft over a potential 15-year period of performance. The first six spacecraft are for launches, while the seventh has no current launch date. Offerors must submit proposals by November 30, 2023 through NASA's Enterprise File Sharing and Sync Box platform. The anticipated contract award date is late May 2024. The procurement will result in a cost-plus-award-fee contract for the base spacecraft plus four options for additional spacecraft.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.: 8/2020
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, MD 20771
Reply to Attn of: 172
TO: All Potential Offerors
SUBJECT: Request for Proposal (RFP), Solicitation No. 80GSFC23R0010, for
Geostationary Extended Observations (GeoXO) Spacecraft Implementation
You are invited to submit a proposal on the National Aeronautics and Space Administration (NASA)
Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft
Implementation solicitation. The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecrafts are three axis stabilized geostationary spacecrafts that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the
Ground Support Equipment (GSE) and simulators; and support the mission operations at the NOAA
Satellite Operations Facility (NSOF).
The spacecraft has a risk classification of Class B.
NASA will conduct this acquisition as a full and open competition. The North American Industry
Classification System (NAICS) code for this acquisition is 336414 and the small business size standard is 1,300 employees.
This competitive acquisition will result in a Cost-Plus-Award-Fee (CPAF) hardware contract, for the development of three spacecraft, and four options for additional spacecraft. The anticipated period of performance for this contract includes support for 10 years of on-orbit operations and 5 years of on-orbit storage, for a total of 15 years for each Flight Model (FM).
Section H.13, Special Task Support Requirements of the RFP specifies that the Government may order special study tasks under the resultant hardware contract for risk reduction and mitigation activities. The clause includes a total dollar amount of $35,000,000 which is the maximum amount the Government may order for special task orders. This dollar value is also reflected in the cost exhibits for proposal purposes.
Potential offerors should ensure its company is listed in the online database(s) for the following:
(1) System for award management: https://www.sam.gov/SAM/
(2) U.S. Department of Labor Veterans’ Employment and Training Service, VETS-4212 Reports:
https://vets4212.dol.gov/vets4212/
(3) Date Universal Numbering System (and the transition to the US Government’s unique entity identifier (UEI)): https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-information-kit/unique-entity-identifier-update
The successful offeror must pass an Equal Employment Opportunity (EEO) clearance before contract award (See FAR 22.805).
The anticipated contract award date and effective date is on or about late May 2024. The contract will be performed offsite at the Contractor’s facilities, and Kennedy Space Center (KSC).
Potential offerors should pay close attention to all solicitation instructions; however, the following requirements list is summarized to assist in proposal development. Please note that this list is not exhaustive, and the solicitation terms and conditions and provisions in sections L and M take precedence:
1. Be advised, in accordance with provision L.14, Offerors need to encourage their references to submit their Past Performance Questionnaires directly to the Contracting Officer prior to proposal due date.
2. Below is a list of the Source Selection Authority (SSA) and voting members along with their associated NASA GSFC organizational codes, for the Source Evaluation Board (SEB). The names provided are for informational purposes only and other than the Contracting Officer, Lisa Mullen, these individuals shall not be contacted regarding this acquisition. The
Government may change personnel associated with this acquisition at its discretion.
SSA
Dave Pierce, Code 100
Voting Members
Michelle Rizzo, Code 418
Chris Wheeler, Code 418
Steve Bidwell, Code 599
Alexander Krimchansky, Code 590
Gerd Fischer, Code 383
Tupper Hyde, Code 100
3. Offerors are required to have a Commercial and Government Entity (CAGE) code that matches the corporate address submitted with its proposal.
Offerors are encouraged to refer to Federal Acquisition Regulation (FAR) provision 52.215-1, INSTRUCTIONS TO OFFERORS–COMPETITIVE ACQUISITION, in particular paragraph (f)(4) which discusses the Government’s right to award a contract without discussions.
In order to control and protect sensitive data owned by the Government and its Contractors, NASA policy required all acquisition-related documents be released in Adobe Portable Document Format
(PDF). Potential Offeror’s may request an EXCEL version of Attachment Q, MEL, Attachment P, TAM and Attachment R, Link Budget, directly from the Contracting Officer through written request to Lisa.A.Mullen@nasa.gov. While the RFP’s Cost Volume exhibits are in PDF format, the Offeror’s
Cost Volume proposal shall include completed Cost Volume exhibits in Microsoft Office Excel format with working cell formulas. Instructions for converting from PDF format to Excel format can be found in the Cost Volume Instructions.
NASA FAR Supplement (NFS) clause 1852.215-84, OMBUDSMAN, is applicable. The
Ombudsman for this acquisition is Raymond “Ray” Rubilotta, Associate Director, raymond.j.rubilotta@nasa.gov, 301-286-5867.
This RFP does not commit NASA GSFC to pay any proposal preparation costs, nor does it obligate
NASA GSFC to procure or contract for these services. This request is not an authorization to proceed and does not authorize payment for any charges incurred by the offeror for performing any of the work called for in this solicitation.
Proposals submitted in response to this solicitation shall be due no later than 2:00 PM ET, November
30, 2023. Proposals for this solicitation are required to be submitted through NASA’s Enterprise File
Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform. Potential offerors, especially those that have not previously submitted a proposal utilizing NASA’s EFSS Box, are encouraged to review the solicitation instruction entitled “Electronic Proposal Delivery - Proposal
Marking and Delivery Through NASA’s EFSS Box” which provides instructions related to the submission of proposal via EFSS Box. Offerors are encouraged to check with their corporate IT staff to determine if there are firewall restrictions that would need to be addressed prior to the submission of proposal files through NASA’s EFSS Box.
In accordance with NFS 1815.201(f), a “Blackout Notice” has been issued to NASA personnel. All inquiries/communications pertaining to this acquisition shall be directed only to the Contracting
Officer listed below.
All questions regarding this RFP should be submitted in writing, electronically to, Contracting
Officer, at Lisa.A.Mullen@nasa.gov on or before October 13, 2023. Offerors are encouraged to submit questions as soon as possible for consideration.
Documents related to this acquisition, including this letter, the solicitation, attachments, exhibits, any amendments, and links to online reference/technical/bidders’ library (if applicable) will be attainable electronically from the World Wide Web through the Government-wide point of entry website at www.SAM.gov. Potential Offerors are requested to periodically monitor the websites for updates.
Thank you for your support. We look forward to receiving your proposals.
Lisa Mullen
Contracting Officer
Enclosure to this Cover Letter:
Reference Chart
Acronym List
Final RFP 80GSFC23R0010
ACRONYM LIST GEOXO SPACECRAFT DRFP
ACX GeoXO Atmospheric Composition Instrument BOL Beginning of Life
C3S Command, Control, and Communications Segment CBU Consolidated Back-Up
CDA Command and Data Acquisition
CDAS Command and Data Acquisition Stations (CDAS) CDR Critical Design Review
CDRL Contract Data Requirements List CIL Critical Items List COR Contracting Officer’s Representative
CPT Comprehensive Performance Test CSCI Computer Software Configuration Item
CUI Controlled unclassified information
CWBS Contract Work Breakdown Structure
DCPC DCS Platform Commanding
DCPR DCS Platform Relay
DCS Data Collection System
DID Data Item Description
DMR Design Modification Review
DOORS Dynamic Object Oriented Requirements System
EEE Electrical, Electronic, Electro-mechanical EEZ Exclusive Economic Zone
EGSE Electrical Ground Support Equipment EMC Electromagnetic Compatibility
EMI Electromagnetic Interference
EOMP End of Mission Plan
ESD Electrostatic Discharge
ETE End-to-End
EVM Earned Value Management F&PS Functional and Performance Specification
FM Flight Model FMEA/FMECA Failure Modes Effects and Criticality Analysis
FOD Foreign Object Debris
FOR Flight Operations Review
FPGA Field Programmable Gate Array
FRR Flight Readiness Review
FSDE Flight Software Development Environment FTA Fault Tree Analysis
GeoXO Geostationary eXtended Observations
GIRD General Interface Requirements Document GPA Ground Processing Algorithm
GPDS Ground Processing Demonstration System
GSE Ground Support Equipment GSFC Goddard Space Flight Center GSRT Goddard Systems Review Team
GXI GeoXO Imager GXS GeoXO Sounder HAR Hardware Acceptance Review
I&T Integration and Test IBR Integrated Baseline Review
ICD Interface Control Document IHS Instrument Hardware Simulator IMS Integrated Master Schedule
INR Image Navigation and Registration
IRR Instrument Receiving Review
ISAR Instrument Safety Assessment Report ISS Instrument Software Simulator IV&V Independent Verification and Validation
KSC Kennedy Space Center LMX GeoXO Lightning Mapper LOR Launch and Orbit Raising
LPD Launch Planning Date LPT Limited Performance Test LRR Launch Readiness Review
LSP Launch Services Program
MA Mission Assurance
MAID Master Action Item Database
MAT Mission Allowable Temperature
MCDR Mission Critical Design Review
MGSE Mechanical Ground Support Equipment MIUL Materials Identification and Usage List MOM Mission Operations Manager MOR Mission Operations Review
MOST Mission Operations Support Team
MPDR Mission Preliminary Design Review
MRB Material Review Board
MRR Manufacturing Readiness Review
MUA Materials Usage Agreement NASA National Aeronautics and Space Administration
NIST National Institute of Standards and Technology
NSOF NOAA Satellite Operational Facility
OCX GeoXO Ocean Color Instrument ODAR Orbital Debris Assessment Report ORR Operational Readiness Review
PCB Printed Circuit Board
PDR Preliminary Design Review
PER Pre-Environmental Review
PFM Proto-Flight Model
PLAR Post Launch Assessment Review
PLT Post-launch Test PMO Project Management Office
PMSR Project Management Status Review
PRAD Payload Resource Allocation Document PSR Pre-Storage/Ship Review
RFA Request for Action
S3 Satellite Software Simulator SCMAR Spacecraft Mission Assurance Requirements
SCTS Spacecraft Command and Telemetry Simulator SDR System Definition Review
SHS Spacecraft Hardware Simulator SIIS Spacecraft to Instrument Interface Simulator SIR System Integration Review
SMA Safety and Mission Assurance
SMS Simulator Matrix Switch
SOW Statement of Work
SPVP System Performance Verification Plan
SRR System Requirements Review SS Space Segment SWAR Software Acceptance Review
SWCDR Software Critical Design Review
SWPDR Software Preliminary Design Review SWTRR Software Test Readiness Review TB Thermal Balance
TDAS Test Data Analysis System
TDR Test Data Review
TIM Technical Interchange Meeting
TRL Technology Readiness Level TRR Test Readiness Review
UIID Unique Instrument Interface Document V&V Verification and Validation
| 2023-09-29T13:56:01-0400 | |
| Lisa Mullen |
File details come from the government source that posted it. Updated .