GeoXO Spacecraft Final RFP Cover Letter.pdf

PDF 593 KB Posted

Attached to
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP Federal contract opportunity
Solicitation number
80GSFC23R0010F
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This request for proposal issued by the National Aeronautics and Space Administration Goddard Space Flight Center solicits proposals for the implementation of the Geostationary Extended Observations spacecraft program. The RFP seeks the design, development, fabrication, integration, testing, evaluation, launch support, and mission operations of seven spacecraft over a potential 15-year period of performance. The first six spacecraft are for launches, while the seventh has no current launch date. Offerors must submit proposals by November 30, 2023 through NASA's Enterprise File Sharing and Sync Box platform. The anticipated contract award date is late May 2024. The procurement will result in a cost-plus-award-fee contract for the base spacecraft plus four options for additional spacecraft.

View the file

Other files for this federal contract opportunity

Other files attached to Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP, newest first.
File Type Posted
Amendment 1 Amend Section L.12.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers 3.pdf PDF
GeoXO Spacecraft SF33.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers Two (002).pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers.pdf PDF
9.29.23 Final GeoXO Spacecraft Implementation Phase B RFP.pdf PDF
Attachment B-418-XO-SCCDRL-0053_V_1_0_final.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_5_final.pdf PDF
Attachment F-2-418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment G-1-418-XO-IRD-0044_V_1_4.pdf PDF
Attachment O-GeoXO SC Engineering Units and Risk.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
Exhibit 8 - PPQ_9.20.23_FINAL.pdf PDF
Attachment F-1-418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-5-418-XO-ACXUIID-0072_V_1_6.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2 RO (1).pdf PDF
Attachment M RESERVED.pdf PDF
Attachment P_GeoXO_TAM_Table Phase B - Final Rev1.pdf PDF
Attachment Q GeoXO MEL_09_28_2023_rev1.pdf PDF
Attachment R_GeoXO Link Budget Templates 09_28_2023.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Attachment D-418-XO-GIRD-0041_V_2_4.pdf PDF
Attachment E-418-XO-PRAD-0037_V_1_6.pdf PDF
Attachment F-3-418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-6-418-XO-PTRUIID-0141_V_1_0.pdf PDF
Attachment G-2-418-XO-IRD-0043_V_1_4.pdf PDF
Attachment H-418-XO-SCMAR-0083_V_2_0-final (003).pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Attachment F-4-418-XO-OCXUIID-0062_V_1_7.pdf PDF
Attachment K-418-XO-RPT-0045-FPGA 1.0.pdf PDF
Attachment A-418-XO-SCSOW-0122_V_1_0_final.pdf PDF
Attachment J-418-XO-RPT-0039_V_1_0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 9-1-23cc.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment Z- Information Technology (IT) Security Applicable Doc List docx.pdf PDF
Attachment AC -Government Furnished Property.pdf PDF
Enclosure 1 GeoXO SC Draft PEP Sept 2023.pdf PDF
GeoXO Spacecraft Cost Exhibits 1-7 September 2023.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev.: 8/2020

National Aeronautics and Space Administration

Goddard Space Flight Center Greenbelt, MD 20771

Reply to Attn of: 172

TO: All Potential Offerors

SUBJECT: Request for Proposal (RFP), Solicitation No. 80GSFC23R0010, for

Geostationary Extended Observations (GeoXO) Spacecraft Implementation

You are invited to submit a proposal on the National Aeronautics and Space Administration (NASA)

Goddard Space Flight Center’s Geostationary Extended Observations (GeoXO) Spacecraft

Implementation solicitation. The GeoXO Program is procuring spacecraft for the GeoXO series that includes an east, west, and center spacecraft. The GeoXO spacecrafts are three axis stabilized geostationary spacecrafts that will support three instruments each. The east and west spacecraft will also support an auxiliary communication payload for the NOAA Data Collection System (DCS) supporting relay, dissemination and commanding. The procurement with the base contract and all options will consist of a total of seven (7) spacecraft – with launches planned for the first six spacecraft and the seventh spacecraft having no current launch date. The contract scope includes the tasks necessary to design, analyze, develop, fabricate, integrate, test, evaluate, and support launch of the GeoXO spacecraft; provide Engineering Development Units (EDUs); supply and maintain the

Ground Support Equipment (GSE) and simulators; and support the mission operations at the NOAA

Satellite Operations Facility (NSOF).

The spacecraft has a risk classification of Class B.

NASA will conduct this acquisition as a full and open competition. The North American Industry

Classification System (NAICS) code for this acquisition is 336414 and the small business size standard is 1,300 employees.

This competitive acquisition will result in a Cost-Plus-Award-Fee (CPAF) hardware contract, for the development of three spacecraft, and four options for additional spacecraft. The anticipated period of performance for this contract includes support for 10 years of on-orbit operations and 5 years of on-orbit storage, for a total of 15 years for each Flight Model (FM).

Section H.13, Special Task Support Requirements of the RFP specifies that the Government may order special study tasks under the resultant hardware contract for risk reduction and mitigation activities. The clause includes a total dollar amount of $35,000,000 which is the maximum amount the Government may order for special task orders. This dollar value is also reflected in the cost exhibits for proposal purposes.

Potential offerors should ensure its company is listed in the online database(s) for the following:

(1) System for award management: https://www.sam.gov/SAM/

(2) U.S. Department of Labor Veterans’ Employment and Training Service, VETS-4212 Reports:

https://vets4212.dol.gov/vets4212/

(3) Date Universal Numbering System (and the transition to the US Government’s unique entity identifier (UEI)): https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-information-kit/unique-entity-identifier-update

The successful offeror must pass an Equal Employment Opportunity (EEO) clearance before contract award (See FAR 22.805).

The anticipated contract award date and effective date is on or about late May 2024. The contract will be performed offsite at the Contractor’s facilities, and Kennedy Space Center (KSC).

Potential offerors should pay close attention to all solicitation instructions; however, the following requirements list is summarized to assist in proposal development. Please note that this list is not exhaustive, and the solicitation terms and conditions and provisions in sections L and M take precedence:

1. Be advised, in accordance with provision L.14, Offerors need to encourage their references to submit their Past Performance Questionnaires directly to the Contracting Officer prior to proposal due date.

2. Below is a list of the Source Selection Authority (SSA) and voting members along with their associated NASA GSFC organizational codes, for the Source Evaluation Board (SEB). The names provided are for informational purposes only and other than the Contracting Officer, Lisa Mullen, these individuals shall not be contacted regarding this acquisition. The

Government may change personnel associated with this acquisition at its discretion.

SSA

Dave Pierce, Code 100

Voting Members

Michelle Rizzo, Code 418

Chris Wheeler, Code 418

Steve Bidwell, Code 599

Alexander Krimchansky, Code 590

Gerd Fischer, Code 383

Tupper Hyde, Code 100

3. Offerors are required to have a Commercial and Government Entity (CAGE) code that matches the corporate address submitted with its proposal.

Offerors are encouraged to refer to Federal Acquisition Regulation (FAR) provision 52.215-1, INSTRUCTIONS TO OFFERORS–COMPETITIVE ACQUISITION, in particular paragraph (f)(4) which discusses the Government’s right to award a contract without discussions.

In order to control and protect sensitive data owned by the Government and its Contractors, NASA policy required all acquisition-related documents be released in Adobe Portable Document Format

(PDF). Potential Offeror’s may request an EXCEL version of Attachment Q, MEL, Attachment P, TAM and Attachment R, Link Budget, directly from the Contracting Officer through written request to Lisa.A.Mullen@nasa.gov. While the RFP’s Cost Volume exhibits are in PDF format, the Offeror’s

Cost Volume proposal shall include completed Cost Volume exhibits in Microsoft Office Excel format with working cell formulas. Instructions for converting from PDF format to Excel format can be found in the Cost Volume Instructions.

NASA FAR Supplement (NFS) clause 1852.215-84, OMBUDSMAN, is applicable. The

Ombudsman for this acquisition is Raymond “Ray” Rubilotta, Associate Director, raymond.j.rubilotta@nasa.gov, 301-286-5867.

This RFP does not commit NASA GSFC to pay any proposal preparation costs, nor does it obligate

NASA GSFC to procure or contract for these services. This request is not an authorization to proceed and does not authorize payment for any charges incurred by the offeror for performing any of the work called for in this solicitation.

Proposals submitted in response to this solicitation shall be due no later than 2:00 PM ET, November

30, 2023. Proposals for this solicitation are required to be submitted through NASA’s Enterprise File

Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform. Potential offerors, especially those that have not previously submitted a proposal utilizing NASA’s EFSS Box, are encouraged to review the solicitation instruction entitled “Electronic Proposal Delivery - Proposal

Marking and Delivery Through NASA’s EFSS Box” which provides instructions related to the submission of proposal via EFSS Box. Offerors are encouraged to check with their corporate IT staff to determine if there are firewall restrictions that would need to be addressed prior to the submission of proposal files through NASA’s EFSS Box.

In accordance with NFS 1815.201(f), a “Blackout Notice” has been issued to NASA personnel. All inquiries/communications pertaining to this acquisition shall be directed only to the Contracting

Officer listed below.

All questions regarding this RFP should be submitted in writing, electronically to, Contracting

Officer, at Lisa.A.Mullen@nasa.gov on or before October 13, 2023. Offerors are encouraged to submit questions as soon as possible for consideration.

Documents related to this acquisition, including this letter, the solicitation, attachments, exhibits, any amendments, and links to online reference/technical/bidders’ library (if applicable) will be attainable electronically from the World Wide Web through the Government-wide point of entry website at www.SAM.gov. Potential Offerors are requested to periodically monitor the websites for updates.

Thank you for your support. We look forward to receiving your proposals.

Lisa Mullen

Contracting Officer

Enclosure to this Cover Letter:

Reference Chart

Acronym List

Final RFP 80GSFC23R0010

ACRONYM LIST GEOXO SPACECRAFT DRFP

ACX GeoXO Atmospheric Composition Instrument BOL Beginning of Life

C3S Command, Control, and Communications Segment CBU Consolidated Back-Up

CDA Command and Data Acquisition

CDAS Command and Data Acquisition Stations (CDAS) CDR Critical Design Review

CDRL Contract Data Requirements List CIL Critical Items List COR Contracting Officer’s Representative

CPT Comprehensive Performance Test CSCI Computer Software Configuration Item

CUI Controlled unclassified information

CWBS Contract Work Breakdown Structure

DCPC DCS Platform Commanding

DCPR DCS Platform Relay

DCS Data Collection System

DID Data Item Description

DMR Design Modification Review

DOORS Dynamic Object Oriented Requirements System

EEE Electrical, Electronic, Electro-mechanical EEZ Exclusive Economic Zone

EGSE Electrical Ground Support Equipment EMC Electromagnetic Compatibility

EMI Electromagnetic Interference

EOMP End of Mission Plan

ESD Electrostatic Discharge

ETE End-to-End

EVM Earned Value Management F&PS Functional and Performance Specification

FM Flight Model FMEA/FMECA Failure Modes Effects and Criticality Analysis

FOD Foreign Object Debris

FOR Flight Operations Review

FPGA Field Programmable Gate Array

FRR Flight Readiness Review

FSDE Flight Software Development Environment FTA Fault Tree Analysis

GeoXO Geostationary eXtended Observations

GIRD General Interface Requirements Document GPA Ground Processing Algorithm

GPDS Ground Processing Demonstration System

GSE Ground Support Equipment GSFC Goddard Space Flight Center GSRT Goddard Systems Review Team

GXI GeoXO Imager GXS GeoXO Sounder HAR Hardware Acceptance Review

I&T Integration and Test IBR Integrated Baseline Review

ICD Interface Control Document IHS Instrument Hardware Simulator IMS Integrated Master Schedule

INR Image Navigation and Registration

IRR Instrument Receiving Review

ISAR Instrument Safety Assessment Report ISS Instrument Software Simulator IV&V Independent Verification and Validation

KSC Kennedy Space Center LMX GeoXO Lightning Mapper LOR Launch and Orbit Raising

LPD Launch Planning Date LPT Limited Performance Test LRR Launch Readiness Review

LSP Launch Services Program

MA Mission Assurance

MAID Master Action Item Database

MAT Mission Allowable Temperature

MCDR Mission Critical Design Review

MGSE Mechanical Ground Support Equipment MIUL Materials Identification and Usage List MOM Mission Operations Manager MOR Mission Operations Review

MOST Mission Operations Support Team

MPDR Mission Preliminary Design Review

MRB Material Review Board

MRR Manufacturing Readiness Review

MUA Materials Usage Agreement NASA National Aeronautics and Space Administration

NIST National Institute of Standards and Technology

NSOF NOAA Satellite Operational Facility

OCX GeoXO Ocean Color Instrument ODAR Orbital Debris Assessment Report ORR Operational Readiness Review

PCB Printed Circuit Board

PDR Preliminary Design Review

PER Pre-Environmental Review

PFM Proto-Flight Model

PLAR Post Launch Assessment Review

PLT Post-launch Test PMO Project Management Office

PMSR Project Management Status Review

PRAD Payload Resource Allocation Document PSR Pre-Storage/Ship Review

RFA Request for Action

S3 Satellite Software Simulator SCMAR Spacecraft Mission Assurance Requirements

SCTS Spacecraft Command and Telemetry Simulator SDR System Definition Review

SHS Spacecraft Hardware Simulator SIIS Spacecraft to Instrument Interface Simulator SIR System Integration Review

SMA Safety and Mission Assurance

SMS Simulator Matrix Switch

SOW Statement of Work

SPVP System Performance Verification Plan

SRR System Requirements Review SS Space Segment SWAR Software Acceptance Review

SWCDR Software Critical Design Review

SWPDR Software Preliminary Design Review SWTRR Software Test Readiness Review TB Thermal Balance

TDAS Test Data Analysis System

TDR Test Data Review

TIM Technical Interchange Meeting

TRL Technology Readiness Level TRR Test Readiness Review

UIID Unique Instrument Interface Document V&V Verification and Validation

2023-09-29T13:56:01-0400