Attachment E-418-XO-PRAD-0037_V_1_6.pdf

PDF 10 MB Posted

Attached to
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP Federal contract opportunity
Solicitation number
80GSFC23R0010F
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This solicitation requests proposals for the Geostationary Extended Observations (GeoXO) Spacecraft Phase B Implementation. The National Aeronautics and Space Administration Goddard Space Center is seeking proposals to design, develop, integrate, test, launch and operate the GeoXO spacecraft. The solicitation number is 80GSFC23R0010F. Offerors must submit proposals by January 15, 2023. The agency intends to award a single fixed-price contract with a period of performance from 2023 to 2028. The spacecraft will provide advanced observations of Earth's atmosphere, oceans, land and climate from geostationary orbit to further scientific understanding and improve weather forecasting capabilities.

View the file

Other files for this federal contract opportunity

Other files attached to Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP, newest first.
File Type Posted
Amendment 1 Amend Section L.12.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers 3.pdf PDF
GeoXO Spacecraft SF33.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers Two (002).pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers.pdf PDF
GeoXO Spacecraft Final RFP Cover Letter.pdf PDF
Attachment F-1-418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-5-418-XO-ACXUIID-0072_V_1_6.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2 RO (1).pdf PDF
Attachment M RESERVED.pdf PDF
Attachment P_GeoXO_TAM_Table Phase B - Final Rev1.pdf PDF
Attachment Q GeoXO MEL_09_28_2023_rev1.pdf PDF
Attachment R_GeoXO Link Budget Templates 09_28_2023.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
Attachment D-418-XO-GIRD-0041_V_2_4.pdf PDF
Attachment F-3-418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-6-418-XO-PTRUIID-0141_V_1_0.pdf PDF
Attachment G-2-418-XO-IRD-0043_V_1_4.pdf PDF
Attachment H-418-XO-SCMAR-0083_V_2_0-final (003).pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Attachment F-4-418-XO-OCXUIID-0062_V_1_7.pdf PDF
Attachment K-418-XO-RPT-0045-FPGA 1.0.pdf PDF
Attachment A-418-XO-SCSOW-0122_V_1_0_final.pdf PDF
Attachment J-418-XO-RPT-0039_V_1_0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 9-1-23cc.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment Z- Information Technology (IT) Security Applicable Doc List docx.pdf PDF
Attachment AC -Government Furnished Property.pdf PDF
Enclosure 1 GeoXO SC Draft PEP Sept 2023.pdf PDF
GeoXO Spacecraft Cost Exhibits 1-7 September 2023.pdf PDF
9.29.23 Final GeoXO Spacecraft Implementation Phase B RFP.pdf PDF
Attachment B-418-XO-SCCDRL-0053_V_1_0_final.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_5_final.pdf PDF
Attachment F-2-418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment G-1-418-XO-IRD-0044_V_1_4.pdf PDF
Attachment O-GeoXO SC Engineering Units and Risk.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
Exhibit 8 - PPQ_9.20.23_FINAL.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: September 19, 2023 418-XO-PRAD-0037 Responsible Organization: GeoXO Flight Project/Code 418 Baseline Version 1.6

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Geostationary Extended Observations (GeoXO) Flight Project

Payload Resources Allocation Document (PRAD) Signature page

Prepared by:

Electronically approved by:

01/24/2022

Alan D. Reth Date GeoXO Flight Project, Systems Engineer NASA GSFC, Code 418

Reviewed by:

02/03/2022

Steven W. Bidwell Date GeoXO Flight Project, Mission Systems Engineer NASA GSFC, Code 599

02/03/2022

Michelle P Rizzo Date GeoXO Flight Project, Observatory Manager

Approved by:

02/10/2022

Jason Hair Date GeoXO Flight Project, Project Manager

/GeoXO Flight Project Systems Engineering

PRAD

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

Version: 1.6 Printed by: hlhedger Printed on: Tuesday, September 26, 2023

No filter applied.

No sort applied.

Generated from DOORS 9.7.2.4

Contents

1 1Scope

1.1 1Overview

1.2 2Requirements Terminology

2 3Documents

2.1 3Applicable Documents

2.2 3Reference Documents

3 4Instrument Mass Allocation

3.1 4GeoI Instrument Mass Allocation

3.2 4GeoS Instrument Mass Allocation

4 5Instrument Power Allocation

4.1 5GeoI Instrument Power Allocation

4.1.1 5GeoI Instrument Average Operational Power

4.1.2 5GeoI Instrument Maximum Operational Power

4.1.3 5GeoI Instrument Average Survival Power

4.1.4 6GeoI Instrument Maximum Survival Power

4.2 6GeoS Instrument Power Allocation

4.2.1 6GeoS Instrument Average Operational Power

4.2.2 6GeoS Instrument Maximum Operational Power

4.2.3 7GeoS Instrument Average Survival Power

4.2.4 7GeoS Instrument Maximum Survival Power

5 8Instrument Data Rate Allocation

5.1 8GeoI Instrument Data Rate Allocation

5.2 8GeoS Instrument Data Rate Allocation

6 9Instrument INR Allocation

6.1 9GeoI Instrument INR

6.1.1 9GXI INR Allocation

6.1.2 9LMX INR Allocation

6.1.3 10OCX INR Allocation

6.2 10GeoS Instrument INR Requirements

6.2.1 10GXS INR Allocation

6.2.2 11ACX INR Allocation

Project: GeoXO Flight Project Systems Engineering Module: PRAD Baseline Version: 1.6

Contents ii

7 12Instrument-Driven GNC Allocations

7.1 12Attitude Control System Requirements Allocation

7.1.1 12Attitude Control Requirements

7.1.2 12Attitude Knowledge Requirements

7.1.3 12Attitude Rate Error and Latency Requirements

7.2 13Orbit Requirement Allocation

7.2.1 14Orbit Control Requirement Allocation

7.2.2 14Orbit Knowledge Requirement Allocation

8 15Instrument Disturbances

8.1 15GeoI Instrument Exported Disturbances

8.1.1 15GeoI Instrument Torque Allocation

8.1.2 15GeoI Instrument Integrated Angular Momentum Allocation

8.1.3 15GeoI Instrument Angular Momentum Allocation

8.1.4 16GeoI Instrument Bandpass-Filtered Angular Momentum Allocation

8.1.5 17GeoI Instrument Exported Linear Acceleration Bandpass Limits

8.1.6 19GeoI Instrument Exported Linear Acceleration Shock Response Spectra

8.2 20GeoI Instrument Imported Accelerations

8.2.1 21GeoI Instrument Imported Linear Acceleration Bandpass Limits

8.2.2 23GeoI Instrument Imported Linear Acceleration Shock Response Spectra

8.3 24GeoS Instrument Exported Disturbances

8.3.1 24GeoS Instrument Torque Allocation

8.3.2 25GeoS Instrument Integrated Angular Momentum Allocation

8.3.3 25GeoS Instrument Angular Momentum Allocation

8.3.4 26GeoS Instrument Bandpass-Filtered Angular Momentum Allocation

8.3.5 26GeoS Instrument Exported Linear Acceleration Bandpass Limits

8.3.6 28GeoS Instrument Exported Linear Acceleration Shock Response Spectra

8.4 29GeoS Instrument Imported Disturbances

8.4.1 29GeoS Instrument Imported Linear Acceleration Bandpass Limits

8.4.2 32GeoS Instrument Imported Linear Acceleration Shock Response Spectra

9 34Acronyms

Contents iii

Page 1 of 34 Printed Tuesday, September 26, 2023

ID

PRAD1

PRAD2

PRAD3

PRAD4

PRAD5

PRAD6

PRAD7

Object Number

1.0-1

1.1

1.1.0-1

1.1.0-2

1.1.0-3

1.1.0-4

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

1 Scope

This document defines instrument resource allocations for the Geostationary Extended Observations (GeoXO) satellite. The resources covered by this document are: mass, power, data rate, image navigation and registration (INR), attitude, orbit, and disturbances.

1.1 Overview

This document, the Payload Resource Allocation Document (PRAD), provides bookkeeping for margin management of spacecraft resources required for GeoXO. The assumed GeoXO constellation as of the writing of this document, known as “Configuration 60,” comprises three National Oceanic and Atmospheric Administration (NOAA) satellites. The GeoXO satellites will be stationed at East, West, and Central locations, where the position designations are relative to the conterminous United States (CONUS). Both the East/West satellites include instruments for visible/infrared imaging, lightning mapping, and ocean color; these satellites are designated “GeoI.” The GeoXO Central Satellite includes instruments for infrared sounding, atmospheric composition, and potentially an instrument from a partner organization; these satellites are designated “GeoS.”

For most requirements covered by this document, the government levies different specification levels on the spacecraft and instruments, with the difference between the two values being held in reserve by the government. The PRAD shows spacecraft, instrument, and government reserve allocations for all such requirements. The reserve amounts documented herein are expressed in engineering units and as a percentage increase from the lower value, except for image navigation and registration (INR), where reserve is a percentage deducted from top-level Government Program Requirements.

The government may release a portion of reserve to either or both parties affected by a particular requirement if it appears that existing allocations are not practically feasible.

The government captures instrument allocations from the PRAD in the Performance and Operational Requirements Documents (PORD), General Interface Requirements Document (GIRD) and/or Unique Instrument Interface Documents (UIIDs). Instrument allocations are expressed herein as “will” statements, with the corresponding “shall” statements appearing in other documents. Spacecraft allocation requirements appear in the PRAD, the Spacecraft Functional and Performance Specification (SCFPS), and the

GIRD.

The instruments must meet their performance requirements, given the spacecraft interface characteristics specified in the GIRD and UIIDs. Instruments must meet the instrument exported disturbance requirements specified in the GIRD and UIIDs. The satellite must meet its instrument interface requirements with all instruments operating at UIID instrument exported disturbance levels.

Page 3 of 34 Printed Tuesday, September 26, 2023

ID

PRAD9

PRAD10

PRAD11

PRAD12

PRAD13

Object Number

2.1

2.1.0-1

2.2

2.2.0-1

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

2 Documents

2.1 Applicable Documents

The following documents form a part of this specification to the extent specified herein.

RESERVED

2.2 Reference Documents

The following documents provide reference material for part of this document.

1. GeoXO Spacecraft Functional and Performance Specification (SCFPS), 418-XO-

PSPEC-0051

2. GeoXO General Interface Requirements Document (GIRD), 418-XO-GIRD-0041

3. GeoXO Imager (GXI) Unique Instrument Interface Document (UIID), 418-XO-

GXIUIID-0023

4. GeoXO hyperspectral radiometric Sounder (GXS) Unique Instrument Interface

Document (UIID), 418-XO-GXSUIID-0030

5. GeoXO Ocean Color (OCX) Unique Instrument Interface Document (UIID), 418-XO-

OCXUIID-0062

6. GeoXO Lightning Mapper (LMX) Unique Instrument Interface Document (UIID), 418-

XO-LMXUIID-0067

7. GeoXO Atmospheric Composition (ACX) Unique Instrument Interface Document

(UIID), 418-XO-ACXUIID-0072

8. GeoXO Imager (GXI) Performance and Operational Requirements Documents

(PORD), 418-XO-GXIPORD-0024

9. GeoXO hyperspectral radiometric Sounder (GXS) Performance and Operational

Requirements Documents (PORD), 418-XO-GXSPORD-0031

10. GeoXO Ocean Color (OCX) Performance and Operational Requirements Documents

(PORD), 418-XO-OCXPORD-0061

11. GeoXO Lightning Mapper (LMX) Performance Operational Requirements Documents

(PORD), 418-XO-LMXPORD-0066

12. GeoXO Atmospheric Composition (ACX) Performance and Operational Requirements

Documents (PORD), 418-XO-ACXPORD-0071

Page 17 of 34 Printed Tuesday, September 26, 2023

ID

PRAD107

PRAD108

PRAD109

Object Number

8.1.5

8.1.5.0-1

8.1.5.0-2

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

8.1.5 GeoI Instrument Exported Linear Acceleration Bandpass

Limits

For each instrument, the translational accelerations induced by the instrument at each mount will not exceed the limits specified in the corresponding “UIID Instrument Exported” allocation in Table PRAD109. (Corresponding instrument “shall” statements are in their UIIDs.) The accelerations are those induced by operation of the sensor unit while mounted to a flexible interface. The limits apply to each orthogonal axis after the acceleration is filtered using an eighth-order band pass Butterworth filter with -3dB frequencies at f1 and f2. Note that the filter has a fourth-order roll-off on both sides of the response.

The GeoI Satellites shall limit linear accelerations at each instrument mount such that they are in accordance with the SCFPS column in Table PRAD109, when all instruments are in compliance with all exported disturbance requirements.

Page 21 of 34 Printed Tuesday, September 26, 2023

ID

PRAD116

PRAD117

PRAD118

Object Number

8.2.1

8.2.1.0-1

8.2.1.0-2

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

8.2.1 GeoI Instrument Imported Linear Acceleration Bandpass

Limits

Each instrument will meet its performance requirements when the translational acceleration responses from sources external to the instrument sensor unit at the spacecraft side of each instrument sensor unit mount are in accordance with their respective columns in Table PRAD118. (Corresponding instrument “shall” statements are in their UIIDs.)

The limits apply to each orthogonal axis of each instrument mount after the acceleration is filtered using an eighth-order band pass Butterworth filter with -3dB frequencies at f1 and f2. Note that the filter has a fourth-order roll-off on both sides of the response.

Page 30 of 34 Printed Tuesday, September 26, 2023

ID

PRAD150

PRAD151

Object Number

8.4.1.0-1

8.4.1.0-2

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

Each instrument will meet its performance requirements when the translational acceleration responses from sources external to the instrument sensor unit at the spacecraft side of each instrument sensor unit mount are in accordance with their respective columns in Table PRAD151. (Corresponding instrument “shall” statements are in their UIIDs.)

The limits apply to each orthogonal axis of each instrument mount after the acceleration is filtered using an eighth-order band pass Butterworth filter with -3dB frequencies at f1 and f2. Note that the filter has a fourth-order roll-off on both sides of the response.

Page 34 of 34 Printed Tuesday, September 26, 2023

ID

PRAD155

PRAD156

Object Number

9.0-1

418-XO-PRAD-0037, RM Version, Geostationary eXtended Observations (GeoXO) Payload Resources Allocation Document

(PRAD)

9 Acronyms

ACX GeoXO Atmospheric Composition instrument cm centimeter g standard gravitational acceleration, 9.80665 m/s2

GeoI GeoXO-Imager/LM/OC satellite GeoS GeoXO-Sounder/AC satellite GeoXO Geostationary Extended Observations GIRD General Interface Requirements Document GXI GeoXO Imager GXS GeoXO Sounder IMF Instrument Mounting Frame INR Image Navigation and Registration kg kilogram LMX GeoXO Lightning Mapper m meter Mbps megabits per second µrad microradian ms milli-second NOAA National Oceanic and Atmospheric Administration OCX GeoXO Ocean Color instrument PORD Performance and Operational Requirements Document PRAD Payload Resource Allocation Document PTR Partner Instrument SCFPS Spacecraft Functional and Performance Specification SRS Shock Response Spectra SSP Sub Satellite Point UIID Unique Instrument Interface Document W Watts

Effective Date: September 19, 2023 418-XO-PRAD-0037 Responsible Organization: GeoXO Flight Project/Code 418 Baseline Version 1.6

To verify the correct version of this document, please contact the GeoXO Series Configuration Management

Office.

Document Change Record (DCR)

CCR GeoXO#: X00056 Rev: Title: 418-XO-PRAD-0037: baseline the PRAD Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 02/10/2022 Doc Version: 1.0 Contract Mod#: info only DOORs Version: 1.0 Doc Change Date: Feb. 10, 2022 DOORs ID #: 1.0

CCR GeoXO#: X00068 Rev: Title: PRAD: GXI INR corrections Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 05/23/2022 Doc Version: 1.1 Contract Mod#: info only DOORs Version: 1.1 Doc Change Date: May 23, 2022 DOORs ID #: PRAD59 (6.1.1.0-1)

CCR GeoXO#: X00089 Rev: Title: PRAD: mass, power, & INR updates Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 07/08/2022 Doc Version: 1.2 Contract Mod#: info only DOORs Version: 1.2 Doc Change Date: July 8, 2022 DOORs ID #: Modify: PRAD17 (3.1.0-1), PRAD19 (3.2.0-1), PRAD24 (4.1.1.0-2), PRAD27 (4.1.2.0-2), PRAD61 (6.1.2.0-1)

CCR GeoXO#: X00184 Rev: Title: PRAD: OCX mass increase Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft & OCX Instrument CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 05/17/2023 Doc Version: 1.3 Contract Mod#: info only DOORs Version: 1.3 Doc Change Date: May 25, 2023 DOORs ID #: Modify: PRAD17 (3.1.0-1)

CM note: GeoXO Spacecraft, no modification but Lockheed Martin was notified and no modification but Maxar was notified.

Also, the OCX Instrument phase a study is complete, therefore, no mod was needed.

CCR GeoXO#: X00210 Rev: Title: PRAD: changes for ACX, LMX, and OCX Power Allocations Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft & Instruments CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 07/26/2023 Doc Version: 1.4 Contract Mod#: info only DOORs Version: 1.4 Doc Change Date: Aug. 09, 2023 DOORs ID #: Modify: PRAD30 (4.1.3.0-2), 33 (4.1.4.0-2), 37 (4.2.1.0-2)

CCR GeoXO#: X00221 Rev: Title: PRAD: Remove DNB & Instrument Placement Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft & Instruments CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 08/09/2023 Doc Version: 1.4 Contract Mod#: info only DOORs Version: 1.4 Doc Change Date: Aug. 09, 2023 DOORs ID #: Modify: PRAD67 (6.2.1.0-1), 75 (7.1.1.0-1), 80 (7.1.3.0-2)

CCR GeoXO#: X00230 Rev: Title: PRAD: increase LMX SCFPS Power Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft & LMX CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 08/25/2023 Doc Version: 1.5 Contract Mod#: info only DOORs Version: 1.5 Doc Change Date: Aug. 25, 2023 DOORs ID #: Modify: PRAD24 (4.1.1.0-2)

CCR GeoXO#: X00240 Rev: Title: PRAD: GNC requirement clarifications Contract # N/A GeoXO S/C: GeoXO Effectivity: Spacecraft & GXI CCB Status: Approved Doc #: 418-XO-PRAD-0037 CCB Date: 09/19/2023 Doc Version: 1.6 Contract Mod#: info only DOORs Version: 1.6 Doc Change Date: Sept. 19, 2023 DOORs ID #: Modify: PRAD77 (7.1.2.0-1), 80 (7.1.3.0-2), 121 (8.2.2.0-2)

File details come from the government source that posted it. Updated .