GeoXO Spacecraft Final RFP Questions and Answers.pdf

PDF 98 KB Posted

Attached to
Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP Federal contract opportunity
Solicitation number
80GSFC23R0010F
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains questions and answers regarding the final request for proposal for the Geostationary Extended Observations Spacecraft Phase B Implementation. The solicitation seeks proposals for the design, development, and implementation of the GeoXO spacecraft. Key details include that FAR 52.219-9 Alternate II is the correct clause to utilize, all required exhibits must be filled out and submitted with proposals, and the Master Equipment List should not include cost data but rather include material costs in Cost Exhibit 4. The propellant and pressurant quantity should also be directly entered rather than including a calculation. The solicitation number is 80GSFC23R0010F and is being issued by the National Aeronautics and Space Administration Goddard Space Center.

View the file

Other files for this federal contract opportunity

Other files attached to Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP, newest first.
File Type Posted
Amendment 1 Amend Section L.12.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers 3.pdf PDF
GeoXO Spacecraft SF33.pdf PDF
GeoXO Spacecraft Final RFP Questions and Answers Two (002).pdf PDF
Attachment A-418-XO-SCSOW-0122_V_1_0_final.pdf PDF
Attachment J-418-XO-RPT-0039_V_1_0.pdf PDF
Attachment N-Spacecraft Final RFP WBS dictionary 9-1-23cc.pdf PDF
Attachment U RESERVED.pdf PDF
Attachment Y - IT Security Management Plan.pdf PDF
Attachment Z- Information Technology (IT) Security Applicable Doc List docx.pdf PDF
Attachment AC -Government Furnished Property.pdf PDF
Enclosure 1 GeoXO SC Draft PEP Sept 2023.pdf PDF
GeoXO Spacecraft Cost Exhibits 1-7 September 2023.pdf PDF
Attachment D-418-XO-GIRD-0041_V_2_4.pdf PDF
Attachment E-418-XO-PRAD-0037_V_1_6.pdf PDF
Attachment F-3-418-XO-GXSUIID-0030_V_1_6a.pdf PDF
Attachment F-6-418-XO-PTRUIID-0141_V_1_0.pdf PDF
Attachment G-2-418-XO-IRD-0043_V_1_4.pdf PDF
Attachment H-418-XO-SCMAR-0083_V_2_0-final (003).pdf PDF
Attachment L-GeoXO_ConOps_v1-0-final.pdf PDF
Attachment S - OCI Plan DRD.pdf PDF
Attachment T - Organizational Conflict of Interest Plan.pdf PDF
Attachment W -Diversity-Equity- Inclusion and Accessibility Plan.pdf PDF
Attachment AA- Safety and Health Plan.pdf PDF
Enclosure 2 -418-XO-PLN-0109 GeoXO QASP FINAL V2.0 RO.pdf PDF
Attachment F-4-418-XO-OCXUIID-0062_V_1_7.pdf PDF
Attachment K-418-XO-RPT-0045-FPGA 1.0.pdf PDF
GeoXO Spacecraft Final RFP Cover Letter.pdf PDF
Attachment F-1-418-XO-GXIUIID-0023_V_2_4.pdf PDF
Attachment F-5-418-XO-ACXUIID-0072_V_1_6.pdf PDF
Attachment I-418-XO-RPT-0042 Radiation Environment for Electronic Devices final V1_2 RO (1).pdf PDF
Attachment M RESERVED.pdf PDF
Attachment P_GeoXO_TAM_Table Phase B - Final Rev1.pdf PDF
Attachment Q GeoXO MEL_09_28_2023_rev1.pdf PDF
Attachment R_GeoXO Link Budget Templates 09_28_2023.pdf PDF
Attachment AB - Requirements Statements List.pdf PDF
9.29.23 Final GeoXO Spacecraft Implementation Phase B RFP.pdf PDF
Attachment B-418-XO-SCCDRL-0053_V_1_0_final.pdf PDF
Attachment C-418-XO-PSPEC-0051_V_1_5_final.pdf PDF
Attachment F-2-418-XO-LMXUIID-0067 V1_4.pdf PDF
Attachment G-1-418-XO-IRD-0044_V_1_4.pdf PDF
Attachment O-GeoXO SC Engineering Units and Risk.pdf PDF
Attachment V -DEIA Plan DRD.pdf PDF
Attachment X - Small Business Subcontracting Plan.pdf PDF
Enclosure 3 Financial Capability Assessment (SEPT) 2020.pdf PDF
Exhibit 8 - PPQ_9.20.23_FINAL.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GeoXO Spacecraft Final RFP Questions and Answers

Question: FAR 52.219-9 (Sep 2023) is included in the solicitation. However, RFP, Part IV, Section L – Subfactor C – Small Business Utilization (A)(1) states that FAR

52.219-9 Alternate II is included in the solicitation. Please clarify which version to utilize?

Answer: The correct clause is FAR 52.219-9 ALT ll. The final contract will contain the correct version in Section I.

Question: Small Business Utilization (A)(7) states that offerors shall complete

Exhibits 7A, 7B, and 7C. Can the offeror utilize their own format and only include within the small business subcontracting plan itself as FAR 52.219-9 already requires this information to be included within the plan?

Answer: No, all Exhibits must be filled in and submitted with proposal.

Question: The Offeror shall propose a Master Equipment List (MEL) in Excel format in accordance with Attachment Q summarizing all major subsystem components to support validation of proposed mass estimates, power estimates, TRL, design heritage, and cost. The MEL Attachment Q matrix indicates cost is not to be included in the Column. Please clarify.

Answer: The MEL is not required to have the cost data. Please put material costs in Cost Exhibit 4.

Question: MEL has this calculation (C46+C47) for propellant/pressurant. C46 is

Instrument total mass and C47 is SC MEC dry-mass total. This calculation seems to be incorrect as the propellant mass is a calculation based on the mass and the performance of the thrusters used. Please Clarify

Answer: There should be no calculation in that cell. What is currently in the cell is incorrect. The propellant / pressurant quantity should be entered by the Offeror.