General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- N041--626-24-201 - Replace Chiller #2 Tennessee Valley Healthcare System, Nashville Campus
- Solicitation number
- 36C24923B0023
About this file
This document provides a template for breaking out general condition costs on a schedule of values for a federal construction contract. It lists various general condition cost categories such as superintendent, project manager, field office engineer, builder's risk insurance, site maintenance, signage, travel, record document preparation, and information technology. For each category, the template specifies a value field to enter the associated costs. It also provides a total value field to calculate the overall general conditions costs.
The related federal contract opportunity is a solicitation to replace chiller number two at the Tennessee Valley Healthcare System campus in Nashville. The solicitation number is 36C24923B0023 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0023 0003.pdf | ||
| PCRA Memorandum 7-11.doc | DOC document | |
| 626-23-201 Replace Chiller 2 Layout_Rev1.pdf | ||
| Switch Gear Location.pdf | ||
| Painting Standards.pdf | ||
| 36C24923B0023 0002.docx | DOCX document | |
| Pre-Bid Site Walk Sign In_Replace Chiller2_28SEP23.pdf | ||
| 36C24923B0023 0001.docx | DOCX document | |
| Calculation of Self Performance Work.pdf | ||
| VA Provided Chiller Cutsheets.pdf | ||
| UEI _ TAX ID.docx | DOCX document | |
| 626-24-201 Chiller 2 Specs.pdf | ||
| Sample ATS 13 VA Commissioning.pdf | ||
| RFI Form.docx | DOCX document | |
| DBA wage determination TN20230178 modification 4 last revised 06302023.pdf | ||
| One Line Diagram 8-3-23.pdf | ||
| VA Chiller Details.pdf | ||
| 626-23-201 Replace Chiller 2 Layout.pdf | ||
| 36C24923B0023_1.docx | DOCX document | |
| Current 650 Ton Chiller 160-73-o2 Operating and Maintenance Manual.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document | |
| Sample Chiller Installation Checklist.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | |
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage. |
| General Condition Description | Value |
| Superintendent | $ - 0 |
| Project Manager | $ - 0 |
| Field Office Engineer | $ - 0 |
| Builder's Risk Insurance | $ - 0 |
| Other Project Specific Liability Insurance | $ - 0 |
| Site Maintenance and Protection | $ - 0 |
| Progress Photos (per contract specifications) | $ - 0 |
| Dumpsters | $ - 0 |
| Office Trailer | $ - 0 |
| Storage Trailer/POD/CONEX | $ - 0 |
| Telephone (Cell and/or Landline) | $ - 0 |
| Signage (per contract specifications and/or drawings) | $ - 0 |
| Travel (must comply with Federal Travel Regulations) | $ - 0 |
| Lodging (must comply with Federal Travel Regulations) | $ - 0 |
| Record Document Preparation | $ - 0 |
| As-builts (per contract specifications) | $ - 0 |
| Weather Protection (per contract specifications) | $ - 0 |
| Infection Control (per contract specifications) | $ - 0 |
| Information Technology (Internet, etc.) | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| General Conditions Total | $ - 0 |