Calculation of Self Performance Work.pdf
PDF 273 KB Posted
- Attached to
- N041--626-24-201 - Replace Chiller #2 Tennessee Valley Healthcare System, Nashville Campus
- Solicitation number
- 36C24923B0023
About this file
This document provides guidance on calculating the percentage of work to be self-performed under a federal contract to replace Chiller #2 at the Nashville campus of the Tennessee Valley Healthcare System. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9, with the solicitation number 36C24923B0023 and name N041--626-24-201 - Replace Chiller #2 Tennessee Valley Healthcare System, Nashville Campus.
Offerors for the general construction contract (NAICS code 238220) must self-perform at least 15% of the total contract value in personnel costs. Specialty trades with NAICS codes starting with 237 or 238 must self-perform 25% of personnel costs. Offerors must provide a breakdown of personnel and material/equipment costs by specification division, with a calculation of the percentage of self-performed personnel costs out of the total personnel costs for prime contractors and subcontractors. Home office overhead, profit/fee, and bond costs are added after calculating the subtotal of personnel and material/equipment costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0023 0003.pdf | ||
| PCRA Memorandum 7-11.doc | DOC document | |
| 626-23-201 Replace Chiller 2 Layout_Rev1.pdf | ||
| Switch Gear Location.pdf | ||
| Painting Standards.pdf | ||
| 36C24923B0023 0002.docx | DOCX document | |
| Pre-Bid Site Walk Sign In_Replace Chiller2_28SEP23.pdf | ||
| 36C24923B0023 0001.docx | DOCX document | |
| VA Provided Chiller Cutsheets.pdf | ||
| UEI _ TAX ID.docx | DOCX document | |
| 626-24-201 Chiller 2 Specs.pdf | ||
| Sample ATS 13 VA Commissioning.pdf | ||
| RFI Form.docx | DOCX document | |
| DBA wage determination TN20230178 modification 4 last revised 06302023.pdf | ||
| General Conditions Breakout.xlsx | XLSX spreadsheet | |
| One Line Diagram 8-3-23.pdf | ||
| VA Chiller Details.pdf | ||
| 626-23-201 Replace Chiller 2 Layout.pdf | ||
| 36C24923B0023_1.docx | DOCX document | |
| Current 650 Ton Chiller 160-73-o2 Operating and Maintenance Manual.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document | |
| Sample Chiller Installation Checklist.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK Project # 626-24-201 Replace Chiller #2 Nashville Campus
Offerors for General Construction (NAICS code 238220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)
Sub Total (Personnel Costs, Material/Equipment Costs)
Profit $ Home Office Overhead $ Bond $ Grand Total $
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $
4. Self-performed work = Line 3/Line 1 x 100 = %
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
File details come from the government source that posted it. Updated .