626-23-201 Replace Chiller 2 Layout.pdf
PDF 175 KB Posted
- Attached to
- N041--626-24-201 - Replace Chiller #2 Tennessee Valley Healthcare System, Nashville Campus
- Solicitation number
- 36C24923B0023
About this file
This solicitation package includes plans and specifications for replacing an existing chiller at the Tennessee Valley Healthcare System campus in Nashville. The project involves removing an existing chiller and installing a new VA-provided chiller, replacing associated condenser and chilled water piping with larger-sized lines, installing new control valves, and removing and replacing walls for the chiller installation. Bidders should note that no reused components are allowed for the pipe replacements. The solicitation number is 36C24923B0023 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 9 for project N041-626-24-201.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0023 0003.pdf | ||
| PCRA Memorandum 7-11.doc | DOC document | |
| 626-23-201 Replace Chiller 2 Layout_Rev1.pdf | ||
| Switch Gear Location.pdf | ||
| Painting Standards.pdf | ||
| 36C24923B0023 0002.docx | DOCX document | |
| Pre-Bid Site Walk Sign In_Replace Chiller2_28SEP23.pdf | ||
| 36C24923B0023 0001.docx | DOCX document | |
| Calculation of Self Performance Work.pdf | ||
| VA Provided Chiller Cutsheets.pdf | ||
| UEI _ TAX ID.docx | DOCX document | |
| 626-24-201 Chiller 2 Specs.pdf | ||
| Sample ATS 13 VA Commissioning.pdf | ||
| RFI Form.docx | DOCX document | |
| DBA wage determination TN20230178 modification 4 last revised 06302023.pdf | ||
| General Conditions Breakout.xlsx | XLSX spreadsheet | |
| One Line Diagram 8-3-23.pdf | ||
| VA Chiller Details.pdf | ||
| 36C24923B0023_1.docx | DOCX document | |
| Current 650 Ton Chiller 160-73-o2 Operating and Maintenance Manual.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document | |
| Sample Chiller Installation Checklist.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHATVHJesseR Polygon
VHATVHJesseR Polygon
VHATVHJesseR Text Box Chiller #2
VHATVHJesseR Callout Condenser lines to be replaced/up-sized 14": Deduct Alternate
VHATVHJesseR Callout Chilled water lines to be replaced/up-sized 12": Deduct Alternate
VHATVHJesseR Line
VHATVHJesseR Group
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Group
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Group
VHATVHJesseR Typewritten Text = New Control Valve Locations
VHATVHJesseR Polygon
VHATVHJesseR Callout Wall(s) to be removed for chiller installation. Replace immediately after installation
VHATVHJesseR Polygon
VHATVHJesseR Line
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Rectangle
VHATVHJesseR Callout Chiller to be replaced with VA provided Chiller
VHATVHJesseR Text Box Note: When replacing pipes, do not reuse any components, sections, devices, ports meters, gauges, etc.
See VA Details
VHATVHJesseR Polygon
VHATVHJesseR Polygon
Blank Page
File details come from the government source that posted it. Updated .