This solicitation package includes plans and specifications for replacing an existing chiller at the Tennessee Valley Healthcare System campus in Nashville. The project involves removing an existing chiller and installing a new VA-provided chiller, replacing associated condenser and chilled water piping with larger-sized lines, installing new control valves, and removing and replacing walls for the chiller installation. Bidders should note that no reused components are allowed for the pipe replacements. The solicitation number is 36C24923B0023 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 9 for project N041-626-24-201.

View the file

Other files

File Type Posted
36C24923B0023 0003.pdf PDF
PCRA Memorandum 7-11.doc DOC document
626-23-201 Replace Chiller 2 Layout_Rev1.pdf PDF
Switch Gear Location.pdf PDF
Painting Standards.pdf PDF
36C24923B0023 0002.docx DOCX document
Pre-Bid Site Walk Sign In_Replace Chiller2_28SEP23.pdf PDF
36C24923B0023 0001.docx DOCX document
Calculation of Self Performance Work.pdf PDF
VA Provided Chiller Cutsheets.pdf PDF
UEI _ TAX ID.docx DOCX document
626-24-201 Chiller 2 Specs.pdf PDF
Sample ATS 13 VA Commissioning.pdf PDF
RFI Form.docx DOCX document
DBA wage determination TN20230178 modification 4 last revised 06302023.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
One Line Diagram 8-3-23.pdf PDF
VA Chiller Details.pdf PDF
36C24923B0023_1.docx DOCX document
Current 650 Ton Chiller 160-73-o2 Operating and Maintenance Manual.pdf PDF
Contractor EMR Certification Form.docx DOCX document
Sample Chiller Installation Checklist.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHATVHJesseR Polygon

VHATVHJesseR Polygon

VHATVHJesseR Text Box Chiller #2

VHATVHJesseR Callout Condenser lines to be replaced/up-sized 14": Deduct Alternate

VHATVHJesseR Callout Chilled water lines to be replaced/up-sized 12": Deduct Alternate

VHATVHJesseR Line

VHATVHJesseR Group

VHATVHJesseR Rectangle

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Oval

VHATVHJesseR Group

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Oval

VHATVHJesseR Rectangle

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Oval

VHATVHJesseR Rectangle

VHATVHJesseR Line

VHATVHJesseR Group

VHATVHJesseR Typewritten Text = New Control Valve Locations

VHATVHJesseR Polygon

VHATVHJesseR Callout Wall(s) to be removed for chiller installation. Replace immediately after installation

VHATVHJesseR Polygon

VHATVHJesseR Line

VHATVHJesseR Rectangle

VHATVHJesseR Line

VHATVHJesseR Line

VHATVHJesseR Rectangle

VHATVHJesseR Callout Chiller to be replaced with VA provided Chiller

VHATVHJesseR Text Box Note: When replacing pipes, do not reuse any components, sections, devices, ports meters, gauges, etc.