626-23-201 Replace Chiller 2 Layout_Rev1.pdf
PDF 182 KB Posted
- Attached to
- N041--626-24-201 - Replace Chiller #2 Tennessee Valley Healthcare System, Nashville Campus
- Solicitation number
- 36C24923B0023
About this file
This document package includes a drawing layout and federal contract opportunity related to replacing Chiller #2 at the Tennessee Valley Healthcare System Nashville Campus. The drawing layout depicts the location of Chiller #2 and calls out items to be replaced such as condenser and chilled water lines. It also notes the chiller, control valves, and piping will be replaced and components should not be reused.
The related federal contract opportunity is solicitation number 36C24923B0023 to replace Chiller #2 under the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 9. The opportunity type is a solicitation but no further details are provided on response dates, award dates, pricing terms, or set asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0023 0003.pdf | ||
| PCRA Memorandum 7-11.doc | DOC document | |
| Switch Gear Location.pdf | ||
| Painting Standards.pdf | ||
| 36C24923B0023 0002.docx | DOCX document | |
| Pre-Bid Site Walk Sign In_Replace Chiller2_28SEP23.pdf | ||
| 36C24923B0023 0001.docx | DOCX document | |
| Calculation of Self Performance Work.pdf | ||
| VA Provided Chiller Cutsheets.pdf | ||
| UEI _ TAX ID.docx | DOCX document | |
| 626-24-201 Chiller 2 Specs.pdf | ||
| Sample ATS 13 VA Commissioning.pdf | ||
| RFI Form.docx | DOCX document | |
| DBA wage determination TN20230178 modification 4 last revised 06302023.pdf | ||
| General Conditions Breakout.xlsx | XLSX spreadsheet | |
| One Line Diagram 8-3-23.pdf | ||
| VA Chiller Details.pdf | ||
| 626-23-201 Replace Chiller 2 Layout.pdf | ||
| 36C24923B0023_1.docx | DOCX document | |
| Current 650 Ton Chiller 160-73-o2 Operating and Maintenance Manual.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document | |
| Sample Chiller Installation Checklist.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHATVHJesseR Polygon
VHATVHJesseR Polygon
VHATVHJesseR Text Box Chiller #2
VHATVHJesseR Callout Condenser lines to be replaced/up-sized 14": Deduct Alternate
VHATVHJesseR Callout Chilled water lines to be replaced/up-sized 12": Deduct Alternate
VHATVHJesseR Line
VHATVHJesseR Group
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Group
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Oval
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Group
VHATVHJesseR Typewritten Text = New Control Valve Locations
VHATVHJesseR Polygon
VHATVHJesseR Callout Full Height CMU (chiller side) with steel studs and GWB on corridor side.
VHATVHJesseR Polygon
VHATVHJesseR Rectangle
VHATVHJesseR Line
VHATVHJesseR Line
VHATVHJesseR Rectangle
VHATVHJesseR Callout Chiller to be replaced with VA provided Chiller
VHATVHJesseR Text Box Note: When replacing pipes, do not reuse any components, sections, devices, ports meters, gauges, etc.
See VA Details
VHATVHJesseR Polygon
VHATVHJesseR Polygon
VHATVHJesseR Rectangle
VHATVHJesseR Rectangle
VHATVHJesseR Callout Drawings indicating columns.
VHATVHJesseR Callout Steel Studs with GWB.
VHATVHJesseR Line
Blank Page
File details come from the government source that posted it. Updated .