FY26 - SOW Radial Gate Specs FINAL - ES.pdf
PDF 3 MB Posted
- Attached to
- Tainter Gates Sandblasting
- Solicitation number
- 191BWC26B0001
About this file
This file contains the technical specifications for the Amistad Reservoir and Dam Project Radial Gate Rehabilitation located in Val Verde County, Texas, issued by the International Boundary and Water Commission, United States Section (USIBWC). The project involves comprehensive rehabilitation of eight radial (tainter) gates at Amistad Dam, including surface preparation, abrasive blasting, complete recoating, and replacement of critical components.
The scope of work includes lead-based paint assessment and remediation, complete removal of existing paint and coating from all eight gates through abrasive blasting, application of a new coating system, replacement of all gate anodes, side seals, bottom seals, and seal fasteners, re-tensioning of gate cables, and gate alignment verification. The work also encompasses mobilization, demobilization, quality control, safety compliance, environmental controls, and final closeout activities. Key contractual requirements include submission of an Accident Prevention Plan, Activity Hazard Analyses, Quality Control Plan, Stormwater Pollution Prevention Plan, schedule, and photographic documentation. The contractor must comply with Davis-Bacon Act wage requirements, maintain certified payroll records, obtain all necessary permits, perform lead testing using accredited laboratories, manage hazardous waste disposal in accordance with TCEQ regulations, and obtain performance and payment bonds. The specifications mandate a two-year warranty on all construction work, substantial completion within the contract period, and comprehensive Record Drawings documenting final as-built conditions. Contract administration requires coordination through the Contracting Officer's Representative, weekly progress meetings, and adherence to strict quality control protocols with independent testing and inspection agencies. Environmental compliance is required under the Clean Water Act, Endangered Species Act, and National Historic Preservation Act, with provisions for protection of cultural resources and migratory bird nesting sites.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Front Cover
International Boundary and Water Commission United States and Mexico United States Section
Technical Specifications Amistad Reservoir and Dam Project Radial Gate Rehabilitation Val Verde County, Texas
Solicitation 191BWC26Bxxxx
January 29,2026
International Boundary and Water Commission United States Section Amistad Dam Field Office Del Rio, Texas
These Technical Specifications may be reprinted after Contract award using the awarded Contract number instead of the Solicitation number currently shown. The reprint shall have all changes indicated incorporated.
Reissuance of the awarded Technical Specifications with the Contract number will proceed without an amendment or modification.
Reissuance with the Contract number will NOT result in a new date being displayed on the Technical Specifications.
PLEASE NOTE - Technical Specifications should be printed double sided.
Please conserve paper and print double sided.
USIBWC Amistad Reservoir and Dam Project
January 29, 2026 Division 00 USIBWC Solicitation 191BWC26Bxxxx Procurement and Contracting Requirements-Page 1
US International Boundary & Water Commission
International Boundary and Water Commission United States Section
TECHNICAL SPECIFICATIONS
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
Radial Gate Rehabilitation US International Boundary & Water Commission Amistad Reservoir and Dam Project Procurement and Contracting Requirements
Division 00
Division 00-Procurement and Contracting Requirements
Division 00 January 29, 2026 Procurement and Contracting Requirements-Page 2 USIBWC Solicitation 191BWC26Bxxxx
This page intentionally left blank for double sided printing.
January 29, 2026 Table of Contents Governing USIBWC Solicitation 191BWC26Bxxxx 00.01.10-Page 1
SECTION 00.01.10
TABLE OF CONTENTS GOVERNING
00.01.10 Table of Contents Governing 00.01.10-Table of Contents Governing
Table of Contents
DIVISIONS AND SECTIONS
Division 00-Procurement and Contracting Requirements 00.01.10-Table of Contents Governing 00.21.13-Instructions to Bidders
00.31.19-Existing Condition Information ******* 00.31.24-Environmental Information 00.31.26-Existing Hazardous Material Information 00.31.43-Permit Application 00.60.00-USIBWC Forms and Standard Documents 00.70.00-Delivery of Data to USIBWC 00.70.13-Project Data 00.72.00-Order of Precedence 00.73.63-Security Requirements ********* 00.73.73-Requirements for Sensitive But Unclassified 00.91.16-Bid Revisions
Division 01-General Requirements 01.11.00-Summary of Work 01.20.00-Measurement and Payment 01.29.00-Payment Procedures 01.29.15-Certified Payroll 01.31.00-Project Coordination 01.32.16-Construction Progress Schedule 01.32.33-Photographic Documentation 01.33.00-Submittal Procedures 01.35.23-Safety 01.42.00-References 01.43.26-Testing and Inspection Agencies 01.45.00-Quality Control 01.51.00-Temporary Utilities 01.52.13-Field Offices and Sheds 01.55.26-Traffic Control and Project Signage 01.57.00-Temporary Controls for Work Areas 01.57.19-Temporary Environmental Controls 01.61.00-Common Product Requirements 01.61.16-Use of Recovered Materials and Biobased Products 01.71.13-Mobilization 01.74.19-Construction Waste Management and Disposal 01.77.19-Closeout Requirements 01.78.36-Warranties ******* 01.78.39-Record Drawings
Division 02-Existing Conditions 02.01.00-Existing Conditions and Facilities 02.26.26-Lead Assessment 02.83.00-Lead Remediation and Disposal
Table of Contents Governing January 29, 2026 00.01.10-Page 2 USIBWC Solicitation 191BWC26Bxxxx
Division 05-Metal 05.05.23-Welding 05.50.03-Miscellaneous Metalwork
Division 09-Finishes 09.97.02-Painting Hydraulic Structures
Division 35-Waterway Construction 35.22.46-Tainter Gates *********
Technical Specification Tables Table 1 - Technical Specification Reference Protocols
Table 2 - Amistad Dam and Radial Gate Drawings
Table 3 - Required Minimum Biobased Content
Table 4 - Warranty Priority Code B
Table 5 - Warranty Priority Code C
Table 6 - V-102E
Table 7 - VZ-108D
Table 8 - V-766E
Table 9 - System No 3
Table 10 - System No 3-A-Z
Table 11 - Vinyl Paint Thinners
Table 12 - Neoprene Gate Seals
Table 13 - Current Specification Standards
Technical Specification Figures Figure 1 - Fillable Form (not printed)
Figure 2 - Printed Fillable Form
Figure 3 - Downstream face of Amistad Dam
--End of Section--
January 29, 2026 Instructions to Bidders USIBWC Solicitation 191BWC26Bxxxx 00.21.13-Page 1
SECTION 00.21.13
INSTRUCTIONS TO BIDDERS
00.21.13 Instructions to Bidders 00.21.13-Instructions to Bidders
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. Definitions
1.5. Technical Specification Reference Protocols
1.6. Duty to Inquire
1.7. Investigation of Site Conditions
1.8. Bid Items
1.9. Specifications
1.10. Bid Submission
Part 2 - Execution
2.1. Requests for Interpretation (Duty to Inquire)
--End of Section--
1.2. REFERENCE STANDARDS
1.2.A. Federal Acquisition Regulation (FAR)
1. FAR 52.236-3, Site Investigation and Conditions Affecting the Work
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. DEFINITIONS
1.4.A. Within this Section, the following terms are used interchangeably.
1. Bid - Offer - Proposal
2. Solicitation - Request for Proposal - RFP
3. Bidder - Offeror - Contractor
1.5. TECHNICAL SPECIFICATION REFERENCE PROTOCOLS
1.5.A. Use the reference protocols in Table 1 to refer to items within Technical Specifications.
1.5.B. Every Section has three Parts with multiple paragraphs. Always include the section number with the full paragraph number when referencing any item within these Technical Specifications.
1. For example, the proper reference to this paragraph is Section 00.21.13 Paragraph 1.5.B.1.
1.6. DUTY TO INQUIRE
1.6.A. Bidders shall review the full Solicitation and all Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc.
to determine the full scope of work required.
Instructions to Bidders January 29, 2026 00.21.13-Page 2 USIBWC Solicitation 191BWC26Bxxxx
Table 1 - Technical Specification Reference Protocols Level Type Example Format Reference Format Division 1 Numeric 35 Level 1 Division 35 Section 2 Numeric 35.41.00 Level 1.Level 2 Section 35.41.00 Part 3 Numeric Part 3 Part Level 3 Section 35.41.00 Part 3 Subsection 4 Numeric 3.7. Level 3.Level 4. Section 35.41.00 3.7.
Paragraph 5 Alphabet 3.7.E. Level 3.Level 4.Level 5. Section 35.41.00 3.7.E.
Paragraph Subitem 6 Numeric 2. Level 6 Section 35.41.00 3.7.E.2.
Paragraph Subitem 7 Alphabet h. Level 7 Section 35.41.00 3.7.E.2.h.
Paragraph Subitem 8 Numeric (1) Level 8 Section 35.41.00 3.7.E.2.h.(1) Paragraph Subitem 9 Alphabet (b) Level 9 Section 35.41.00 3.7.E.2.h.(1)(b)
1.6.B. If during review of these items, the Bidder finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire. The Bidder shall also inquire about items that are open to interpretation.
1.6.C. The Bidder shall inquire about items as soon as they are discovered, whether before deadline for submission of bidder questions, whether after deadline for submission of bidder questions, whether after submission of bids, or whether after Contract award.
1.6.D. If the Bidder fails to inquire, they forfeit their right to any claim based upon said discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation. The Bidder shall be proceeding at their own risk based upon only their unilateral interpretation.
1.6.E. The Bidder shall take no advantage of any item of which they have a duty to inquire.
1.7. INVESTIGATION OF SITE CONDITIONS
1.7.A. The Bidder, as well as their subcontractors, is urged to visit the worksite and project area to become fully aware as to the existing conditions affecting the work to be performed under the Contract documents. A site visit will be announced during the solicitation. Each Bidder shall attend at their own expense. The Government will not pay for any site visits. This visit is intended to provide the potential Bidders the opportunity to observe site conditions and incorporate into their proposal any required work based on site conditions. The Bidder will have the opportunity to walk around during the site visit. Unless otherwise noted, no other opportunity will exist for visits to the site.
1.7.B. The Bidder shall be responsible for ensuring that all of its suppliers, manufactures and subcontractors have reviewed all applicable Contract documents relative to their work. The Bidder shall provide all labor, material, equipment, and services not provided by the Bidder’s suppliers, manufacturers, fabricators, and/or subcontractors but required for complete and operable facilities as described in the Contract documents.
1.7.C. Bidder has the sole responsibility to make such independent investigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in accordance with the SOW.
1.7.D. The Government assumes no responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of the Bidder's officers or agents before the execution of this Contract, unless that understanding, or representation is expressly stated in the Contract documents.
1.7.E. Any failure of the Bidder to take the actions described and acknowledged in this Section will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work.
January 29, 2026 Instructions to Bidders USIBWC Solicitation 191BWC26Bxxxx 00.21.13-Page 3
1.8. BID ITEMS
1.8.A. The Contract Line Item Numbers (CLIN) that shall be bid upon are identified in Section B (bid schedule) of the Solicitation.
1.8.B. The Bidder shall include all work related costs within its bid unit prices even if not specifically listed in the bid schedule.
1.8.C. If an error exists on the bid schedule between the CLIN total cost provided and the resultant value of the CLIN quantity multiplied by the bid unit price, the bid unit price provided shall govern.
1.8.D. If the bid schedule includes CLINs entitled Receiving Lines, No Cost Receiving Lines, No Cost Receiving Lines for IBWC Use Only, Receiving Lines for Internal Use Only, or similarly, then the Bidder shall not provide a bid price for this CLIN. Receiving lines are used for USIBWC's computer system to make pay estimate processing easier. These are an administrative CLIN and have no value on the Contract.
1.9. SPECIFICATIONS
1.9.A. The Government does not implicitly warrant performance specifications for complete accuracy or adequacy. Typical performance type specifications set forth an objective or standard to be achieved, and the successful Bidder is expected to exercise their ingenuity in achieving that objective or standard of performance, selecting the means and assuming a corresponding responsibility for that selection.
1.9.B. When a particular product or manufacturer is identified by name, but permits substitution of ‘an approved equal,’ such a specification is ‘performance’ in nature and, as a result, carries no implied warranty.
1.9.C. The Technical Specifications are written in imperative and abbreviated form. This imperative language is directed at the Contractor, unless specifically noted otherwise. Incomplete sentences shall be completed by inserting "shall", "the Contractor shall", and "shall be" or similar mandatory phrases by inference in the same manner as they are applied to notes on the Contract Drawings. The words "shall" are to be placed by inference where a colon (:) is used within sentences or phrases. Except as worded to the contrary, the Contractor shall fulfill (perform) all indicated requirements whether stated imperatively or otherwise.
1.9.D. All equipment and facilities shall be furnished, installed, and constructed by the Contractor to provide the Government with complete, ready to use components, systems, and facilities. All necessary materials and work required to accomplish this are the responsibility of the Contractor alone, whether or not specifically indicated on the Contract Drawings or stated in the Technical Specifications.
1.9.E. The various Sections of the Technical Specifications may contain references to standards, other specification sections, or items that do not apply to the work covered in this project. These references are to be considered for information only and can be ignored by the Contractor unless work changes and they become relevant. If conflicts arise from references or lack of references to standards or other specification sections, COR will determine the relevancy of the apparent conflicts.
1.10. BID SUBMISSION
1.10.A. Submission of a bid shall be conclusive evidence that the Bidder has reviewed, investigated, and acknowledged all items detailed in FAR 52.236-3 and listed below.
1. Conditions bearing upon transportation, disposal, handling, and storage of materials.
2. The availability of labor, water, electric power, and roads.
3. Uncertainties of weather and similar physical conditions at the site.
4. The conformation and conditions of the ground.
5. The security and safety conditions at and around the site.
6. The character of equipment and facilities needed preliminary to and during work performance.
Instructions to Bidders January 29, 2026 00.21.13-Page 4 USIBWC Solicitation 191BWC26Bxxxx
1.10.B. Submission of a bid shall be conclusive evidence that the Bidder has reviewed all Contract documents.
1.10.C. Submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, and the quantities of materials to be furnished.
1.10.D. Submission of a bid constitutes agreement that Bidder has provided written notice of all discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation discovered in the Contract documents, that responses to these written notices are acceptable to Bidder, and that Contract documents are sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing required work.
1.10.E. Bidder has the sole responsibility to make such independent instigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in a accordance with the Contract documents. The Government will not award a modification or additional funds for conditions that were observable but not considered by Bidder.
PART 2 - EXECUTION
2.1. REQUESTS FOR INTERPRETATION (DUTY TO INQUIRE)
2.1.A. Bidders shall submit requests for interpretation, questions, and other concerns about the Solicitation and Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc. to the Contracting Officer identified on SF-1442.
2.1.B. Such requests shall be made even if the question-and-answer period identified in the Solicitation has passed.
2.1.C. Failure to request interpretation prior to providing a bid shall result in the Bidder being fully responsible for any cost or time impacts involved to perform the work required.
January 29, 2026 Existing Condition Information ******* USIBWC Solicitation 191BWC26Bxxxx 00.31.19-Page 1
SECTION 00.31.19
EXISTING CONDITION INFORMATION *******
00.31.19 Existing Condition Information ******* 00.31.19-Existing Condition Information *******
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Measurement and Payment
1.4. General
1.5. Existing Structures
Part 2 - Products ....................................................................................................... Error! Bookmark not defined.
Part 3 - Execution ..................................................................................................... Error! Bookmark not defined.
--End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 00.73.73-Requirements for Sensitive But Unclassified
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
1.4.A. A report on the bridge deck and limitation to using a crane was performed by US Army Corps of Engineers (USACE). The findings were and available in a report, entitled "Amistad Dam Project Del Rio, Texas, Structural Analysis of Bridge Deck for International Boundary and Water Commission," dated January 2006.
1.4.B. The original construction specifications: Volume I and Volume II of the "Specifications for Construction Allocated to United States, Embankment, Non-Overflow, Power Intake, and Spillway," for solicitation UDA 65-3 dated August 1964.
1.4.C. Applicable original construction drawings are listed in Table 2.
1.4.D. The original "Amistad Dam, Rio Grande, Operation & Maintenance Manual," dated 1971 includes operations of the penstock and irrigation gates.
1.4.E. SBU items will be provided via a SharePoint link to Bidder after completion of a nondisclosure agreement (IBWC Form 358). See Section 00.73.73 for guidance on SBU data.
1. No more than 2 SharePoint links will be provided to each Bidder. To use SharePoint, a user must have a valid Microsoft account.
2. All unsuccessful Bidders shall provide IBWC Form 358A to the CO within 7 days of being notified of their unsuccessful offer.
Existing Condition Information ******* January 29, 2026 00.31.19-Page 2 USIBWC Solicitation 191BWC26Bxxxx
Table 2 - Amistad Dam and Radial Gate Drawings
IBWC Dwg# Description Date
(YYYY-MM-
DD)
18061-000-00 Amistad Dam Spillway-Overflow Monoliths Elevations and Details 1964-08 18061-000-01 Amistad Dam Spillway-Overflow Monoliths Elevations and Details Revision #1 1964-09-30 18062-000-00 Amistad Dam Spillway-Overflow Monoliths Pier and Weir Geometry 1964-08 18063-000-00 Amistad Dam Spillway-Overflow Monoliths Typical Pier Plan Elevations and Sections 1964-08 18063-000-02 Amistad Dam Spillway-Overflow Monoliths Typical Pier Plan Elevations and Sections Rev#2 1964-10-08 18107-000-00 Amistad Dam Spillway-Bridge Typical Span Plans and Elevations 1964-08 18108-000-00 Amistad Dam Spillway-Bridge Typical Span Sections and Details 1964-08 18178-000-00 Amistad Dam Spillway-Tainter Gates General Arrangement 1964-08 18179-000-00 Amistad Dam Spillway-Tainter Gates Elevations and Sections 1964-08 18180-000-00 Amistad Dam Spillway-Tainter Gates Girders Sections and Details I 1964-08 18181-000-00 Amistad Dam Spillway-Tainter Gates Girders Sections and Details II 1964-08 18181-000-01 Amistad Dam Spillway-Tainter Gates Girders Sections and Details II Revision #1 1964-10-23 18182-000-00 Amistad Dam Spillway-Tainter Gates Bracing Details I 1964-08 18183-000-00 Amistad Dam Spillway-Tainter Gates Bracing Details II 1964-08 18184-000-00 Amistad Dam Spillway-Tainter Gates Strut Bracing and Hub Details 1964-08 18184-000-01 Amistad Dam Spillway-Tainter Gates Strut Bracing and Hub Details Revision #1 1964-10-12 18185-000-00 Amistad Dam Spillway-Tainter Gates Trunnion Yoke and Pin Details 1964-08 18185-000-01 Amistad Dam Spillway-Tainter Gates Trunnion Yoke and Pin Details Revision #1 1964-10-12 18186-000-00 Amistad Dam Spillway-Tainter Gates Anchorage Assembly Box Girder Details I 1964-08 18187-000-00 Amistad Dam Spillway-Tainter Gates Anchorage Assembly Box Girder Details II 1964-08 18187-000-01 Amistad Dam Spillway-Tainter Gates Anchorage Assembly Box Girder Details II Revision #1 1964-10-23 18188-000-00 Amistad Dam Spillway-Tainter Gates Anchorage Assembly Details 1964-08 18188-000-01 Amistad Dam Spillway-Tainter Gates Anchorage Assembly Details Revision #1 1964-10-23 18189-000-00 Amistad Dam Spillway-Tainter Gates Side Seal Details 1964-08 18189-000-01 Amistad Dam Spillway-Tainter Gates Side Seal Details Revision #1 1964-10-08 18190-000-00 Amistad Dam Spillway-Tainter Gates Sill Beam Details 1964-08 18190-000-01 Amistad Dam Spillway-Tainter Gates Sill Beam Details Revision #1 1964-10-08 18191-000-00 Amistad Dam Spillway-Tainter Gates Machinery Layout General Arrangement 1964-08 18192-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Layout Details I 1964-08 18193-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Layout Details II 1964-08 18194-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Layout Details III 1964-08 18195-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Layout Details IV 1964-08 18196-000-00 Amistad Dam Spillway-Tainter Gates Hoist Drum Details 1964-08 18196-000-01 Amistad Dam Spillway-Tainter Gates Hoist Drum Details Revision #1 1964-10-23 18197-000-00 Amistad Dam Spillway-Tainter Gates Bull Gear Guard Details 1964-08 18198-000-00 Amistad Dam Spillway-Tainter Gates Hoist Cable Hitch Details 1964-08 18198-000-02 Amistad Dam Spillway-Tainter Gates Hoist Cable Hitch Details Revision #2 1964-10-23 18198-000-03 Amistad Dam Spillway-Tainter Gates Hoist Cable Hitch Details Revision #3 1965-06 18199-000-00 Amistad Dam Spillway-Tainter Gates Measuring Device General Arrangement 1964-08 18200-000-00 Amistad Dam Spillway-Tainter Gates Measuring Device Details I 1964-08 18201-000-00 Amistad Dam Spillway-Tainter Gates Measuring Device Details II 1964-08 18202-000-00 Amistad Dam Spillway-Tainter Gates Measuring Device Details III 1964-08 18203-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Bases Details I 1964-08 18204-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Bases Details II 1964-08 18205-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Bases Details III 1964-08 18206-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Bases Details IV 1964-08 18207-000-00 Amistad Dam Spillway-Tainter Gates Hoist Machinery Bases Details V 1964-08 18208-000-00 Amistad Dam Spillway-Tainter Gates Platforms Plans and Details 1964-08 18209-000-00 Amistad Dam Spillway-Tainter Gates Platforms Details 1964-08
USIBWC Solicitation 191BWC26Bxxxx 00.31.19-Page 3
IBWC Dwg# Description Date
(YYYY-MM-
DD)
18210-000-00 Amistad Dam Spillway-Tainter Gates Electric Pull Box Details 1964-08 18304-000-00 Amistad Dam Tainter Gates Cathodic Protection 1964-08
1.5. EXISTING STRUCTURES
1.5.A. Amistad Dam is the largest of the international multipurpose storage dams to be constructed on the Rio Grande by the United States and Mexico, in accordance with the 1944 Water Treaty between the two countries. The dam is operated and maintained jointly by the United States and Mexican Sections of the IBWC. Amistad Dam provides important flood control, water conservation, recreation, and electrical power production benefits. The Amistad Reservoir and Dam Project is located in Val Verde County, Texas and the State of Coahuila, Mexico, with the dam approximately 12.8 miles northwest of Del Rio, TX. Construction started on December 1964 and was completed in June 1969.
1.5.B. Amistad Dam has sixteen tainter (radial) gates. Gates 1 through 8 are owned and operated by the United States Section of IBWC (USIBWC) and gates 9 through 16 are owned and operated by the Mexican Section of IBWC. Each gate is approximately 55 feet high and 50 feet wide from pier to pier. Each gate is made up of a skin plate supported by three horizontal plate girders; the bottom and middle girder are
7.875 feet deep, and the top girder is 4.9 feet deep. The girders support thirty-five WT ribs, connecting to three struts. The girders and struts are braced with intermediate cross members. The struts merge at the trunnion hub, which bear against steel box girders secured with prestressed anchors in the reinforced concrete piers. The gate radius is 52 feet measured from the center line of trunnions to the downstream face of the plate. Rubber seals are provided for the full height of the gate. The rubber J type side seals bear on corrosion resisting steel side plates. The bottom rubber J type seal is bolted to the bottom edge of the gate. The gates are fabricated from low alloy steel conforming to ASTM A-441except for bracing which is ASTM A-36 steel. The gates utilize cable and hoist units mounted on top of the piers for operation.
1.5.C. A complete hoist, to operate each tainter gate consists of a right hand and a left-hand unit mounted on adjacent piers with the drive shaft connecting the two and spanning from pier-to- pier across the gate.
Hoists are mounted on top of piers at elevation 1153.0 with centerline of cable drum 33'-11 1/8" downstream from the axis of dam. Each hoist unit is designed for a cable pull of 120,900 pounds and operates the gate at 3/4-feet per minute for a distance of 48.7 feet. A Westinghouse 10 HP, 440 volt, 60 cycle, 1200 RPM motor provides the required power for operating each hoist unit. Speed reduction beginning at motor is accomplished by: a 12.5:1 Winsmith Series CB reducer with single output shaft, a 149.9:1 Lufkin type T T290H; and a 6.85:1 reduction at cable drum. A Cutler Hammer traveling nut type limit switch is provided for stopping the tainter gate at the various control levels. Braking is accomplished by means of a Westinghouse type TM magnetic brake enclosed in a weatherproof housing and rated at 75-foot pounds torque. An indicator dial which indicates the position of the gate at any instant is driven by a Winsmith Series CB reducer, Unit #1, ratio 10:1.
1.5.D. Existing gates have been in service for more than 55 years, and equipment needs to be maintenance due to malfunctions and safety issues. This equipment is very important to daily dam operations on the Amistad Dam. During the last 5 year inspection performed by the USACE Corp of Engineers there were a couple of findings. Findings included hoist wire rope tension adjustment, gate seal replacements and loose fasteners, trunnion friction, damaged grease lines and needed gate painting.
1.5.E. Without any upgrade for the last 20 years current gate deficiencies are affecting Amistad Dam daily operations. Not performing the necessary maintenance and replacements of the radial gates will affect flood operations and represent a safety hazard for all downstream communities
Existing Condition Information ******* January 29, 2026 00.31.19-Page 4 USIBWC Solicitation 191BWC26Bxxxx
USIBWC Solicitation 191BWC26Bxxxx 00.31.19-Page 5
January 29, 2026 Environmental Information USIBWC Solicitation 191BWC26Bxxxx 00.31.24-Page 1
SECTION 00.31.24
ENVIRONMENTAL INFORMATION
00.31.24 Environmental Information 00.31.24-Environmental Information
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Reference Standards
1.4. Measurement and Payment
1.5. General
1.6. Preservation of Cultural and Natural Resources and the Environment
1.7. Other Considerations
1.8. NEPA Documentation
--End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 01.57.00-Temporary Controls for Work Areas
1.2.B. Section 01.57.19-Temporary Environmental Controls
1.3. REFERENCE STANDARDS
1.3.A. United States Code (USC)
1. Clean Air Act, 42 USC 7401 et seq.
2. Clean Water Act (CWA), 33 USC 1251 et seq.
3. Endangered Species Act (ESA), 16 USC 1531 et seq.
4. Migratory Bird Treaty Act (MBTA), 16 USC 703 - 712
5. National Environmental Policy Act (NEPA), 42 USC 4321-4347
6. National Historic Preservation Act (NHPA), 54 USC 300101 et seq.
7. National Wildlife Refuge System Improvement Act of 1997, 16 USC 668dd
8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC 3001 et. seq.
9. Refuge Recreation Act, 16 USC 460k - 460k-4
1.4. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.5. GENERAL
Further details of environmental requirements are in Sections 01.57.00 and 01.57.19.
1.6. PRESERVATION OF CULTURAL AND NATURAL RESOURCES AND THE ENVIRONMENT
1.6.A. If the Contractor initiates change 6to the Contract and USIBWC approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.
1.6.B. Culturally Sensitive Areas
Environmental Information January 29, 2026 00.31.24-Page 2 USIBWC Solicitation 191BWC26Bxxxx
If a site, building, or location of historical, archaeological, educational, or scientific interest is discovered within the right of way, cease all work immediately, secure the site from further disturbance and possible vandalism, and notify USIBWC. The site, building, or location will be investigated and evaluated by
USIBWC.
1.7. OTHER CONSIDERATIONS
The Contractor is required to ensure that all Environmental Permits, Issues, and Comments (EPIC), which are included within the Contract documents are followed and implemented to ensure potential impacts are avoided.
1.8. NEPA DOCUMENTATION
The USIBWC shall complete appropriate NEPA documentation prior to the construction of the project. The USIBWC will be responsible for compliance with National Environmental Policy Act (NEPA).
January 29, 2026 Existing Hazardous Material Information USIBWC Solicitation 191BWC26Bxxxx 00.31.26-Page 1
SECTION 00.31.26
EXISTING HAZARDOUS MATERIAL INFORMATION
00.31.26 Existing Hazardous Material Information 00.31.26-Existing Hazardous Material Information
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Measurement and Payment
1.3. General
--End of Section--
1.2. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3. GENERAL
1.3.A. USIBWC has a reasonable belief that lead-based paint exists on the tainter gates.
1.3.B. There have been 3 lead surveys at Amistad Dam, but none of them tested the tainter gates.
1. "Amistad Dam Asbestos and Lead-Based Paint Survey," by CH2M Hill dated December 7, 2004.
2. "Asbestos& Lead-Based Paint Survey Report, USIBWC Amistad Power Plant and Warehouse, Del
Rio, Texas," by TRC dated May 31, 2012.
3. "Asbestos& Lead-Based Paint Survey Report, USIBWC Amistad Dam Facility, 670 Texas Spur
349," by TRC dated March 19, 2014.
1.3.C. The "Specifications for Construction Allocated to United States, Embankment, Non-Overflow, Power Intake, and Spillway," indicate in Section 22 Paragraph 22-15 states that red-lead paint was used in the original construction. USIBWC does not know if this paint was ever removed or if additional coats of lead-based paint were applied to the gates.
Existing Hazardous Material Information January 29, 2026 00.31.26-Page 2 USIBWC Solicitation 191BWC26Bxxxx
January 29, 2026 Permit Application USIBWC Solicitation 191BWC26Bxxxx 00.31.43-Page 1
SECTION 00.31.43
PERMIT APPLICATION
00.31.43 Permit Application 00.31.43-Permit Application
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. General
1.5. Work in Waters of the United States
1.6. Responsibilities
--End of Section--
1.2. REFERENCE STANDARDS
Texas Commission on Environmental Quality (TCEQ)
1. Texas Pollutant Discharge Elimination System (TPDES)
2. TPDES 2018 Construction General Permit TXR150000 dated January 28, 2022
1.2.B. US Army Corps of Engineers (USACE)
1. Section 404 of Clean Water Act, 33 USC 1251 et seq.
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
Prior to the beginning of construction, the Contractor shall be responsible for researching, coordinating, obtaining, and paying all applicable fees for all permits required by Federal, state, and local entities, including, but not limited to, a specific or general stormwater permit prepared in accordance with the requirements of Stormwater Pollution Prevention Plan (SWPPP) and Texas Pollutant Discharge Elimination System (TPDES) 2018 General Permit TXR150000.
1.5. WORK IN WATERS OF THE UNITED STATES
1.5.A. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by this permit.
1.5.B. If Contractor initiated changes in the construction method result in impacts to waters of the US, the Contractor shall have sole responsibility to obtain all required new or revised Section 404 permit and shall adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
1.6. RESPONSIBILITIES
1.6.A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention (SWPP) measures.
Permit Application January 29, 2026 00.31.43-Page 2 USIBWC Solicitation 191BWC26Bxxxx
1.6.B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the USIBWC. However, borrow pits and other offsite locations are subject to local regulations. The Contractor is responsible for researching and obtaining all necessary permits for offsite work.
1.6.C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.
The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract Drawings and Technical Specifications prior to the beginning of construction. For the work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state, and local entities, unless otherwise specified within the Contract Provisions and these Technical Specifications.
1.6.D. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.
1.6.E. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.
January 29, 2026 USIBWC Forms and Standard Documents USIBWC Solicitation 191BWC26Bxxxx 00.60.00-Page 1
SECTION 00.60.00
USIBWC FORMS AND STANDARD DOCUMENTS
00.60.00 USIBWC Forms and Standard Documents 00.60.00-USIBWC Forms and Standard Documents
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Measurement and Payment
1.3. General
1.4. Forms
1.5. Using PDF Forms
1.6. Printing
--End of Section--
1.2. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3. GENERAL
1.3.A. Standard items are available at USIBWC's website at www.ibwc.gov/resources-info/.
1. All forms are under the link entitled USIBWC Construction Forms.
2. Posters are under the link entitled Construction Contractor Posters.
3. Drawing standards and related files are under the link entitled USIBWC's Standard Drawings, CAD files, and Drawing and CAD Standards.
1.3.B. Contractor shall use the most current version of each form.
1.3.C. Form filenames contain a date. This date is the revision date of the form. Keeping the date in the filename can cause confusion when submitting files. Prior to submitting the forms, rename the file as suggested in these Technical Specifications or as agreed to with the COR.
1.4. FORMS
1.4.A. The following USIBWC forms shall be used:
1. Form 119 Pay Estimate-Construction
2. Form 119B Pay Estimate Breakdown
3. Form 146 Transmittal Form
4. Form 147 Submittal Register
5. Form 148 Log of Photographic Documentation
6. Form 149 Schedule Analysis
7. Form 150 Log of Deficiencies/Punch List
8. Form 152 Pay Item Breakdown
9. Form 153 Monthly Exposure & First Aid Report
10. Form 154 Subcontractor's Payment Breakdown
11. Form 161 Actual Weather and Working Conditions Report https://www.ibwc.gov/resources-info/
USIBWC Forms and Standard Documents January 29, 2026 00.60.00-Page 2 USIBWC Solicitation 191BWC26Bxxxx
12. Form 162 Record of Preparatory Phase Meeting
13. Form 163 Daily Construction Quality Control Report
14. Form 163A Equipment Mobilization/Demobilization
15. Form 164A Activity Hazard Analysis
16. Form 166 Record of Initial Phase Meeting
17. Form 207 Use of AutoCad Files
18. Form 225 Use of USIBWC Key
19. Form 227 Wage Deduction Authorization
20. Form 231 Truck Owner-Operator Certification of Ownership
21. Form 232 Owner-Operator Payroll Listing
22. Form 233 Request for Information
23. Form 233A Request for Information Log
24. Form 235 Concrete Test Results Summary
25. Form 237 Nuclear Gauge Test Results
a. The COR may allow the use of the laboratory's form if ALL of the information contained on Form 237 is included.
26. Form 238 Concrete Placement Card
27. Form 239 Schedule of Materials
28. Form 240 Nuclear Gauge Moisture Calibration
29. Form 241 Nuclear Gauge Standard Count
30. Form 243 Release of Claims
31. Form 253 Construction Closeout Checklist
32. Form 255 Certificate of Substantial Completion
33. Form 358 Nondisclosure Agreement
34. Form 358A Nondisclosure Agreement Release
35. Form 359 Hand Receipt
1.4.B. The following forms are available for use, but are not required:
1. Form 119A Contractor Pay Estimate Inventory
2. Form 164 Weekly Toolbox Safety Meeting
3. Form 204 Use of USIBWC Logo
4. Form 226 Statement of Labor Compliance
5. Form 228 Nonperformance Payroll Report
6. Form 264 Safety Inspection Mechanized Equipment
7. Form 265 Safety Inspection for Cranes
8. Form 266 Safety Inspection for On Highway Vehicle
1.5. USING PDF FORMS
1.5.A. Providing Fillable Forms to USIBWC
1. Fillable forms shall be "printed" prior to sending to USIBWC. Printing a fillable form to pdf fixes the form data permanently so it cannot be changed. It also allows the merging of multiple pdf files without compromising form data. See Figure 1 and Figure 2 as examples.
January 29, 2026 USIBWC Forms and Standard Documents USIBWC Solicitation 191BWC26Bxxxx 00.60.00-Page 3
a. Printing resolution shall not be less than 400 dpi. 1200 dpi is preferred and easily handled by Adobe Acrobat.
Figure 1 - Fillable Form (not printed)
Figure 2 - Printed Fillable Form
1.5.B. Providing Adobe Electronic Signatures to USIBWC Whenever an Adobe digital signature is used, ensure that the file is printed to pdf afterwards. This ensures that the digital signature is locked and cannot change but is also allows the resulting file to be combined without pdf files without errors.
1.5.C. Unless otherwise allowed by the COR or this Section, the electronic version all forms shall be used. This means that forms shall not be printed and then filled out by hand. Instead, they shall be filled out electronically and then printed to pdf.
1.5.D. The following forms are allowed to be filled out by hand: 162, 164, 166, 227, 231, 237, 238, 358, and
359. Once completed by hand, they shall be scanned at no less than 400 dpi resolution and provided to USIBWC in a pdf document.
1.6. PRINTING
The Contractor is responsible for printing copies of items provided in electronic format for their own use.
USIBWC Forms and Standard Documents January 29, 2026 00.60.00-Page 4 USIBWC Solicitation 191BWC26Bxxxx
January 29, 2026 Delivery of Data to USIBWC USIBWC Solicitation 191BWC26Bxxxx 00.70.00-Page 1
SECTION 00.70.00
DELIVERY OF DATA TO USIBWC
00.70.00 Delivery of Data to USIBWC 00.70.00-Delivery of Data to USIBWC
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Reference Standards
1.4. Measurement and Payment
1.5. General
1.6. Adobe PDF Files
1.7. Image Files
--End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 01.32.33-Photographic Documentation
1.3. REFERENCE STANDARDS
1.3.A. Federal Risk and Authorization Management Program (FedRAMP)
1.4. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.5. GENERAL
1.5.A. USIBWC will perform most document transfer communications via email.
1.5.B. The Contractor shall send all files electronically via email whenever possible. USIBWC's email system can accept files up to 20 MB. Large files shall be transferred via online cloud servers or SharePoint.
1. Online cloud servers shall be FedRAMP compliant.
2. Files transferred through a download link via email will be treated the same as receiving the file via email.
3. Files made available via download shall be grouped in folders or zipped to allow for easy download of a large group of files at one time. However, no zipped file or folder shall exceed 500 MB in size.
1.5.C. USIBWC cannot accept USB thumb drives, CD/DVD, and portable hard drives unless the COR allows their use for transfer of final closeout items. Any drives thus provided to the Government become US Government property.
1.5.D. Placing documents on an online management system (e.g. Owner Insite or ProjectWise) is unacceptable as a delivery method.
1.5.E. Direct delivery via drop off, US Postal Service, FedEx, UPS, etc. is acceptable.
1. No delivered boxes shall exceed 40 pounds.
1.5.F. Items are considered received when provided to USIBWC prior to 4:00 pm on a business day (COR's local time zone). Items received after 4:00 pm, or received on a non-business day, will be marked as being received on the next business day.
Delivery of Data to USIBWC January 29, 2026 00.70.00-Page 2 USIBWC Solicitation 191BWC26Bxxxx
1.5.G. During the last 2 weeks of the calendar year (i.e. December 16 through December 31), Contractor should expect longer than usual review times. Submittal reviews, RFI responses, answers to questions, and requests for meetings may not be accommodated during this time period. Contractor shall properly plan the submission of items or requests for meetings well in advance of this time period to avoid delays to their schedule due to unavailability of staff during this period.
1.5.H. Electronic files shall be provided in their native format (MSWord, Excel, Primavera, etc.) as well as Adobe pdf.
1. The entire filename shall not exceed 30 characters, excluding extension.
2. Filenames shall not contain periods (i.e. ".") except to separate the file extension.
3. All dates within the project documentation and in the filenames shall have years shown with four digits.
1.5.I. Document files shall not be "locked" or otherwise blocked from changes. If it is imperative that a document be password protected, the password shall be provided to USIBWC.
1.5.J. Hard copies shall not be provided in 3-ring binders (except for O&M manuals, if required). Large, lengthy hard copies shall be grouped in expandable folders. Folders shall not exceed 3.5 inches in width.
1.6. ADOBE PDF FILES
1.6.A. All reports, submittals, record documents, and other deliverables, unless specifically noted to use a different filetype in these Technical Specifications, shall be provided as pdf documents.
1.6.B. Whenever possible, files shall be saved/printed as pdfs instead of scanned as pdfs.
1. "Print" to pdf with a minimum resolution of 600 dpi, but 1200 or 2400 dpi is preferred for text documents.
1.6.C. Pdf files that contain form fields shall be "printed" to pdf prior to submittal to USIBWC. Printing the file to pdf locks the data and prevents the form field from being changed.
1. Pdfs shall include valid electronic signatures, or they shall be scans of the original documents.
a. Valid electronic signatures include digital signatures created through the pdf program or inserted scans of a true signature. By submitting an item using either of these items, the Contractor is certifying that the signature is valid.
1.6.D. Embed all fonts used in the pdf files.
1.6.E. Per USIBWC's "Drawing and CAD Standards" the minimum resolution for drawings generated from AutoCAD is 1200 dpi.
1.6.F. Color documents shall be scanned in color. NCR pages that are other than white (e.g. all yellow or all pink) are not considered color documents and shall be scanned in grayscale or black and white. Black and white is preferred.
1.6.G. The minimum scanning resolution shall be:
1. 400 dpi for color and grayscale
2. 600 dpi for black and white
1.6.H. Provide data/information within the pdf itself. Do not use "attachments" within a pdf file. Do not use a pdf portfolio.
1.6.I. Pdfs shall be sized at ANSI A (8 ½" x 11"), ANSI B (11" x 17"), or ANSI D (22" x 34") unless the original is another size, then the pdf shall be the size of the original document.
1.6.J. Reports and plans (e.g. Safety Plan, QC Plan, Stormwater Pollution Prevention Plan) provided to the Government as submittals shall be provided in pdfs with recognizable text (i.e. searchable pdf).
Recognizable text is searchable by character or words.
January 29, 2026 Delivery of Data to USIBWC USIBWC Solicitation 191BWC26Bxxxx 00.70.00-Page 3
1.6.K. The Contractor shall ensure that the electronic copy is legible.
1.7. IMAGE FILES
See Section 01.32.33 for requirements of photograph and video files.
Delivery of Data to USIBWC January 29, 2026 00.70.00-Page 4 USIBWC Solicitation 191BWC26Bxxxx
January 29, 2026 Project Data USIBWC Solicitation 191BWC26Bxxxx 00.70.13-Page 1
SECTION 00.70.13
PROJECT DATA
00.70.13 Project Data 00.70.13-Project Data
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. General
1.5. Definitions
1.6. Data First Produced in the Performance of this Contract
1.7. Data Not First Produced in the Performance of this Contract
1.8. Release and Use Restrictions
--End of Section--
1.2. REFERENCE STANDARDS
1.2.A. United States Code (USC)
1. 17 USC 401-402
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
1.4.A. The Government shall have unlimited rights in all data delivered under this Contract and in all data first produced in the performance of this Contract. The Government shall also have the right to limit assertion of copyright in data first produced in the performance of this Contract and to obtain assignment of copyright in that data. The Government has the right to limit the release and use of certain data.
1.4.B. All data, submittals, and pay estimates are required contractual documents and are in no way privileged nor confidential information. Contractor shall not state that these items are confidential business information nor state that they are not to be revealed to third parties with or without approval.
1.5. DEFINITIONS
1.5.A. "Data" means recorded information, regardless of form or the media on which it may be recorded. The term includes all technical data and testing data. The term does not include information incidental to Contract administration, such as financial, administrative, cost or pricing, management information, or computer software.
1. Data examples include, but are not limited to:
a. The production of audiovisual works, including motion pictures or television recordings with or without accompanying sound, or for the preparation of motion picture scripts, musical compositions, soundtracks, translation, adaptation, and the like.
b. Photographs, negatives, and slides.
c. Histories of the respective agencies, departments, services, or units thereof.
d. Surveys of Government establishments including any associated survey data and drawings produced from such surveys.
Project Data January 29, 2026 00.70.13-Page 2 USIBWC Solicitation 191BWC26Bxxxx
e. Works pertaining to the instruction or guidance of Government officers and employees in the discharge of their official duties.
f. The compilation of reports, books, studies, surveys, or similar documents.
g. The collection of data containing personally identifiable information such that the disclosure thereof would violate the right of privacy or publicity of the individual to whom the information relates.
h. Investigatory reports.
i. The development, accumulation, or compilation of data, the early release of which could prejudice follow-on acquisition activities or agency regulatory or enforcement activities.
j. Designs, models, reports, surveys, submittals, plans, specifications, and drawings.
k. Any other items provided in the performance of this Contract.
1.5.B. "Unlimited rights" means the rights of the Government to use, disclose, reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, in any manner and for any purpose, and to have or permit others to do so.
1.6. DATA FIRST PRODUCED IN THE PERFORMANCE OF THIS CONTRACT
1.6.A. The Contractor shall not assert or authorize others to assert any claim to copyright subsisting in any data first produced in the performance of this Contract without prior written permission of the Contracting Officer.
1.6.B. The Contractor grants to the Government, and others acting on its behalf, a paid-up, nonexclusive, irrevocable, worldwide license for all delivered data to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government.
1.7. DATA NOT FIRST PRODUCED IN THE PERFORMANCE OF THIS CONTRACT
The Contractor shall not, without prior written permission of the Contracting Officer, incorporate in data delivered under this Contract, any data not first produced in the performance of this Contract and that contain the copyright notice of 17 USC 401 or 402, unless the Contractor identifies such data and grants to the Government, or acquires on its behalf, a nonexclusive, irrevocable, worldwide license.
1.8. RELEASE…