This is an Asbestos and Lead-Based Paint Survey Report for the USIBWC Amistad Power Plant and Warehouse in Del Rio, Texas, submitted in response to Request for Proposal #12-05 under IDIQ Fixed Price Proposal Contract IBM09D0010. The survey was conducted on April 10-11, 2012, by TRC Environmental Corporation and documents the presence and location of asbestos-containing materials (ACM) and lead-based paint (LBP) within the facility.
The survey identified asbestos in six categories of materials within the Power Plant structure: vinyl sheet flooring (90% Chrysotile in 1,400 SF), roof parapet wall metal flashing caulking (5% Chrysotile in 850 SF), flange gaskets (90% Chrysotile), gasket materials on piping and equipment (80% Chrysotile), sink countertop materials, and metal slider door cores—all presumed or confirmed to contain asbestos. No asbestos was detected in the Warehouse building. For lead-based paint, the survey identified LBP concentrations exceeding the federal threshold of 1.0 mg/cm² in 23 components and fixtures throughout the Power Plant, including crane frames, elevator doors, metal handrails, cable trays, storage tanks, and piping systems, with readings ranging from 1.0 to greater than 9.9 mg/cm². The report includes detailed recommendations for management, abatement, and proper disposal of identified materials in compliance with OSHA, EPA, and RCRA regulations, along with comprehensive appendices containing laboratory analysis results, XRF field data sheets, sample location drawings, photographs of positive materials, and inspector certifications.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos & LeadPaint Survey Report
USIBWC Amistad Power Plant and Warehouse Del Rio, Texas
Request for Proposal (RFP) #12‐05
IDIQ Fixed Price Proposal Contract IBM09D0010
Prepared for:
U.S. International Boundary and Water Commission
4171 N. Mesa St., Suite C‐100 El Paso, Texas 79902‐1441
Submitted by:
505 East Huntland Drive, Suite 250
Austin, Texas 78752 Telephone: (512) 329-6080 Facsimile: (512) 343-1083
May 31, 2012
Asbestos and Lead-Based Paint Survey Report Page 1 IBWC Amistad Power Plant and Warehouse, Del Rio, TX May 31, 2012
Table of Contents
Executive Summary………………………………………………………………………………2
1.0 Introduction……………………………………………………………………………….4
2.0 Building Descriptions…………………………………………………………………..4
3.0 Background…………………………………………………………………………………5
4.0 Asbestos Findings…………………………………………………………………………6
4.1Asbestos Containing Materials
4.2 Negative Materials
4.3 Asbestos Recommendations
5.0 Lead-Based Paint Inspection………………………………………………………….9
5.1 Summary of Lead-Based Paint Testing Results
5.2 Lead-Based Paint Conclusions
5.3 Lead-Based Paint Recommendations
5.4 Lead-Based Paint General Recommendations
5.5 Waste Characterization Recommendations
6.0 Disclaimer……………………………………………………………………………………15
7.0 Signatory……………………………………………………………………………………..16
Appendices
Appendix A-Bulk Asbestos Sample laboratory Report
Appendix B-Lead-Based Paint XRF Field Data sheets
Appendix C-Sample Location Drawings
Appendix D-Photographs of Positive Materials
Appendix E-Inspector Certifications
Asbestos and Lead-Based Paint Survey Report Page 2
EXECUTIVE SUMMARY
TRC Environmental Corporation (TRC) was contracted by the United States International Boundary and Water Commission (IBWC) to conduct an asbestos and a lead-based paint survey at the Amistad Power Plant and Warehouse Building located at 670 Texas Spur 349, Del Rio, Texas. The asbestos survey comprised of surveying the accessible interior and exterior building materials at the Power Plant and the Warehouse buildings. The survey consisted of identification of suspect building materials, collection of bulk samples of suspect asbestos containing materials, material condition assessments, and laboratory analysis of samples collected. The lead-based paint survey comprised of the assessment and testing of painted surfaces using a X-ray Fluorescence (XRF) Lead spectrum analyzer for the detection of lead based paint. The survey was performed on April 10- 11, 2012 by Mr. Sam Seneviratne, and assisted by Mr.
Hector Gonzalez.
Asbestos Findings Results of the asbestos survey indicated the presence of detectable asbestos in the following materials:
Power Plant
Vinyl Sheet Flooring Blue, Green and White Square Pattern-Office Areas on the 4th Floor and Employee Lunch room, Locker room, and Toilets on the 3rd Floor- 90% Chrysotile
Roof Parapet Wall Metal Flashing Caulking- Upper and Lower Roofs-5% Chrysotile
Flange Gasket-1st Floor Chemical Storage Tank Side Flange-90% Chrysotile Gasket Materials-3rd Floor Mezzanine Parts Storage Area-80% Chrysotile Sink Countertop-4th, Floor Battery Room- Assumed to Contain Asbestos Gray-Metal Slider Door Core-1st Floor Chemical Storage- Assumed to Contain
Asbestos
Warehouse Building No asbestos materials found.
Lead-Based Paint Findings The results of the lead-based paint investigation indicates that some of the painted components and fixtures tested in the Power Plant structure were found to contain lead at concentrations above the Federal lead-based paint level of 1.0 milligram per square centimeter (mg/cm²), as identified by XRF analyzer.
Power Plant
Black-Metal Gantry Crane Frame and Platform-Exterior Southwest Beige-Metal Elevator Door Frame on floors 1 thru 4 White-Glazed Metal Sink-Custodian Closet 4th and 3rd, floors Orange-Metal Powerhouse Crane Frame, 20 and 125 Ton Hooks-Erection Floor Cream-Metal Cable Tray and Support-Exterior North side Yellow-Metal Flammable Storage Cabinet- Exterior North side Yellow-Metal 2 ton Crane Boom- 3rd Floor Machine Shop
Asbestos and Lead-Based Paint Survey Report Page 3
Black-Metal-Handrail-3rd, Floor Parts Storage Area Yellow-Concrete Floor stripping-3rd Floor Elevator lobby Black-Metal Elevator Gate 1st, thru 4th, floors Red-Metal Hitachi Tool Rack-Generator Bay Blue-Metal Step and Riser-Stairs to Turbine Pit from Generator Bay Blue-Metal Wall-Inside Turbine Pit Blue-Metal Servo Linkage- Inside Turbine Pit Gray-Metal Shim-Upper Roof Parapet wall flashing fastener Gray-Metal Slider Door-1st Floor Chemical Storage area Gray-Metal Clean Oil Storage Tank 1st Floor Chemical Storage area Gray-Metal Dirty Oil Storage Tank 1st Floor Chemical Storage area Gray-Metal Spiral Case and Access Hatch 1st Floor Piping Gallery Black-Metal Handrail-Stairs to Penstock Gallery Green-Metal Piping-Penstock Drain/Fill #2 Gray-Metal Draft Tube and Access Hatch-Penstock Gallery
No lead-based paint found
Asbestos and Lead-Based Paint Survey Report Page 4
1.0 Introduction
TRC Environmental Corporation (TRC) was contracted by the United States International Boundary and Water Commission (IBWC) to conduct an asbestos and a lead based paint survey at the Amistad Power Plant and Warehouse Building located at 670 Texas Spur 349, Del Rio, Texas. The survey was performed on April 10-11, 2012, by Mr. Sam Seneviratne, and Mr. Hector Gonzalez, both EPA Accredited AHERA Asbestos Building inspectors and EPA Lead Inspectors employed by TRC. The survey included the inspection and assessment of accessible interior and exterior construction materials associated with the building structures on site.
The asbestos and lead-based paint survey findings will be used to effectively manage asbestos-containing materials (ACM) and Lead-Based Paint (LBP) in the scope areas of the Power Plant and Warehouse building structures (the “Site”). The accumulated assessment information may be used in operations and maintenance plans for the facility designed to prevent accidental disturbance to ACM and LBP.
2.0 Building Descriptions
The following provides a summary of the Power Plant Building and Warehouse Building areas defined as the scope of work areas under Contract # IBM09D0010. Both of the building structures are located on federal land, were considered non-public buildings, are secured by fencing/locked gates, and have industrial processes. A description of the building structures are as follows:
Power Plant Structure: This is a 27,786 Square foot of building, built of concrete with steel framed roof. This building has four levels. The top level (Elevation 930 or 4th Floor) has offices, switchgear rooms, and an HVAC fan room. The 4th floor is actually at ground level as you enter the building from the roadway. The 3rd level (Elevation 910, down one level from the 4th floor) houses the maintenance shops, parts room, lunch room and restrooms. The 2nd level (elevation 891) houses the control panels, the Turbine room, and pump area. The 1st level (elevation 876) houses the oil room, compressors, and piping galleries.
Warehouse: The warehouse building is located just east of the dam up-gradient from the power plant. The building is of metal frame construction built slab on grade with metal panel siding and metal panel roof. The main storage area of the warehouse is unfinished with concrete floors and the metal siding/roofing. The southern portion of the building has a meeting/conference room a kitchen, two offices, restrooms, and a small closet/storage area. The warehouse comprises approximately 10,200 square feet of area and is single-story with a high ceiling/roof.
Asbestos and Lead-Based Paint Survey Report Page 5
3.0 Background
Asbestos Containing Materials
The Occupational Safety and Health Administration (OSHA) and the Environmental Protection Agency (EPA) define an asbestos-containing material (ACM) as any material containing more than one percent (>1.0%) asbestos by weight. In addition, ACM are designated by the EPA into one of three characteristic categories as follows:
• Friable asbestos - material which can be crumbled, pulverized or reduced to powder by hand pressure, a.k.a. Regulated Asbestos Containing Materials
(RACM)
• Category I Non-friable - includes resilient floor coverings, asphalt roofing products, gaskets and packing. These materials may become friable if degraded or damaged to the point where the material can be crumbled, pulverized or reduced to powder by hand pressure.
• Category II Non-friable - any non-friable ACM that is not in Category I (i.e.
Asbestos-cement (Transite®) siding or roofing mastics).
Asbestos Sampling and Analytical Procedures
Representative bulk samples of suspect asbestos-containing building materials were randomly collected from the identified homogenous building material applications.
Homogenous material determination was based on the following criteria:
• Similar physical characteristics (same appearance, age, color and texture, etc.),
• Application (e.g. sprayed or trowel-on, assembly into a system, etc.),
• Material function (e.g. thermal insulation, floor tile, wallboard system, etc.).
Laboratory services were provided by TRC’s laboratory located in Windsor, Connecticut.
TRC’s analytical laboratory is a National Voluntary Laboratory Accreditation Program (NVLAP) certified laboratory (NVLAP code # 101424-0).
Bulk samples were analyzed by polarized light microscopy (PLM) utilizing the EPA’s Test Methods: Methods for the Determination of Asbestos in Bulk Building Materials (EPA 600/R-93/116, July 1993) and the McCrone Research Institute’s The Asbestos Particle Atlas as method references.
Analysis by PLM was performed by visual observation of the bulk sample and by microscopic analysis using dispersion staining PLM methodology. The samples were analyzed for asbestiform minerals (Chrysotile, Amosite, Crocidolite, Anthophyllite, Actinolite, and Tremolite), fibrous non-asbestos constituents (mineral wool, cellulose, etc.) and non-fibrous constituents. Using a stereoscope, the microscopist visually estimates the relative amounts of each constituent by determining the estimated area of the asbestos compared with the area estimate of the total sample.
Asbestos and Lead-Based Paint Survey Report Page 6
4.0 Asbestos Findings
Suspect Asbestos-Containing Materials (ACM), including building materials/finishes, insulated wire, and equipment/machinery components, e.g., gaskets, packing, dampening materials and insulation were inspected, sampled and analyzed for asbestos.
Typical suspect building materials include finishes (e.g. drywall systems, suspended ceiling panels, glued ceiling tiles, floor tiles, vinyl sheet flooring, floor finish adhesives, cove base, cove base adhesive, textured coatings, roofing materials, caulks, sealants, and plasters. Non-suspect asbestos materials are items purely composed of glass, metal, concrete, rubber, brick, ceramic, grouts, fiberglass, foam, Styrofoam, and paper.
According to federal regulations, regulated ACM are ACMs containing greater than 1% asbestos by weight.
4.1 Asbestos Containing Materials (>1%)
Asbestos was either detected in concentrations exceeding one percent in the following materials sampled during the asbestos survey or the listed component/materials was presumed to have asbestos, based on limitations of sampling feasibility. Results of the asbestos survey indicated the presence of detectable asbestos in the following materials:
Power Plant
Material Location Percentage/
Type Approx
Quantity*
NESHAP
Category
Condition
Vinyl Sheet Flooring (Blue, Green and White Square Pattern)
Power Plant-4th Floor Office Areas and 3rd Floor Employee Lunch room, Locker room and Toilets
90% Chrysotile
1,400 SF RACM Poor
Roof Parapet Wall Metal Flashing Caulking White
Power Plant – Upper and Lower
Roofs
5% Chrysotile
850 SF CAT II Poor
Flange Gasket
Power Plant 1st Floor Chemical
Storage Tank Side Flange
90% Chrysotile
40 Linear Feet
CAT I Good
Gasket Materials Power Plant 3rd
Floor Mezzanine Parts Storage Area
80% Chrysotile
200 SF CAT I Good
Various Flange and Valve Gasket
On Piping and Equipment on
Floors 1-4 Power Plant
Presumed to Contain Asbestos
1,000 LF CAT I Good
Sink Countertop Power Plant 4th, Floor Battery Room
Presumed to Contain Asbestos
25 SF CAT II Good
Gray Metal Slider Door core
1st Floor Chemical Storage Area
Presumed to Contain Asbestos
200 SF CAT II Good
Asbestos and Lead-Based Paint Survey Report Page 7
*Estimated quantities of ACMs listed are provided as a guide to the building owner. The material quantities listed in the table are approximations and TRC is not responsible for the accuracy of the quantities and measurements provided.
Material Location Percentage/Ty pe Approx
Quantity
NESHAP
Category
Asbestos was not detected in any of the sampled materials
4.2 Negative Materials
Samples of the following suspect materials were collected in the locations noted below and were reported with no detectable asbestos, as indicated by laboratory PLM analysis:
Negative Materials
Material Sample Locations
2’ x 2’ Drop Ceiling Panels Maintenance/Tool Storage, Supervisor & Records Office, Hallways and Electrical Room
Duct Sealant Caulk (White) Maintenance/Tool Storage, Supervisor & records Office, Hallways, Electrical Room and
HVAC room 4" Cove Base (Black) & Associated Mastic
(Brown) Maintenance/Tool Storage, Supervisor &
Records Office, Hallways, Electrical Room and 3rd Floor Employee Lunch room, Wall board & Joint Compound Maintenance/Tool Storage, Supervisor & records Office, Hallways, Electrical Room and 3rd Floor Employee Lunch room, Locker room and Toilets Vinyl Sheet Floor Mastic (Brown) 4th Floor Office Areas and 3rd Floor Employee
Lunch room, Locker room and Toilets Ceramic Tile (Green) and Grout (Gray) 4th, and 3rd Floor Restrooms
Textured Paint Walls of the Erection Floor Wall Texture Coat Walls of the Erection Floor
Concrete Panel and Block Wall Caulk Interior and exterior walls and roof Pipe Insulation Glue/ Mastic Pipe Insulation on exterior north side and interior floors 1-4 Duct Insulation Paper And Glue 4th Floor HVAC room
Roof Mastic Sealant (Black & with Silver Paint)
Upper and lower roofs, Parapet walls
Poured in place Concrete walls Roof parapets and exterior walls Mastic at Roof Penetrations Lower roof penetrations
Fiberglass Pipe Insulation end cap caulk 4th floor, HVAC room, 3rd Floor Maintenance Shop & 2nd Floor Turbine room
Electric Wire Insulation-various colors 3rd Floor Mezzanine storage area 9" OD Gaskets 2nd Floor Turbine room
Asbestos and Lead-Based Paint Survey Report Page 8
Negative Materials
Material Sample Locations
Interior Panel Insulation Metal roof and walls 12" Floor Tile (Tan with white and gray specks) and Mastic (Yellow) Conference room floor
4" Cove Base (Black) & Associated Mastic (Dark Brown)
Conference room walls
Wall board & Joint Compound Conference room and offices Floor leveling /filler compound (Brown) Storage room under floor tile
2’ x 2’ Drop Ceiling Panels Conference room and offices Roof Sealant on metal seams Warehouse roof
4.3 Asbestos Recommendations
Results of bulk sample analysis confirmed that asbestos was identified in regulated concentrations within some of the building materials sampled. The ACM was found to be in fair to good condition at the time of the inspection. If damaged ACM is encountered, it should be repaired, encapsulated, or removed as soon as feasible.
Access to the damaged ACM by building occupants should be restricted in the areas of damage until abatement response actions can be completed. Such abatement methods should be performed by a qualified/licensed asbestos abatement contractor, and ACM should be handled, stored, and disposed of according to all local, state, and federal regulations.
Persons performing construction or maintenance work in the Site should be aware of the types and locations of ACM and that additional materials (not identified in this report), which are either inaccessible or hidden, may exist at the Site. Care should be used when performing work that disturbs building materials. Any suspect asbestos containing materials uncovered during maintenance, renovation, or demolition activities that are not addressed in this inspection report, or presumed asbestos containing materials (e.g. fire doors with asbestos laden cores), must be sampled by an accredited asbestos inspector prior to disturbance, or they must otherwise be assumed and treated as asbestos containing.
Asbestos and Lead-Based Paint Survey Report Page 9
5.0 Lead-Based Paint Inspection
TRC conducted a lead-based paint (LBP) inspection for the determination of LBP and/or lead-based components at the Power Plant and Warehouse building structures (the “Site”). The LBP inspection was conducted in accordance with the United States Housing and Urban Development (HUD) guidance document, entitled “Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing,” 1997 Revision.
The general purpose of this investigation was to document the general condition of interior and exterior painted building surfaces and to characterize the composition of painted surfaces with regard to lead content. Information derived from this investigation may be used to further refine the scope of LBP abatement activities in support of future procurement activities and to establish baseline conditions for other portions of the property with regard to LBP. The scope of work associated with this investigation included the following elements:
• Visual inspection of interior and exterior building painted surfaces and components and
• Field testing of painted surfaces and components using an X-Ray Fluorescence (XRF) analyzer
The lead based paint testing was conducted by Sam Seneviratne, an EPA; Department of Housing and Urban Development (HUD) certified Lead-Based Paint Building Inspector/Assessor, Project Monitor. The inspection was conducted on April 10 and 11, 2012. Assistance was provided by Hector Gonzalez, an EPA/HUD Lead-Based Paint Sampling Technician.
Definition of Lead-Based Paint
The United States Department of Housing and Urban Development (HUD), and United States Environmental Protection Agency define lead-based paint as a paint or other surface coatings that contain an amount of lead equal to, or in excess of:
• One milligram per square centimeter (1.0 mg/cm2); or
• One-half of one percent (0.5%) by weight.
Sampling and Analytical Procedures
All lead-based paint testing was performed using a RMD Model LPA-1B, X-ray Fluorescence (XRF) spectrum analyzer, serial #1124. Assessment activities and XRF testing were performed in accordance with the United States HUD guidance document, entitled “Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing,” 1997 Revision.
The RMD Model LPA-1B XRF uses a 12 milicurie Cobalt 57 sealed radioactive source which has a half life of 18 months. The XRF measures the L & K electron shell energy released by the excited atoms of the test material such as the painted and/or coated surface location to calculate the concentrations of a specific metal on the surface coating
Asbestos and Lead-Based Paint Survey Report Page 10 down to the substrate. The RMD Model LPA-1B XRF does not have an inconclusive range such as the older generation XRF machines.
At the beginning and end of each work day and at various times during the day, the XRF was calibrated in order to ensure that the instrument was functioning properly. A series of three calibrated readings were obtained using a 1.9 mg/cm2 NIST Paint Film Standard in accordance with the instrument manufacturer’s protocol. In all cases, the instrument was functioning within the standard deviation as defined by the manufacturer and the Performance Characteristic Sheets. All validation readings were recorded in a logbook, which accompanies the instrument. A total of fifteen calibration tests were performed during the course of this investigation.
During this investigation, a total of one-hundred and seventy six (176) painted or coated substrate measurements were obtained using the XRF. The XRF field test data sheets with the results of the paint test measurements are presented in Appendix B-Lead- Based Paint XRF Field Data sheets.
5.1 Summary of Lead-Based Paint Testing Results
The XRF test results indicate that select painted surfaces and building components were found to be containing lead above the United States Department of Housing and Urban Development, and United States Environmental Protection Agency definition of lead-based paint. A summary of paints/coatings determined to be LBP by XRF analysis is provided below:
Component(s) Color Location(s) Lead XRF
Result (mg/cm²)
Approximate Quantity
Paint Condition
Metal Gantry Crane Frame and Platform
Black Exterior Southwest 3.0 to 2.4 400 SF Poor
Metal Elevator Door Frame
Beige Floors 1 thru 4 4.0-7.5 4 Doors x 20 SF each
Intact
Glazed Metal Custodian sink
White Custodian Closets 4th and 3rd, floors
>9.9 2 sinks Intact
Metal Powerhouse Crane Frame, and 20 &
125 Ton Hook Orange Erection Floor 4.2
1,500 SF
(Crane)
50 SF (Hooks) Intact
Metal Cable Tray Support
Cream Exterior North side >9.9 6,000 SF Fair
Metal Flammable Storage Cabinet
Yellow Exterior North side 1.2 50 SF Poor
Metal 2 ton Crane Boom
Yellow Machine Shop >9.9 20 SF Intact
Metal-Handrail Black 3rd, Floor Parts
Storage
2.1 100 SF Poor
Concrete Floor stripping
Yellow 3rd Floor Elevator lobby
2.9 16 SF Poor
Metal Elevator Gate Black 1st,-4th Floors- Elevator Door
1.0 200 SF Intact
Metal Tool Rack Red Generator Bay Hitachi Tool Rack
9.8 60 SF Intact
Asbestos and Lead-Based Paint Survey Report Page 11
Result (mg/cm²)
Approximate Quantity
Paint Condition
Metal Step and Riser Blue Stairs to Turbine Pit from Generator Bay >9.9 160 SF Intact
Metal Wall Blue Inside Turbine Pit >9.9 600 SF Intact
Metal Servo Linkage Blue Inside Turbine Pit >9.9 1,000 SF Intact
Metal Shim Gray Upper Roof Parapet
Wall Flashing fastener
>9.9 40 SF Poor
Metal Slider Door Gray 1st Floor Chemical
Storage >9.9 200 SF Intact
Metal Clean Oil Storage Tank
Gray 1st Floor Chemical
Storage >9.9 300.SF Intact
Metal Dirty Oil Storage Tank
Gray 1st Floor Chemical
Storage
9.2 300 SF Intact
Metal Spiral Case and Access
Gray Floor Piping Gallery >9.9-7.1 12,000 SF Intact
Metal Handrail Black Stairs to Penstock Gallery
2.1 60 LF Intact
Metal Piping Green Penstock Drain/Fill #2
2.3 150 SF Intact
Metal Draft Tube Gray Penstock Gallery >9.9 10.000 Sf Poor
Metal Access Hatch to Draft Tube- Gray Penstock Gallery 3.2 16 SF Poor
Result (mg/cm²)
Approx.
Quantity
Condition
Lead-based paint components were not found in the Warehouse building.
5.2 Lead-Based Paint Conclusions
Visual assessment of the lead-based paint identified in the Power Plant building identified painted surfaces in conditions other than “intact” in multiple areas of the interior and/or exterior of the buildings. The lead paint in poor condition (i.e., less than intact) must be stabilized or abated prior to demolition or repainting activities to prevent environmental contamination and worker exposure from lead paint.
Asbestos and Lead-Based Paint Survey Report Page 12
5.3 Lead-Based Paint Recommendations
Disturbance of lead based paint should be performed by a contractor who has experience and expertise in LBP, abatement, handling and disposal and who can protect the employees of IBWC Amistad Power Plant, and the environment from lead exposure hazards. For construction work where an employee may be occupationally exposed to lead in any amount, the workers and contractor must comply with Federal Occupational Safety and Health (OSHA) worker lead exposure regulations 29 CFR 1910.1025 and
1926.62 (lead in construction). Additionally, lead containing waste must be characterized and profiled for proper disposal according to applicable federal State and local regulations.
TRC recommends that interior and exterior painted surfaces containing lead at concentrations greater than or equal to 1.0. Mg/cm2 and that are in poor condition be abated and/or stabilized. Based on the results of this assessment, the following materials meet the criteria for abatement and/or stabilization:
Result (mg/cm²)
Approximate Quantity
Condition
Metal Gantry Crane Frame and Platform
Black Exterior Southwest 3.0 to 2.4 400 SF Poor
Metal Flammable
Storage Cabinet Yellow Exterior North side 1.2 50 SF Poor
Metal-Handrail Black 3rd, Floor Parts Storage 2.1 100 SF Poor
Concrete Floor stripping
Yellow 3rd Floor Elevator lobby 2.9 16 SF Poor
Metal Shim Gray Upper Roof Parapet Wall
Flashing fastener >9.9 40 SF Poor
Metal Draft Tube
Gray Penstock Gallery >9.9 10,000 SF Poor
Metal Access Hatch to Draft
Tube- Gray Penstock Gallery 3.2 16 SF Poor
5.4 Lead-Based Paint General Recommendations
Lead is a hazardous substance and its condition, handling and disposal are regulated by Federal, State and local agencies. Lead-containing materials, Lead-based paint, and Lead-Containing Paint generally do not pose a health risk unless the material is disturbed or sufficiently deteriorated to produce dust, which may become airborne and inhaled or ingested. Future site maintenance activities, including surface preparation and painting, may involve practices that could disturb lead-containing materials. The following paragraphs provide a general overview of applicable regulatory standards that relate to the management and/or disposal of lead-based paint:
Asbestos and Lead-Based Paint Survey Report Page 13
• The Federal Occupational Safety and Health (OSHA) 29 CFR 1910.1025 and
1926.62 (lead in construction) do not provide a definition for “lead-based paint”.
Rather, the Lead Construction Standard provides a Permissible Exposure Limit (PEL) for worker exposure to airborne lead particles of 50 micrograms per cubic meter of air (50 µg/m3 for an 8-hour time-weighted average). All employees (workers) and supervisors, who are engaged in lead-related construction activities and shown to be exposed to lead at or above the Permissible Exposure Limit, shall be trained by state-accredited training providers and certified by the Environmental Protection Agency. The OSHA Lead in Construction Standard states that “negative” readings i.e. those below the HUD/EPA definition of what constitutes LBP (1.0 mg/cm2), “DO NOT” relieve contractors from performing exposure assessments (personal exposure monitoring) on their employees per the OSHA Lead Standard, and should not be interpreted as lead is not present.
Although a reading may indicate “negative” result or lead concentration, concentrations of airborne lead may still exceed the OSHA Action Level or the OSHA Permissible Exposure Limit (PEL) depending on the work activity.
• Future site maintenance activities, including repair, surface preparation and painting, sand/shot blasting, and sanding, in areas where lead-based paint has been identified may result in the liberation of lead at concentrations in excess of the OSHA PEL. TRC recommends the removal and/or stabilization of building materials during planned renovation. Lead-based painted materials should only be removed, handled or stabilized by lead trained personnel in accordance with all applicable federal, state, and local regulations. These requirements include, but are not limited to, the following: Exposure Assessments; Methods of Compliance including work practices, administrative, and engineering controls;
Respiratory Protection; Protective Clothing and Equipment; Housekeeping;
Hygiene Facilities; Medical Surveillance; and Employee Information and Training. The waste materials generated must be segregated accordingly and must be subjected to waste characterization testing and disposed of according to applicable regulations.
• Lead containing waste must be disposed of in accordance with all applicable federal, state, county or local regulations and guidelines. It is the sole responsibility of the Contractor to assure compliance with all laws and regulations relating to the disposal. The abatement contractor should comply with the requirements of the Resource Conservation and Recovery Act (RCRA).
Waste materials shall be segregated into separate waste streams (i.e. paint chips, personal protective equipment, plastic, etc.) and placed into labeled, leak-tight containers. Wastewater from the washing facilities should be captured, filtered, and sampled for lead content prior to disposal into the sanitary sewer system.
Additional details regarding waste characterization sampling and analysis are provided in the following section.
5.5 Waste Characterization Recommendations
Wastes that are generated during demolition and/or building maintenance activities may contain concentrations of lead that would render the waste material as a hazardous waste. In order to determine whether the wastes are to be classified as non-hazardous
Asbestos and Lead-Based Paint Survey Report Page 14 solid or hazardous waste as defined by the RCRA, a Toxic Characterization Leaching Procedure (TCLP) test must be performed. If any of the waste characterization test samples are at or above the 5.0 mg/liter threshold criteria, the Contractor shall dispose of the waste material as hazardous waste.
The contractor should check in advance with the intended landfill to inquire about the testing requirements of that landfill. Testing for other hazards may be required.
Segregation of waste materials and representative characterization analysis for the disposal of wastes as provided herein shall be the responsibility and be required of the Contractor.
Asbestos and Lead-Based Paint Survey Report Page 15
6.0 DISCLAIMER
The content presented in this report is based on data collected during the site inspection and survey, review of pertinent regulations, requirements, guidelines and commonly followed industry standards, and information provided (if any) by the property owner, their clients, agents, and representatives.
The work has been conducted in an objective and unbiased manner and in accordance with generally accepted professional practice for this type of work. TRC believes the data and analysis to be accurate and relevant, but cannot accept responsibility for the accuracy or completeness of available documentation or possible withholding of information of other parties. Structures or components thereof surveyed may contain hidden surfaces or materials requiring destructive access to inspect and/or sample. It is possible that additional materials could be discovered during destructive or demolition activities. In the event additional materials (not identified herein) are discovered during such activities, additional investigation and sampling may be necessary.
This asbestos survey and lead-based paint inspection report is designed to aid the property owner, architect, construction manager, general contractor, and asbestos or LBP abatement contractor in locating ACM and/or LBP . This report is not intended for, and may not be utilized as, a bidding document or as an abatement project specification document.
Asbestos and Lead-Based Paint Survey Report Page 16
7.0 SIGNATORY
This asbestos and lead-based paint survey activities and report of the findings were provided by TRC, was conducted by a licensed professional, experienced in the inspection and survey for asbestos containing materials and lead-based paint in building structures and associated components thereof. If there are any questions concerning information contained in this report, you may contact one of the undersigned in our Irvine, California office, phone # 949.727.9336.
Sincerely, TRC Environmental Corporation
Sam Seneviratne, CAC, REA Douglas W. Coburn, CAC, REA Project Manager Senior Project Manager AHERA Building Inspector Certification # 211-206-BIR Exp: December 8, 2012
Appendix A
Bulk Asbestos Sample Laboratory Analytical Report
And Chain of Custody
40714 USIBWC (2).doc
TRC LABORATORY ASBESTOS ANALYTICAL ACCREDITATIONS
NVLAP Lab Code 101424-0 AIHA #100122 CT #PH-0426 ME LA-0075, LB-0071 MA #AA000052 NY #10980 WV# LT000356 RI #AAL-007C3 TX #300354 VT #AL014538 VA #3333 000283 AZ #A20944 HI #L-09-004 NJ #CT004 CA #10275CA
Industrial Hygiene Laboratory
21 Griffin Road North Windsor, CT 06095
(860) 298-6308
BULK ASBESTOS ANALYSIS REPORT
CLIENT: U.S. International Boundary & Water Company
Site: Amistad Power Plant, 670 Texas Spur 349, Del Rio, TX Lab Log #: 40714 Project #: 192271.0000.0000 Date Received: 05/03/12 Date Analyzed: 05/03/12
RESULTS
Sample No. Color Homogeneous Multi- Layered
Layer No. Other Matrix Mat’ls Asbestos
% Asbestos Type
74 White Yes No -- 90% synthetic ND None
75 Black Yes No -- -- 90% Chrysotile
Reporting limit- asbestos present at 1% ND - asbestos was not detected Trace- asbestos was observed at level of less than 1%
Note: Polarized-light microscopy is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials.
In those cases, negative results must be confirmed by quantitative transmission electron microscopy.
The Laboratory at TRC follows the EPA's Interim Method for the Determination of Asbestos in Bulk Insulation (1982), and the EPA recommended Method for the Determination of Asbestos in Bulk Building Materials (EPA/600/R-93/116), July 1993, R.L. Perkins and B.W. Harvey which utilizes polarized light microscopy (PLM). Our analysts have completed an accredited course in asbestos identification. TRC's Laboratory is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), for Bulk Asbestos Fiber Analysis, NVLAP Code 18/A01, effective through June 30, 2012. TRC is an American Industrial Hygiene Association (AIHA) accredited lab for PLM effective through October 1, 2012. Asbestos content is determined by visual estimate unless otherwise indicated. Quality Control is performed in-house on at least 10% of samples and the QC data related to the samples is available upon written request from the client.
This report shall not be reproduced, except in full, without the written approval of TRC. This report must not be used by the client to claim product endorsement by NVLAP or any agency of the U.S. Government. This report relates only to the items tested.
Analyzed by __________________________________ Kathleen Williamson, Laboratory Manager
Reviewed by __________________________________ Kathleen Williamson, Laboratory Manager or other approved signatory
Date Issued: ____________________
Appendix B
Lead-Based Paint XRF Field Data Sheets
Appendix C
Sample Location Drawings
IBWCIBWCIBWC - AmistadAmistadAmistad PowerPowerPower PlantPlantPlant Floor 1
Asbestos Sample Location Diagram
IBWC - Amistad Power Plant Floor 2
Asbestos Sample Location Diagram
72 82 83
Floor 3
Asbestos Sample Location Diagram
21, 27, 73, 74, 75, 76, 77, 78, 79, 80, 81
- ACM Vinyl Sheet Flooring
IBWCIBWCIBWC - A i dA i t dAmistad PPPower PlPl tPlant Floor 4
Asbestos Sample Location Diagram
7, 666666
8, 9,999999
13, 1616161616161611141414414, 15, 18188181818
19,,,, 20, 25, 26, 31, 32, 333333333333 ,, 363666663
400040404 , 4141414141,, 4444422222222,,, 4444555
- ACM Vinyl Sheet Flooring
Roof
Asbestos Sample Location Diagram
4644 , 474747444 , 4844444 , 49, 50555 , 515 52
55, 5656, 5777, 60006000
63 64 65
6666666666
KSwindle Rectangle
KSwindle Text Box IBWC - Amistad Power Plant Warehouse Asbestos Sample Location Diagram
KSwindle Line
KSwindle Text Box North
KSwindle Callout
KSwindle Callout
KSwindle Callout
KSwindle Callout 89, 92
KSwindle Callout 90, 93
KSwindle Callout 91, 94
KSwindle Callout 97, 100
KSwindle Callout 95, 98
KSwindle Callout 96, 99
KSwindle Callout 101, 104
KSwindle Callout 102, 105
KSwindle Callout 103, 106
KSwindle Callout 107, 108, 109
KSwindle Callout
KSwindle Callout
KSwindle Callout
KSwindle Text Box Mezzanine Storage
IBWCIBWCIBWC --- AmistadAmistadAmistad PowerPowerPower PlantPlantPlant Floor 1
Lead Sample Location Diagram
137137 138138 139139 140140
1444146
147148149
155156 157158
160161162 163164
165 166
Floor 2
Lead Sample Location Diagram
115116
117118
119120 121122
124 125 126
127128
Floor 3
Lead Sample Location Diagram
88 89
97777 98 99
1010101010111 0 101 102
103103
105 106
107 108109 110 111
IBWCIBWCIBWC - A i t dA i t dAmistad PPPower Pl tPl tPlant Floor 4
Lead Sample Location Diagram
7 89 5
13 14 15 16, 17 18 19 20
2222222222
26272222288
300031 33322222 33333
33333334444444444444444
3553333
38888888
399999939393333340
45454444444
466664
50050555
515151115151
535455555555555555656577 55555555558
4040404444444444040
5999959999
777777776666666
79 80818283 84
Roof
Lead Sample Location Diagram
Generator Bay Transverse Section Plan
Lead Sample Location Diagram
Crane
66, 68, 70, IBBWCW - Amistad
Warehouse
Lead Sample Location Diagram
North
Mezzanine Storage
173 174 175
177, 179, Appendix D
Photographs of Positive Materials
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
1. ACM-Vinyl Sheet Flooring Blue, Green and White Square Pattern 2. ACM-Roof Parapet Wall Metal Flashing Caulking
3. ACM-Flange Gasket-1st Floor Chemical Storage Tank Side Flange 4. ACM-Gasket Materials-3rd Floor Mezzanine Parts Storage Area
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
5. Assumed ACM-Sink Countertop-4th, Floor Battery Room 6. LBP- Gantry Crane Frame and Platform-Exterior Southwest
7. LBP Elevator Door frame 8. LBP-Powerhouse Crane Frame, 20 and 125 Ton Hooks
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
9. LBP-Cable Tray and Support 10. LBP-Flammable Storage Cabinet
11. LBP-2 ton Crane Boom- 12. LBP-Glazed Metal Custodian Sink
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
13. LBP-Handrail-3rd, Floor Parts Storage 14. LBP-Concrete Floor stripping
15. LBP-Elevator Gate 1st, thru 4th, floors 16. LBP-Hitachi Tool Rack-Generator Bay
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
17. LBP-Step and Riser-Stairs to Turbine Pit 18. LBP-Wall-Inside Turbine Pit
19. LBP-Servo Linkage- Inside Turbine Pit 20. LBP-Metal Shim-Upper Roof Parapet wall flashing fastener
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
21. Assumed ACM & LBP-Slider Door-1st Floor Chemical Storage area
22. LBP-Clean and Dirty Oil Storage Tanks Chemical Storage area
23. LBP-Spiral Case Access 1st Floor Piping Gallery 24. LBP-Stair Handrail to Penstock Gallery
US IBWC-Amistad Power Plant, Del Rio, TX TRC Project Number 192271 Site Visit Date April 10 & 11, 2012
25. LBP-Piping-Penstock Drain/Fill #2 26. LBP-Draft Tube And Access Hatch-Penstock Gallery
Appendix E
Inspector Certifications
Lead-Related Constructbn
Certif'rcate
Ccrtific*e Tvp
Exfiiration Date state of carifsin*r Dcpntment of Public FteaFh t'//'-
State of California Division of Occupational Safety and Health
Certified Site Surveillance Technician
Hector E Gonzalez Name
Certification No. 064072
Expires on 09120112
This certification was issued by the Division of
Occupational Safety and Health as authorized by
Sections 7180 et seq. of the Business and
Professions Code, sjgffiTffiffifran ffix
'0#
| Amistad Power Plant Asb + Lead Survey Report _Final_ |
| Amistad Power Plant Asb + Lead Survey Report _Final |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Amistad Power Plant Draft Asb & Lead Survey Report |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| 40603 USIBWC Asbestos bulk results |
| 40714 USIBWC _2_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Lead-Based Paint XRF Field Data Sheet |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| ALL Asbestos Sample Location Diagram - Flattened |
| ALL Lead Sample Location Diagram - Flattened |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Photo log ACM LBP _DWC_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Sam's Certs Exp 2013 |
| Hector Gonzales CSST and LEAD |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Amistad Power Plant Draft Asb & Lead Survey Report |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| 40603 USIBWC Asbestos bulk results |
| 40714 USIBWC _2_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Lead-Based Paint XRF Field Data Sheet |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| ALL Asbestos Sample Location Diagram - Flattened |
| ALL Lead Sample Location Diagram - Flattened |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Photo log ACM LBP _DWC_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Sam's Certs Exp 2013 |
| Hector Gonzales CSST and LEAD |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Amistad Power Plant Draft Asb & Lead Survey Report |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| 40603 USIBWC Asbestos bulk results |
| 40714 USIBWC _2_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Lead-Based Paint XRF Field Data Sheet |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| ALL Asbestos Sample Location Diagram - Flattened |
| ALL Lead Sample Location Diagram - Flattened |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Photo log ACM LBP _DWC_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Sam's Certs Exp 2013 |
| Hector Gonzales CSST and LEAD |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Amistad Power Plant Draft Asb & Lead Survey Report |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| 40603 USIBWC Asbestos bulk results |
| 40714 USIBWC _2_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Lead-Based Paint XRF Field Data Sheet |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| ALL Asbestos Sample Location Diagram - Flattened |
| ALL Lead Sample Location Diagram - Flattened |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Photo log ACM LBP _DWC_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Sam's Certs Exp 2013 |
| Hector Gonzales CSST and LEAD |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Amistad Power Plant Draft Asb & Lead Survey Report |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| 40603 USIBWC Asbestos bulk results |
| 40714 USIBWC _2_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Lead-Based Paint XRF Field Data Sheet |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| ALL Asbestos Sample Location Diagram - Flattened |
| ALL Lead Sample Location Diagram - Flattened |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Photo log ACM LBP _DWC_ |
| Amistad Power Plant Asb + Lead Survey Report _DWC_ |
| Sam's Certs Exp 2013 |
| Hector Gonzales CSST and LEAD |
File details come from the government source that posted it. Updated .