Q-A4.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- FP1024718
About this file
This is a Questions and Answers document for the furnish and install storm shelters solicitation at Vance Air Force Base. The Q&A addresses 22 contractor inquiries regarding project execution, site management, and payment procedures for the 158 prefabricated storm shelter installations at Capehart Housing. Key clarifications include: the contractor may work at multiple locations simultaneously while maintaining site safety and coordinating with the ASRC Construction Manager; safety fencing and erosion control must be placed around active construction areas and sequenced according to work progress, with contractor-proposed plans requiring approval before work commences; utility locating will be coordinated through Vance AFB rather than OKIE, with the contractor responsible for requesting utility markings through the ASRC Construction Manager; storm shelters may be placed outside fenced yard areas if access within the 50-foot minimum distance from homes is prohibited; and the gravel lot at the south side of Vance AFB serves as the designated storage and staging area for multiple shelters, equipment, and materials overnight.
The Q&A further specifies that excess excavated soil must be removed immediately following installation and hauled off-base at contractor expense, with final disposal responsibility remaining with the contractor; all disturbed areas must be restored to pre-construction conditions or better with Bermuda grass seeding and soil grading/compaction; final inspection occurs after each shelter placement with an ASRC-provided inspector on site; and documentation requirements include compaction test results, site cleanliness photos, graded area conditions post-seeding, as-builts, O&M data, warranties, and manufacturer compliance certifications. Payment shall be submitted monthly via a Schedule of Values similar to AIA G702/703 format, breakable by number of completed shelters, to the ASRC Construction Manager for approval, with all communication and coordination directed through ASRC Construction Management and ASRC Local Purchase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q-A3.xlsx | XLSX spreadsheet | |
| Q-A1.xlsx | XLSX spreadsheet | |
| Q-A2.xlsx | XLSX spreadsheet | |
| Q-A5.xlsx | XLSX spreadsheet | |
| Q-A6.xlsx | XLSX spreadsheet | |
| Insurance Provisions - Vendor Requirements 2024.docx | DOCX document | |
| Storm Shelter site visit attendees.pdf | ||
| Base map.pdf | ||
| Q-A.xlsx | XLSX spreadsheet | |
| OK28WD.pdf | ||
| FP1024718 - SoW Furnish and Install Storm Shelters on Capehart Housing F1200UGWS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questionnaire
| COMMENT / QUESTION FORM | ||||
| All submitted questions will be added to this document once received and reviewed by the requester. Once questions are answered, they will be posted by the indicated date. | ||||
| Question # | Reference Document | Question | Response | |
| 1 | Is the contract award based soley on the lowest bid price, or will contractor qulifications, Experience on the past performance, inability to complete large -high volume officials and projects also to be considered? | Low Price Technically Acceptable | ||
| 2 | Are any evaluation points, preferences, or other considerations available for veteran-owned businesses? | This is full and open. | ||
| 3 | Would Vance AFB prefer installation work to proceed in stages dash for example, completing one side of the street or one designated area before moving to another section? | The Contractor may work at multiple locations within the project. The Contractor needs to ensure site safety at all times and coordinate all work locations and schedule in advance with the ASRC Construction Manager. | ||
| 4 | The statement of work requires orange safety fencing at each job site. Is the intent for safety fence to be installed around the excavation area while excavation is activity taking place, or is it required for the entire | |||
| duration of each individual installation? | The Contractor is responsible for placing construction fences and erosion control around active construction areas that will be exposed and be kept open and shall sequence placement of construction fence according to the areas being worked; or as they think will be safest being in a residential area. The Contractor needs to provide a proposed plan for both, erosion and fencing, to the ASRC Construction Manager for review and approval prior to commencing work. The Contractor shall ensure that the work site is safe at all times. | |||
| 5 | If treatments prevent safe access for our trucks or equipment, are we permitted to turn necessary plans? If approval is required before trimming, who should firestorm contact for authorization? | The Contractor shall contact the ASRC Construction Manager for further guidance prior to commencing any work. | ||
| 6 | During the site visit, Firestorm observed existing cracks and some sidewalks located within the access/easement areas if our equipment must cross an Aria correct sidewalk and the existing damage horses, | |||
| what documentation and procedure should be followed? | The Contractor shall contact the ASRC Construction Manager for further guidance. | |||
| 7 | At several residences, it appears the only practical equipment access maybe from the front of the property, which could require equip to cross areas containing water lines. We understand the crossing water lines should be avoided whenever possible and we consider when necessary. Can Vance Air Force Base provide information regarding allowable equipment/ load weight over the lines were these or the required procedure for protecting | |||
| the utilities from crossing them? | The preference is to conduct all work by accessing the yards and not through the residential roads. Utility markings will be completed prior to commencing work. Refer to plan sheet C102. | |||
| 8 | For clarification, Is Firestorm responsible for requesting all required OKIE utility locates prior to excavation? | |||
| Firestorm standard policy is to always have utilities located before exclamation begins because the project is located on a military isolation, we want to ensure the correct procedures are followed and that OKIE representatives have the proper identification and authorization to access the required areas? Additionally are there any private Obama government Dash owned, or base utilities that Okie will not locate? If so, who's | Refer to SoW Section 1.08.A Existing Underground Utilities. The Contractor needs to request utility markings through ASRC Construction Manager. Utility locates will not be done by OKIE, all coordination is done through Vance AFB. | |||
| 9 | If a residence has a fenced yard, is the storm shelter required to be installed inside the fenced area, or may the final location be selected based on accessibility and site conditions? | Because this is a military installation and tenants move frequently, it is difficult to provide an address and guarantee that a fence will be in place by the time construction occurs. Therefore, shelters shall be placed outside of the fence if the fence prohibits the installation of the unit within the 50-ft minimum distance from the home. The Contractor shall contact ASRC Construction Management if they cannot access the site to place the unit due to a fence being in the way so they can obtain direction on where to place the shelter unit. The Contractor is responsible for the costs of the temporary construction fence for the duration of the project, not the residential fence. | ||
| 10 | Will the tenant/residents have input Find a location in Select a location of Attorney Sonia by Vance AFB/ contactor represenatives? | All communication/requests will be done through ASRC Construction Management and ASRC Local Purchase. | ||
| 11 | Are there designated staging areas on Vance Air Force Base where Firestorm can store storm shelters awaiting in installations? | The gravel lot at the south side of Vance AFB can be used as a storage area. | ||
| 12 | If staging is permitted? May multiple shelters be delivered and staged at one location, or must shelters be delivered individually as they are scheduled for installation? | Multiple shelters can be stored in the gravel lot at the south side of the base. | ||
| 13 | Is there a secure staging area where Firestorm may leave equipment and materials overnight, including excavators, skid steers, trucks, trailers, tools and shovels, installation material. Clarification firestorm noted that part one on the section identifies a staging area for Mater. We would like to confirm whether this staging | |||
| area may also be used for equipment, trucks storm shelters awaiting installation. | The gravel lot at the south side of Vance AFB can be used as a storage area for all equipment and materials. | |||
| 14 | Please confirm whether Vance AFB requires all excess Vacuumed soil to be removed from each shelter location immediately following installations. Firestorm understands that page 13, section one of the standard | |||
| book indicates the parents should not remain along the side of the shelter | Yes, the Contractor will need to remove the excess soil and place it on the south end of the Installation at a location indicated by the ASRC Construction Manager. | |||
| 15 | Dear Excavated soil must be hauled away, does Vance AFB have a designated location on the base for the material may be disposed of? If not, will Firestorm be responsible for locating an approved off site disposal | |||
| facility and including all hauling and disposal costs in our bid? | All spoils need to be hauled off base at contractors expense. Contractor will be responsible for the spoils final destination off site. | |||
| 16 | Can you provide additional specifications, drawings, or a typical insulation details showing the erosion-control measures required at each shelter location? | The Contractor is responsible for placing construction fences and erosion control around active construction areas that will be exposed and be kept open and shall sequence placement of construction fence according to the areas being worked; or as they think will be safest being in a residential area. The Contractor needs to provide a proposed plan for both, erosion and fencing, to the ASRC Construction Manager for review and approval prior to commencing work. The Contractor shall ensure that the work site is safe at all times. | ||
| 17 | Is erosion control required at every shelter installation location? If so, approximately how many linear feet of erosion-control material per shelter should contractor include in the bids? Purification of the required | |||
| material and quantity will help ensure all bidders are pricing the same scope of work. | The Contractor is responsible for placing construction fences and erosion control around active construction areas that will be exposed and be kept open and shall sequence placement of construction fence according to the areas being worked; or as they think will be safest being in a residential area. The Contractor needs to provide a proposed plan for both, erosion and fencing, to the ASRC Construction Manager for review and approval prior to commencing work. The Contractor shall ensure that the work site is safe at all times. | |||
| 18 | Approximately how many square feet of Bermuda grass seeding should be anticipated for each shelter installation? | The Contractor shall plan to seed all disturbed areas around the shelter and any areas where trucks left ruts. | ||
| 19 | Does Vance Air Force Base require a specific seating method or restoration process? | The Contractor need to restore areas to pre-construction conditions or better. Fill in all ruts created by heavy equipment, and grade and compact the soil accordingly. The Contractor can prepare a plan and submit it to ASRC Construction Management for review and approval. | ||
| 20 | What final documentation is required from Firestorm after each shelter installation and/or at the completion of the overall project? | Shelters shall be installed in accordance with Manufacturer's instructions and applicable codes. Acceptance requirements include compaction tests results, site cleanliness, graded area condition after seeding, as-builts, pictures, O&M data, warranties, and any other applicable documents. | ||
| 21 | Will each shelter required individual final inspection before the installation is considered complete? if so, who will perform the inspection, and does the inspection need to occur before a firestorm moves to the next | |||
| installation? | Yes, each shelter will be inspected after placement. The ASRC Construction Manager will have an Inspector on site during placement of each shelter. | |||
| 22 | How will payment request be submitted and processed? Please clarify whether payment will be based on: Individual completed shelters, groups /phases of completed shelters, monthly progress billing, percentage of overall project completion, And final completion of the entire project? We would also appreciate clarification | |||
| regarding any required invoicing forms, support documents, attainage, and expected payment terms. | Contractor will need to submit a Schedule of Values to ASRC Construction Manager after project award for review. A pay application/schedule of values similar to AIA G702/703 is acceptable. Schedule of Values can be broken down by number of shelters if needed. Contractor will submit pay requests monthly to ASRC Construction Manager for approval. |