FMS F4 Repairs DD1423s - 22 Nov 23.pdf

DoD Form Nov 22, 2023 PDF 436 KB Posted

Attached to
F-4 Spare Parts
Solicitation number
FA822024R3000
Issued by

About this file

This document contains five Contract Data Requirements Lists (CDRLs) for a federal contract to provide spare parts and services for F-4 aircraft. The CDRLs require the following deliverables: monthly status reports, meeting minutes within five days of meetings, test inspection reports within 20 days of testing, aftermarket inspection reports within 10 days of part delivery, and traceability documentation with inspection reports. The Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the requiring agency. Delivery due dates and distribution requirements are specified for each data item. The likely purpose of this procurement is to maintain F-4 aircraft used for foreign military sales training purposes.

View the file

Other versions and copies of DD Form 1423S

File Revision Posted Attached to
EXHIBIT A - CDRLs A001-A015 DD 1423s_Rev001.pdf Rev. 001 Mobile Aircraft Arresting System (MAAS)
RFP Attachment 13 - Sensor Beam 2024 CDRL A013-A014 DD 1423s 29 Aug 2022.pdf Aug 29, 2022 Sensor Beam 2024 - DRAFT RFP
RFP Attachment 13 - Sensor Beam 2024 CDRL A009-A012 DD 1423s 29 Aug 2022.pdf Aug 29, 2022 Sensor Beam 2024 - DRAFT RFP
RFP Attachment 13 - Sensor Beam 2024 CDRL A005-A008 DD 1423s 29 Aug 2022.pdf Aug 29, 2022 Sensor Beam 2024 - DRAFT RFP
RFP Attachment 13 - Sensor Beam 2024 CDRL A001-A004 DD 1423s 29 Aug 2022.pdf Aug 29, 2022 Sensor Beam 2024 - DRAFT RFP
Attach 16 - Consolidated DD1423s_28 Feb 22.pdf Feb 28, 2022 SOLICITATION NOTICE/ Request for Proposals (RFP) for Keesler Air Force Base (KAFB) Base Operations Support (BOS)
Attach 16 - DD1423s Consolidated 2-32_8 Dec 21.pdf Dec 8, 2021 SOLICITATION NOTICE/ Request for Proposals (RFP) for Keesler Air Force Base (KAFB) Base Operations Support (BOS)
Attach 16 - DD1423s Consolidated Section 2-32_ 17 Nov 21.pdf Nov 17, 2021 SOLICITATION NOTICE/ Request for Proposals (RFP) for Keesler Air Force Base (KAFB) Base Operations Support (BOS)
Attachment 6 - CDRL DD1423s.pdf Revision not stated Amendment 1 - Solicitation - Kleine Brogel AB, Belgium Installation Warning System (IWS)
EXHIBIT B - CDRLs B001-B003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT A - CDRLs A001-A015 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT F - CDRLs F001-F003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT E - CDRLs E001-E003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT C - CDRLs C001-C003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT D - CDRLs D001-D003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
EXHIBIT G - CDRLs G001-G003 - DD 1423s.pdf Revision not stated Mobile Aircraft Arresting System (MAAS)
DD1423s F-4 Repair and Overhaul.pdf Revision not stated FA822024R3002 F-4 Repair and Overhaul
DD1423s.pdf Revision not stated Repair of ALQ-131, ALQ-161, and ALQ-172
Attachment 6 - T1 OandI CDRLs (DD1423s).pdf Revision not stated SDA Tranche 1 Operations & Integration (O&I)
Attachment 6 - T1DES DD Form 1423s.pdf Revision not stated T1DES Draft RFP - SDA - Amend 02 - RFI Responses
Show all 20

Who attaches DD Form 1423S

Other files

File Type Posted
FA822024R3000_______0001.pdf PDF
F-4 Parts Section M.docx DOCX document
L-1 F-4 Parts Cross Reference Matrix.xlsx XLSX spreadsheet
F-4 Parts PWS.docx DOCX document
F-4 Parts Section L.docx DOCX document
FA822024R3000.pdf PDF
L-2 F-4 Parts Price Matrix.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/22/2023 12:34:59 PM CST CDRL Table of Contents

CONTRACT #:

CONTRACTOR:

SET NAME: FMS - FMS F-4 SYSTEM ITEM: FMS F-4

PROGRAM: Training Aircraft

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFLCMC/WLDI DI-MGMT-81928 PWS Para. 2.3

Contractor’s Status and Progress Report

A002 AFLCMC/WLDI DI-ADMN-81250C PWS Para. 2.3

Meeting Minutes

A003 AFLCMC/WLDI DI-NDTI-80809B PWS Para. 1.3.1.4

Test Inspection Report

First Article Inspection/First Article Test (FAI/FAT)

A004 AFLCMC/WLDI DI-MGMT-80508B PWS Para. 1.3.3; 1.3.3.2

Technical Report-Studies/Services

Aftermarket Inspection Report

A005 AFLCMC/WLDI DI-MGMT-80508B PWS Para. 1.3.3.1

Technical Report-Studies/Services

Traceability Documentation

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

FMS F-4

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Contractor’s Status and Progress Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81928

5. CONTRACT REFERENCE

PWS Para. 2.3

6. REQUIRING OFFICE

AFLCMC/WLDI

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

30DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: DID DI-MGMT-81928 is tailored as follows:

Delete: Paras. 2.4 thru 2.7. Status of the progress of work report contents should follow the topics outlined in PWS paragraph 2.3.

Block 9: See CDRL General Instructions for detailed requirements.

Blocks 10, 12 and 13: The Contractor shall submit the first delivery NLT than 30 days after contract award. Subsequent deliverables shall be submitted NLT than 5 calendar days of each month.

AFLCMC/WLDI 1

15. TOTAL 0 1 0

G. PREPARED BY

Laura A. Ivey, GS-12, Config Mgr AFLCMC/WLDI, Wright-Patt AFB, OH

H. DATE I. APPROVED BY

Maxine Christensen, GS-12, Prog Mgr AFLCMC/WLDI, Hill AFB, UT

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

FMS F-4

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Meeting Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250C

5. CONTRACT REFERENCE

PWS Para. 2.3

6. REQUIRING OFFICE

AFLCMC/WLDI

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

BLK16

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

Block 9: See CDRL General Instructions for detailed requirements.

Block 8: Approval required for first submission only. All subsequent deliveries do not require approval provided content is accurate.

Blocks 10, 12 and 13: The Contractor shall submit no later than 5-calendar days after the conclusion of each meeting/review. The Contractor shall collaborate with PMO for any corrections and shall resubmit updates as required.

AFLCMC/WLDI 1

15. TOTAL 0 1 0

G. PREPARED BY

Laura A. Ivey, GS-12, Config Mgr AFLCMC/WLDI, Wright-Patt AFB OH

H. DATE I. APPROVED BY

Maxine Christensen, GS-12, Prog Mgr AFLCMC/WLDI, Hill AFB UT

J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

FMS F-4

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Test Inspection Report

3. SUBTITLE

First Article Inspection/First Article Test

(FAI/FAT)

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PWS Para. 1.3.1.4

6. REQUIRING OFFICE

AFLCMC/WLDI

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

Block 9: See CDRL General Instructions for detailed requirements.

Blocks 10, 12 and 13: The Contractor shall submit deliverable and subsequent submissions 20-days after completion of every FAI/FAT.

AFLCMC/WLDI 1

15. TOTAL 0 1 0

G. PREPARED BY

Laura A. Ivey, GS-12, Config Mgr AFLCMC/WLDI, Wright-Patt AFB, OH

H. DATE I. APPROVED BY

Maxine Christensen, GS-12, Prog Mgr AFLCMC/WLDI, Hill AFB, UT

J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

FMS F-4

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Technical Report-Studies/Services

3. SUBTITLE

Aftermarket Inspection Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80508B

5. CONTRACT REFERENCE

PWS Para. 1.3.3; 1.3.3.2

6. REQUIRING OFFICE

AFLCMC/WLDI

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

Block 9: See CDRL General Instructions for detailed requirements.

Blocks 10, 12 and 13: The Contractor shall submit deliverable and subsequent submissions 10-calendar days after visual inspection delivery of parts, as required per the applicable PWS paragraphs in Block 5.

AFLCMC/WLDI 1 1

15. TOTAL 1 1 0

G. PREPARED BY

Laura A. Ivey, GS-12, Config Mgr AFLCMC/WLDI, Wright-Patt AFB, OH

H. DATE I. APPROVED BY

Maxine Christensen, GS-12, Prog Mgr AFLCMC/WLDI, Hill AFB, UT

J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

FMS F-4

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Technical Report-Studies/Services

3. SUBTITLE

Traceability Documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80508B

5. CONTRACT REFERENCE

PWS Para. 1.3.3.1

6. REQUIRING OFFICE

AFLCMC/WLDI

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

Block 9: See CDRL General Instructions for detailed requirements.

Blocks 10, 12 and 13: The Contractor shall submit deliverable and subsequent submissions concurrently with CDRL A004 and as required per the applicable PWS paragraphs in Block 5.

AFLCMC/WLDI 1

15. TOTAL 0 1 0

G. PREPARED BY

Laura A. Ivey, GS-12, Config Mgr AFLCMC/WLDI, Wright-Patt AFB, OH

H. DATE I. APPROVED BY

Maxine Christensen, GS-12, Prog Mgr AFLCMC/WLDI, Hill AFB, UT

J. DATE

18. ESTIMATED

TOTAL PRICE

File details come from the government source that posted it. Updated .