Fire Protection Set.pdf

PDF 670 KB Posted

Attached to
Amity Middle School Bethany Fire Pump Replacement
Solicitation number
Amity 2025-4
Issued by
Connecticut

About this file

Fire Protection Set Summary

This is a fire protection design and demolition document prepared for the Amity Regional School District No. 5 in Bethany, Connecticut, involving the fire pump replacement project at Amity Middle School. The scope of work encompasses the complete removal of existing fire protection infrastructure, including the fire pump, jockey pump, associated piping, valves, supports, and concrete pad, followed by installation of new equipment and systems. The project requires coordination with multiple trades, including electrical and HVAC contractors, and mandates adherence to NFPA standards for sprinkler spacing, density, and placement. The drawings indicate diagrammatic layouts for upper and lower level vault floor plans with detailed schematics showing new inline electric fire pump installation, jockey pump with control panel configuration, new 6-inch fire service connections to the existing storage tank, new 4-inch fire pump test header piping, new sump pumps, and all associated supervised valves and controls. A mandatory pre-bid walkthrough appointment is required, with no appointments scheduled after 2:00 PM on Friday, November 7, 2025, and sealed proposals are due no later than Friday, November 14, 2025 at 1:00 P.M.

The document specifies that all removed equipment shall not be reused and that new installations only are permitted. Critical requirements include coordination with the Authority Having Jurisdiction (AHJ) before draining and refilling the fire protection water storage tank, implementation of fire watch procedures per local fire codes, controlled tank drainage to prevent infrastructure damage, thorough tank cleaning and inspection before refilling to NFPA 22 standards, and complete system testing and commissioning before return to service. The jockey pump controller must be listed for fire service (UL 508A) with pressure switch, motor protection, and hand-off-auto control capabilities, manufactured by Firetrol or equivalent. The fire pump shall be mounted on a new concrete pad with a Stancor Model SV-50 oil maintenance system, and all piping materials must match existing specifications. The contractor assumes responsibility for site familiarization with existing systems, coordination of service interruptions with the owner, and notification of the AHJ and building owner upon work completion.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION ABBREVIATIONS

DESCRIPTIONSYMBOLDESCRIPTIONSYMBOL

LEGEND NOTE

THESE ARE THE GENERAL LEGENDS OF SYMBOLS AND ABBREVIATIONS, AND SHALL

BE USED AS A DICTIONARY TO DEFINE ITEMS INDICATED ON DRAWINGS. NOT ALL

SYMBOLS OR ABBREVIATIONS DEFINED ARE NECESSARILY USED ON THIS PROJECT.

THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:

A. THESE GENERAL NOTES ARE APPLICABLE TO ALL FIRE PROTECTION DRAWINGS.

B. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL INTENT OF WORK. SEE DETAILS,

RISERS, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

C. THE FIRE PROTECTION DRAWINGS INDICATE A SUGGESTED SPRINKLER LAYOUT. SPRINKLERS MAY NOT BE SHOWN IN ALL AREAS. SPRINKLER QUANTITIES SHALL NOT BE COUNTED AS A TAKE OFF OR AS EXACT LOCATIONS. REFER TO NFPA STANDARDS FOR EXACT SPACING, DENSITY, AND LOCATION REQUIREMENTS. ADDITIONAL SPRINKLERS MAY BE REQUIRED IN SOME AREAS DUE TO

OBSTRUCTIONS, SUCH AS DUCTWORK, PIPING, STRUCTURAL ELEMENTS, ETC.

D. SPRINKLERS IN FINISHED CEILING AREAS SHALL ALWAYS BE LOCATED IN THE CENTER OF

CEILING TILES IN BOTH DIRECTIONS UNLESS INDICATED OTHERWISE.

E. REVIEW THE ARCHITECTURAL REFLECTED CEILING PLANS AS PART OF THIS CONTRACT FOR

ADDITIONAL INFORMATION SUCH AS CEILING HEIGHTS, TYPES, SOFFITS AND OR OTHER DEVICE

LOCATIONS.

F. REVIEW THE ELECTRICAL DIVISION DOCUMENTS AND COORDINATE THE FIRE PROTECTION WORK

WITH LOCATIONS OF LIGHTS AND CEILING MOUNTED DEVICES WHICH MAY INTERFERE WITH

SPRINKLER LOCATIONS OR SPRAY PATTERNS.

G. REVIEW THE HVAC DIVISION DOCUMENTS AND COORDINATE THE FIRE PROTECTION WORK WITH

LOCATIONS OF CEILING MOUNTED DEVICES SUCH AS DIFFUSERS, GRILLS, REGISTERS,

LOCATIONS OF HEAT PRODUCING EQUIPMENT AND DUCTWORK REQUIRING SPRINKLER

PROTECTION BELOW THEM.

H. PROVIDE PIPE EXPANSION JOINTS AT ALL BUILDING EXPANSION JOINT LOCATIONS AND

APPROVED SEISMIC EXPANSION LOOPS AT ALL BUILDING SEISMIC JOINT LOCATIONS AS

REQUIRED PER NFPA STANDARDS AND BUILDING CODES. REVIEW ARCHITECTURAL AND

STRUCTURAL DRAWINGS FOR EXACT LOCATIONS OF EXPANSION AND SEISMIC JOINTS.

I. REFER TO SITE PLAN AND CIVIL ENGINEER'S DOCUMENTS FOR ADDITIONAL INFORMATION

PERTAINING TO COORDINATION OF SITE UTILITIES, BOTH EXISTING AND NEW.

J. IN RENOVATION WORK, COORDINATE SYSTEMS SHUTDOWN WITH OWNER IN ORDER TO MAKE

NEW PIPING CONNECTIONS. ALLOW MINIMUM OF TEN (10) DAYS ADVANCE NOTICE FOR OWNER

APPROVAL TO PROCEED WITH CONTRACT WORK.

THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:

A. VISIT THE SITE AND BECOME FAMILIAR WITH THE EXISTING SYSTEMS AND CONDITIONS IN AREAS

OF RENOVATION.

B. ALL EXISTING PIPING AND EQUIPMENT SHOWN HAS BEEN TAKEN FROM THE BEST AVAILABLE EXISTING INFORMATION. THE DRAWINGS ARE DIAGRAMMATIC AND ALL PIPING AND DEVICES MAY

NOT BE SHOWN. THE INTENT OF THE DOCUMENTS IS THAT SYSTEM EQUIPMENT AND PIPING IS

TO BE REMOVED IN ALL RENOVATED AREAS AS NOTED AND MAY NOT ALL BE SHOWN.

C. REMOVE ALL FIRE PROTECTION PIPING SYSTEMS INCLUDING BUT NOT LIMITED TO

SPRINKLER/STANDPIPE, SPRINKLERS HANGERS, VALVES, SWITCHES, AND DEVICES AS SHOWN

OR NOTED ON THE DRAWINGS. COORDINATE ALL WIRING WORK RELATED TO DEVICES BEING

REMOVED WITH ELECTRICAL CONTRACTOR.

D. ALL PIPING TO BE REMOVED SHALL BE REMOVED COMPLETELY AND CAPPED AS SHOWN

WITHOUT LEAVING ANY DEAD ENDED PIPING OR ABANDONED PIPING. SECURE IN PLACE.

E. NO FIRE PROTECTION EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED OR

ABANDONED SHALL REMAIN.

F. IT IS THE INTENT OF THESE DOCUMENTS THAT ANY AND ALL DEVICES REMOVED SHALL NOT BE

REUSED, BUT ONLY NEW SHALL BE INSTALLED.

G. ANY SYSTEM OR EQUIPMENT TO REMAIN ACTIVE DURING RENOVATION SHALL BE KEPT IN

OPERATION BY PROVIDING TEMPORARY CONNECTIONS AS REQUIRED UNTIL NEW SYSTEMS ARE

INSTALLED AND OPERATIONAL.

H. ALL SERVICE INTERRUPTIONS SHALL BE COORDINATED WITH THE OWNER PRIOR TO

COMMENCEMENT OF ANY WORK.

I. THE FIRE MARSHAL AND/OR THE INSURANCE UNDERWRITER SHALL BE CONTACTED TO REVIEW

AND APPROVE THE EXTENT OR PHASING OF THE FIRE PROTECTION DEMOLITION IN ORDER TO

PROTECT THE OCCUPANTS AND PROPERTY. THESE DOCUMENTS DO NOT ADDRESS THE

PHASING OF THE SYSTEM REMOVAL, ONLY THE EXTENT.

J. REVIEW THE ARCHITECTURAL DEMOLITION DRAWINGS AS PART OF THIS CONTRACT FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

REMOVE EXISTING PIPING OR EQUIPMENT

FIRE DEPARTMENT CONNECTION PIPING

PIPE DOWN

CAPPED PIPE

PIPE DROP

PIPE UP

FIRE PUMP TEST HEADER PIPING

PREACTION SPRINKLER SYSTEM

EXISTING PIPING OR EQUIPMENT

FDC

FPTH

PA

FIRE LINE

FIRE SERVICE BURIED

WET SPRINKLER SYSTEM

DRY PIPE SPRINKLER SYSTEM

DRAIN PIPING

FLOW DIRECTION

F

SP

DRY

F

D

HD HEAT DETECTOR

TYP TYPICAL

UG

VIF

UNDERGROUND

VERIFY IN FIELD

PREACTION ALARM VALVE CABINET

REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY

PAC

RCV

SP

SS

RPD

RR

PSI

PRV

PS

PIV

RISER CONTROL VALVE

SUPERVISORY SWITCH

REMOVE & RELOCATE

SPRINKLER

PRESSURE REGULATING VALVE

POUNDS PER SQUARE INCH

PRESSURE SWITCH

POST INDICATOR VALVE

LPS

PA

NIC

NO

NC

JPC

IT

JP

HT

LOW PRESSURE SWITCH

NOT IN CONTRACT

NORMALLY OPEN

NORMALLY CLOSED

PREACTION

JOCKEY PUMP CONTROLLER

JOCKEY PUMP

INTERMEDIATE TEMPERATURE

HIGH TEMPERATURE

CTE CONNECT TO EXISTING

FLOOR CONTROL VALVE ASSEMBLY

DOUBLE CHECK VALVE ASSEMBLY

FHC FIRE HOSE CABINET

FS

G

GPM

FVC

FSP

FHV

FPTH

FPC

FHR

FLOW SWITCH

GALLONS PER MINUTE

FIRE VALVE CABINET

FIRE STANDPIPE

CAGE GUARD

FIRE HOSE VALVE

FIRE PUMP TEST HEADER

FIRE PUMP CONTROLLER

FIRE HOSE RACK

EL

FCVA

FDC

ETR

EX

DN

EC

DCVA

DPV

ELEVATION

FIRE DEPARTMENT CONNECTION

EXISTING TO REMAIN

EXISTING

EXTENDED COVERAGE

DRY PIPE VALVE

DOWN

AFF

BOP

AFG

ATS

BFP

ACV

ABOVE FINISHED FLOOR

BOTTOM OF PIPE

ABOVE FINISHED GRADE

BACKFLOW PREVENTER

AUTOMATIC TRANSFER SWITCH

ALARM CHECK VALVE

CHECK VALVE

SMOKE DETECTOR

HEAT DETECTOR

BACKFLOW PREVENTER ASSEMBLY (DCVA) WITH SHUTOFF VALVES

PREACTION ALARM ASSEMBLY CABINET

AUTOMATIC TRANSFER SWITCH

FLOOR CONTROL VALVE ASSEMBLY

CONNECT TO EXISTING

JOCKEY PUMP CONTROLLER

FIRE PUMP CONTROLLER

BACKFLOW PREVENTER ASSEMBLY (RPD) WITH SHUTOFF VALVES

ALARM BELL

PRESSURE GAUGE

FIRE PUMP TEST HEADER (REFER TO SPECIFICATIONS FOR TYPE)

POST INDICATOR VALVE (SUPERVISED)

PRESSURE REGULATING VALVE (X = PSI SETTING)

PUMP

EXISTING SPRINKLER TO REMAIN

PRESSURE REGULATING ANGLE HOSE VALVE

ANGLE HOSE VALVE

OS&Y VALVE (SUPERVISED)

BUTTERFLY VALVE (SUPERVISED)

FIRE VALVE CABINET

LOW PRESSURE SWITCH

PRESSURE SWITCH

ALARM CHECK VALVE RISER ASSEMBLY

SPRINKLER FLOW SWITCH

DRY PIPE VALVE RISER ASSEMBLY

PREACTION VALVE RISER ASSEMBLY

EXISTING SIDEWALL SPRINKLER TO REMAIN

EXISTING SPRINKLER TO BE REMOVED

EXISTING SIDEWALL SPRINKLER TO BE REMOVED

NEW UPRIGHT SPRINKLER

NEW DRY SIDEWALL SPRINKLER

NEW PENDENT SPRINKLER

NEW CONCEALED SPRINKLER

NEW DRY PENDENT OR CONCEALED SPRINKLER

NEW WET SIDEWALL SPRINKLER

REMOTE ALARM PANEL

PRESSURE RELIEF VALVE

SUPERVISORY SWITCH (TAMPER SWITCH)

FIRE PROTECTION SYMBOLS

POST MOUNTED FIRE DEPARTMENT CONNECTION

(REFER TO SPECIFICATIONS FOR TYPE)

WALL MOUNTED FIRE DEPARTMENT CONNECTION

(REFER TO SPECIFICATIONS FOR TYPE)

E

R

A

D

PA

FS

PS

LPS

SS

PRV

NEW PENDENT SPRINKLER WITH SPRING UPRIGHT

X

FDC

FDC

ATS

FPC

JPC

PAC

RAP

FCVA

FVC

S

H

FIRE PROTECTION PIPING LEGENDFIRE PROTECTION GENERAL NOTES

FIRE PROTECTION DEMOLITION NOTES

E

R

GATE VALVE (SUPERVISED)

DATE

REV.

NO.

DRAWING TITLE:

FI

R

E P

U M

P R

E

PL

A C

E M

E N

T B

E T

H A

N Y

M

ID

D L

E S

C H

O O

L

A M

IT

Y

R

EG

IO

N

LU

K

E H

IL

L

R O

A D

B

ET

H A

N Y

, C T

DESCRIPTION

REVISIONS

PR

O

JE

C

T N

A M

E:

KEYPLAN

DRAWING NUMBER:

PROJ #: 2024090.00

DATE: 06/06/2025

CHECK BY:

DRAWN BY:

SCALE:

U se r I D

Fi le N am e:

Fi le

P at h:

FP

-0

-L G

N D

.d w g U

:\2

4\

0.

\B

IM

\C

AD

\F ire

-P ro te ct io n

6/ 5/

2:

:5

PM

R iv er a- Pe na , K ris tia n G

N

AV N E MLZ

E N G I N E E R S

VAN ZELM HEYWOOD & SHADFORD, INC.

10 TALCOTT NOTCH, FARMINGTON, CT 06032 - 1800

Connecticut | Massachusetts | North Carolina

CT: 860.284.5064 MA: 617.218.9976 NC: 704.799.7275

AMITY

ISSUED FOR BID

JUNE 06,2025

FP001

YRP

SSK/AJD

NONE

FIRE PROTECTION

LEGENDS, DETAILS

AND GENERAL NOTES

REMOVE EXISTING JOCKEY

PUMP CONTROLLER AND

ASSOCIATED CONDUIT/WIRING

BACK TO SOURCE AS REQUIRED

TO ALLOW NEW CONNECTIONS

EXISTING 4" FIRE PUMP TEST

HEAD PIPING UP TO REMAIN

EXISTING BURIED FIRE

SERVICE TO SCHOOL

TO REMAIN

SCALE:1 1/2" = 1'-0"

FIRE PROTECTION DEMOLITION UPPER LEVEL VAULT

SCALE:2 1/2" = 1'-0"

FIRE PROTECTION DEMOLITION LOWER LEVEL VAULT

SCALE:3 1/2" = 1'-0"

FIRE PROTECTION NEW WORK UPPER LEVEL VAULT

EXISTING JOCKEY PUMP

TO BE REMOVED

EXISTING BURIED FIRE

SERVICE TO SCHOOL

TO REMAIN

EXISTING FIRE SUPPLY

FROM BURIED TANK TO REMAIN

EXISTING FIRE PUMP

AND CONCRETE PAD TO

BE REMOVED

REMOVE ALL EXISTING FIRE

PROTECTION PIPING, VALVES

SUPPORTS, FIRE PUMP, JOCKEY

PUMP, CONCRETE PAD

EXISTING FIRE PUMP

TEST HEADER TO

REMAIN.

FIRE PUMP

CONTROLLER / AUTO.

TRANSFER SWITCH TO

REMAIN

(2)EXISTING SUMP PUMP

TO BE REMOVED. CUT-BACK

DISCHARGE PIPING TO ALLOW

RECONNECTION TO NEW PIPING

EXISTING FIRE PUMP

TEST HEADER TO

REMAIN

FIRE PUMP

CONTROLLER / AUTO.

TRANSFER SWITCH TO

REMAIN

*EXISTING FREESTANDING FIRE

DEPARTMENT CONNECTION LOCATED

ON SITE TO REMAIN

SCALE:4 1/2" = 1'-0"

FIRE PROTECTION NEW WORK LOWER LEVEL VAULT

FPTH PIPING UP

CONNECT NEW 6" FIRE

SERVICE TO EXISTING

FROM STORAGE TANKCOPY

FLOW METER

& FLOW

SWITCH

CONNECT NEW 6" FIRE

SERVICE TO EXISTING

NEW INLINE

ELECTRIC FIRE PUMP

NEW JOCKEY PUMP

CONNECT NEW 4" FPTH

PIPING TO EXISTING

NEW SUMP PUMPS. CONNECT NEW

DISCHARGE TO EXISTING. PIPES &

FITTINGS MATERIAL TO MATCH

EXISTING, PROVIDE STANCOR, INC.

MODEL # SV-50 PUMP

"OIL-MINDER" SYSTEM WITH

CONFIGURATION "C".

NEW SUPERVISED OS&Y

VALVE. TYPICAL

FIRE PROTECTION

CONTRACTOR TO PROVIDE

NEW CONCRETE PAD

PROVIDE ALL NEW FIRE

PROTECTION PIPING, VALVES

SUPPORTS, FIRE PUMP, JOCKEY

PUMP, CONCRETE PAD

NOTES:

1. CONTRACTOR SHALL COORDINATE WITH THE AUTHORITY HAVING JURISDICTION

(AHJ) BEFORE DRAINING AND REFILLING THE FIRE PROTECTION WATER

STORAGE TANK.

2. PRIOR TO DRAINING THE TANK, ENSURE THAT FIRE WATCH PROCEDURES ARE IN

PLACE AS REQUIRED BY LOCAL FIRE CODES.

3. TANK SHALL BE COMPLETELY DRAINED IN A CONTROLLED MANNER TO PREVENT

DAMAGE TO THE TANK AND SURROUNDING INFRASTRUCTURE.

4. AFTER INSTALLATION OF THE NEW FIRE PUMP, THE CONTRACTOR SHALL

THOROUGHLY CLEAN AND INSPECT THE TANK BEFORE REFILLING.

5. TANK SHALL BE REFILLED TO THE REQUIRED CAPACITY PER NFPA 22

STANDARDS, ENSURING PROPER WATER QUALITY.

6. PERFORM NECESSARY TESTING AND COMMISSIONING OF THE FIRE PUMP AND

VERIFY PROPER OPERATION OF ASSOCIATED PIPING AND VALVES.

7. NOTIFY THE AHJ AND BUILDING OWNER UPON COMPLETION OF WORK AND

BEFORE RETURNING THE SYSTEM TO SERVICE.

8. FURNISHED AND INSTALL JOCKEY PUMP WITH CONTROL PANEL AS

MANUFACTURED BY FIRETROL OR EQUAL.

9. FURNISH AND INSTALL JOCKEY PUMP WITH CONTROL PANEL AS MANUFACTURED

BY FIRETROL OR EQUAL; WITH DISCONNECT H-O-A SWITCH WITH PILOT LIGHT,

AND RUN TIMER

NEW JOCKEY PUMP CONTROLLER

LISTED FOR FIRE SERVICE (UL 508A),

WITH PRESSURE SWITCH, MOTOR

PROTECTION, AND HAND-OFF-AUTO

CONTROL. COORDINATE WITH FIRE

PUMP CONTROLLER AND FIRE ALARM

SYSTEM AS REQUIRED. TEST AND

COMMISSION COMPLETE SYSTEM.

DATE

REV.

NO.

DRAWING TITLE:

FI

R

E P

U M

P R

E

PL

A C

E M

E N

T B

E T

H A

N Y

M

ID

D L

E S

C H

O O

L

A M

IT

Y

R

EG

IO

N

LU

K

E H

IL

L

R O

A D

B

ET

H A

N Y

, C T

DESCRIPTION

REVISIONS

PR

O

JE

C

T N

A M

E:

KEYPLAN

DRAWING NUMBER:

PROJ #: 2024090.00

DATE: 06/06/2025

CHECK BY:

DRAWN BY:

SCALE:

U se r I D

Fi le N am e:

Fi le

P at h:

FP

-1

-F L0

1.

dw g U

:\2

4\

0.

\B

IM

\C

AD

\F ire

-P ro te ct io n

6/ 5/

2:

:0

PM

R iv er a- Pe na , K ris tia n G

N

AV N E MLZ

E N G I N E E R S

VAN ZELM HEYWOOD & SHADFORD, INC.

10 TALCOTT NOTCH, FARMINGTON, CT 06032 - 1800

Connecticut | Massachusetts | North Carolina

CT: 860.284.5064 MA: 617.218.9976 NC: 704.799.7275

AMITY

ISSUED FOR BID

JUNE 06,2025

FP101

YRP

SSK/AJD

1/2"=1'-0"

FIRE PROTECTION

UPPER AND LOWER

LEVEL VAULT

FLOOR PLANS

SS

SS

SS

SS

SS

SS

SS

SS

JPC

SCALE:1 1/2" = 1'-0"

FIRE PROTECTION SYSTEM SCHEMATIC DETAIL

PS

SS

FS

SS

SS

SS

SS

SS

SS

FLOW

METER

N.O.

DRAIN

N.O.

N.C.

2"

6"

6"

6"

N.C.

AUTO AIR

RELEASE

IF REQ'D

J.P.

N.O.

N.O.N.O.

EXISTING WALL MOUNTED FIRE

PUMP TEST HEADER ASSEMBLY

SERVICE VALVE

BURIED FIRE SERVICE

FINISHED GRADE

JOCKEY PUMP BOLTED

TO CONCRETE PAD

AUTOMATIC AIR RELIEF VALVE

ECCENTRIC REDUCER

PRESSURE GAUGE

TO MAIN RELIEF

VALVE IF REQ'D.

REFER TO

SPECIFICATIONS

CONCENTRIC REDUCER

TYPICAL HOUSEKEEPING PAD

FIRE PUMP BOLTED TO

CONCRETE PAD.

REFER TO SPECIFICATIONS

CORROSION RESISTANT

SENSING TUBING TO FIRE

PUMP CONTROLLER

CORROSION RESISTANT

SENSING TUBING TO

JOCKEY PUMP CONTROLLER

PIPE STAND WITH

SADDLE, BOLTED TO

FLOOR (TYPICAL)

LOW WATER PRESSURE

SUPERVISORY SWITCH

WHEN REQUIRED BY

AUTHORITY HAVING

JURISDICTION

TEST LOOP FOR

TESTING FIRE PUMP

WET PIPE SUPPLY TO FIRE

PROTECTION SYSTEM. TIE

INTO EXISTING

FLOW

SWITCH

SS

N.C.

FINISHED FLOOR

2"

METER THROTTLE

VALVE (MUST BE

OS&Y TYPE)

6"

6" 4"

6"

TIE INTO EXISTING

TIE INTO EXISTING

DATE

REV.

NO.

DRAWING TITLE:

FI

R

E P

U M

P R

E

PL

A C

E M

E N

T B

E T

H A

N Y

M

ID

D L

E S

C H

O O

L

A M

IT

Y

R

EG

IO

N

LU

K

E H

IL

L

R O

A D

B

ET

H A

N Y

, C T

DESCRIPTION

REVISIONS

PR

O

JE

C

T N

A M

E:

KEYPLAN

DRAWING NUMBER:

PROJ #: 2024090.00

DATE: 06/06/2025

CHECK BY:

DRAWN BY:

SCALE:

U se r I D

Fi le N am e:

Fi le

P at h:

FP

-2

-D et ai l.d w g

U :\2

4\

0.

\B

IM

\C

AD

\F ire -P ro te ct io n 6/

5/

2:

:0

PM

R iv er a-

Pe na

, K ris tia n

G

N

AV N E MLZ

E N G I N E E R S

VAN ZELM HEYWOOD & SHADFORD, INC.

10 TALCOTT NOTCH, FARMINGTON, CT 06032 - 1800

Connecticut | Massachusetts | North Carolina

CT: 860.284.5064 MA: 617.218.9976 NC: 704.799.7275

AMITY

ISSUED FOR BID

JUNE 06,2025

FP200

YRP

SSK/AJD

1/2"=1'-0"

FIRE PROTECTION

DETAIL

Sheets and Views
FP-001-LGND-FP-001
FP-101-FL01-FP-101
FP-200-Detail-FP-200

File details come from the government source that posted it. Updated .